Korean Journal of Construction Engineering and Management
/
v.15
no.2
/
pp.79-86
/
2014
Construction project become larger and more complicated. Korea go through government complex relocation Mega-size program including many sub-projects which were complicated, long-term, and need extensive funding. Effective change management is very important for this kind of mega-project since it has many stakeholders and can't avoid continual change of schedule, budget, etc. Especially, change management process and system is very important for program success. When each project have changes, program is impacted by these changes. So, Change management is very important for effective program budget and time management. This study try to develop change management process and framework considering continuous changes in project level for effective program management. In addition, this study developed change management system and applied it to new mega-size program and analyze the effectiveness.
Purpose: It Vas intended to identify problems and derive improvement plans by grasping the current status of safety management of public institutions among construction Vork orders. Method: By comparing the disaster status of public institutions compared to the total construction Vork, the analysis Vas conducted based on the results of the evaluation of the level of safety activities of public institutions Vith a high disaster rate and the results of actual consulting. Result: As a result of comparing and analyzing the current status of safety management of public institutions, the current status and problems of safety management in public institutions Vith a high accident rate Vere similarly discovered. Safety management organizations, document management systems, safety management systems, and risk assessment activities are operated Vithout reflecting the size and characteristics of the organization, so improvement in the relevant field is needed. Conclusion: Safety-related professionals and organizations should be formed according to the size of construction orders, and responsibility and authority should be clearly assigned. Since risk assessment is conducted formally to prepare a safety and health ledger, it is necessary to derive risk factors to prevent safety accidents for the actual construction. It is expected that the level of safety activities can be improved if it is improved by reflecting the size and characteristics of public institutions.
Proceedings of the Korea Contents Association Conference
/
2013.05a
/
pp.437-438
/
2013
최근 BIM(Building Information Modeling)은 건설사업의 뜨거운 이슈로 부각되고 있으며 기존의 건설공사에서 2D로 관리되고있는 각종 성과물을 3D로 관리하면서 간섭검토, 에너지분석, 시공성검토 등 기존의 2D로 하기 어려웠던 다양한 의사결정 등을 지원할 수 있는 새로운 기술이다. 하지만 이렇게 다양하게 BIM이 활용되기 위해서는 활용목적에 맞는 성과품 및 산출물이 적절하게 만들어져야 하나 건축분야만 일부 제시되고 있을 뿐 토목분야는 사례를 찾아보기가 힘들다. 이에 국외 토목 BIM 발주사례와 국내 건축 BIM 관련 가이드, 현행 2D 기반의 성과품 납품체계 등을 조사하여 도로분야의 BIM성과품 납품체계 개발방안을 제시하였다.
Proceedings of the Korean Information Science Society Conference
/
2002.10c
/
pp.145-147
/
2002
건설CALS/EC 체계에 따라 도로건설공사에서 생성되는 설계문서를 발주자, 설계자 및 시공자 등