• Title/Summary/Keyword: 배수공법

Search Result 283, Processing Time 0.025 seconds

Required Discharge Capacity for Horizontal Drains Installed with Vertical Drains (연직배수공법에서 수평배수층의 소요통수능)

  • 김현태;김상규;공길용
    • Journal of the Korean Geotechnical Society
    • /
    • v.18 no.1
    • /
    • pp.59-70
    • /
    • 2002
  • Horizontal drains are sometimes installed on the ground together with vertical drains in order to drain excess pore water. Taking into account the discharge capacity of horizontal drains, a new analytical method is developed in this paper, and then a new formula for the discharge capacity of horizontal drains is proposed. It is known from the analysis that the effect of the rate of surcharge loading is negligible in determining horizontal discharge capacity. This formula is described as the function of coefficient of consolidation, space of vertical drain, compression index, length of horizontal drains, and thickness of the compressible layer.

Evaluation of Applicability of Platform Fill Horizontal Drain Pipe System (선재하 수평배수관망 시스템의 적용성 평가)

  • Yoo, Chanho;Han, Yeonjin;Kang, Sooyoung;Baek, Seungcheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.13 no.3
    • /
    • pp.77-83
    • /
    • 2012
  • The most of horizontal drainages, which is composed of the aggregates made of sand and crushed stone, are used to improve the soft ground. However, where the aggregates are used as the horizontal drainage, it often brings about the delay of consolidation. For this reason, the horizontal drain pipe system is applied to properly improve the soft ground using a drainage pipe instead of horizontal drainage. This system is direct drain method for disappearing the excess porewater pressure which is caused by placing of fill on the soft ground. The large-scale field test was conducted in order to evaluate the applicability and constructability of the horizontal drain pipe system. The settlement characteristics of improved ground with horizontal drain pipe system was observed. It is also compared to the conventional soft ground improvement method to confirm its effectiveness.

A Study on the Soft Ground Improvement in Deep Depth by Application of PBD Method Using Model Test (실내모형실험을 통한 PBD공법이 적용된 대심도 연약지반 개량에 관한 연구)

  • Byun, Yoseph;Ahn, Byungje;Chun, Byungsik
    • Journal of the Korean GEO-environmental Society
    • /
    • v.10 no.6
    • /
    • pp.69-77
    • /
    • 2009
  • The shortage of bearing capacity and settlement, shear deformation may occur when constructing a structure such as harbor, airport and bridge on soft ground such as marine clay, silty clay, sandy soil because it is very soft. The various ground improvement methods were applied to obtain preceding settlement of soft ground and strength increase. The vertical drain method has been used to reduce the required time for consolidation of the soft ground. Especially, the PBD (Plastic Board Drain) has been widely used among in the vertical drain method. In this study, a behavior of characteristic was evaluated by operating a compound drainage capacity test about the PBD (Plastic Board Drain) method applied in soft clay in deep depth. As a result, the settlement gradually occurred with increase of surface load. The consolidation settlement was processed with dissipation of pore pressure after surface load of $500kN/m^2$. Accordingly, it was found that change of settlement through load steps was resulted from dissipation of pore pressure. It was also found that the drainage capacity of vertical drains was considerably reduced with pressure increase and time elapse.

  • PDF

Characteristics of Positive Pressure Distribution in Vertical Drainage Method to Prevent Buoyance (부력방지를 위한 연직배수공법의 양압력 분포 특성 분석)

  • Jongin Hong;Namcheol Kim;Youngshin Park;Donghyuk Lee
    • Journal of the Korean GEO-environmental Society
    • /
    • v.24 no.10
    • /
    • pp.33-39
    • /
    • 2023
  • As interest in the use of underground spaces increases, safety against water pressure acting on underground structures is required. In Korea, various buoyancy prevention methods are used to control such underground water pressure, and among them, the vertical drainage method with excellent economic efficiency, constructionability and stability has recently been introduced and applied. However, in the case of the vertical drainage method designed and constructed in the field, it is often designed and constructed depending on numerical analysis, making it difficult to expect practical stability judgment. Accordingly, in this study, an experiment was conducted to measure both pressure by installing a vertical drainage system using a model soil. Based on the measured value by the experiment and the numerical analysis value, we intend to compare and analyze the action positive pressure and use it as basic data for field application.

Required Discharge Capacity of Horizontal Drains for Fills on the Soft Ground (연약지반위에 성토시 수평배수층의 소요통수능)

  • 김현태;김상규;공길용
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.5
    • /
    • pp.83-96
    • /
    • 2001
  • 선행압밀공법에서 지반으로부터 배출되는 물을 신속히 배수시키기 위해 연약지반상에 수평배수층을 설치한다. 종전의 연구에 의하면(예, Giroud(1981), 한국도로공사(1998)), 배수층의 통수능은 성토하중의 성토기간 또는 압밀속도의 영향을 받으며, 성토기간이 짧을 때에는 과다한 배수능이 요구된다. 이 논문에서는 선행압밀공법에 적용 가능한 새로운 압밀해석방법을 사용하여 소요통수능을 재검토하고 새로운 실용공식을 제안하였다. 전반적인 압밀침하량이 5%이내에서 지연될 때에는 소요통수능은 성토기간의 영향을 받지 않는다는 것을 알게 되었다. 또한 소요통수량은 압축지수, 압밀계수 및 수평배수층의 배수거리의 제곱에 비례한다는 것도 밝혀졌다.

  • PDF

Development and performance verification of induced drainage method for leakage treatment in existing underground structures (운영중인 지하구조물 누수처리를 위한 유도배수공법 개발 및 성능 검증)

  • Kim, Dong-Gyou;Yim, Min-Jin
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.19 no.3
    • /
    • pp.533-549
    • /
    • 2017
  • In this study, drainage systems were proposed to drain the leakage of groundwater in the existing underground concrete structures. The system consists of drainage board, wire mesh, fixed nail, and mortar with mineral. In order to increase constructability, the drainage board and wire mesh were attached on the surface of cement concrete using the air nailer and fixed nail. The mortar with 30% of blast furnace slag was sprayed on the drainage board and wire mesh using the spray mortar equipment. The field test construction was carried out in a conventional concrete lining tunnel and concrete retaining wall for performance verification of the drainage system in the field. There was no problem with performance degradation in the drainage system for three years after construction. The bond strength tests were performed on the sprayed mortar at 14 days and about 3 years after field test construction. In case of attaching the wire mesh on the drainage board, the bond strengths of the sprayed mortar were 1.04 MPa at 14 days and 1.46 MPa about 3 years. In case of the drainage board without the wire mesh, the bond strengths of the sprayed mortar were 1.13 MPa at 14 days and 0.89 MPa, less than 1 MPa of bond strength criteria, about 3 years.

터널에서의 지하수 용수량 및 배수용량에 관한 특성

  • Kim Rak-Hyeon;Lee Dae-Yeong;Bae Gyu-Jin;Yang In-Jae
    • Proceedings of the Korean Society of Soil and Groundwater Environment Conference
    • /
    • 2006.04a
    • /
    • pp.312-315
    • /
    • 2006
  • 배수공법으로 터널을 설계할 때 다양한 지질조건에 따라 터널내로 유입되는 지하수 용수량과 배수관의 배수능력을 비교 검토하였다. 기존 설계 기준에 의한 터널 배수관은 다양한 지질조건을 가지는 대수층의 수리전도도에 따라 안정성 여부가 달라지는 것을 알 수 있었다. 기존 배수관 (${\Phi}300m/m$)으로 터널을 설계할 경우 투수성이 좋은 석회암 구간 및 파쇄대 구간에서는 문제가 생길 가능성이 높고, 풍화 받지 않은 암반층의 경우에는 터널길이 20km까지 지하수 용수량을 수용 가능한 것으로 판단된다.

  • PDF

A Study on the Evaluation Process Development for the Use of Outflowing Groundwater in Large-Scale Buildings (대형건축물의 유출지하수 활용을 위한 평가 프로세스구축에 관한 연구)

  • Kim, Jae-Yeob;Lee, Dong-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.3
    • /
    • pp.91-97
    • /
    • 2010
  • Recently, as a countermeasure to the buoyancy of a building, the use of permanent drainage methods have been on the increase, and these provide benefits both in terms of economical feasibility and efficiency. When a permanent drainage method is applied, some underground water can drain out. Korea has been designated by PAI (Population Action International) as a water-stressed country, and the use of outflowing groundwater is required for the efficient oversight of water resources. However, the evaluation process on the practical use of underground water is currently insufficient. Therefore, the amount of outflowing groundwater put to practical use and the standard for the water quality were examined in this research, with the aim of establishing anappraisal process on the practical use of underground water drainage. In addition, standards for the assessment of the treatment process and the application cost of underground water drainage were developed. On this basis, an evaluation process on the use of outflowing groundwater was developed and applied inthe field. The application result proved that it was possible to assess the initial investment cost and the maintenance and management cost in the field, and thesecan be compared to the costs when supplied water is used, which makes it possible to apply in the field.

Consolidation Characteristics of Soft Ground in Suction Drain Method (석션드레인공법이 적용된 연약지반의 압밀특성에 관한 사례 분석)

  • Kim, Byung Il;Kim, Do Hyung;Kim, Soo Sam;Han, Sang Jae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.6C
    • /
    • pp.287-294
    • /
    • 2009
  • Suction Drain Method is a relatively new technique to improve soft ground using vacuum pressure which can be directly applied to the soft ground through drains that the pore water pressure around them are decreased without changing total stress. This can accelerate volume changes and increase strength of the ground. This paper shows the results of field test of the suction drain method applied at dredged and reclaimed clay. To evaluate the improvement effects of soft ground by the suction drain method, this paper analyzed real-time field measurements to the results of the laboratory tests and numerical analysis. The comparisons of the settlement and shear strength between suction drain method and surcharge preloading method show possibilities for replacement of the preloading methods. The settlements by suction drain method were 2.3 times larger and undrained shear strength were 300%~400% higher than surcharge method. Moreover, the water content is decreased about 30% and the preconsolidation pressure is increased about $0.52kgf/cm^2$.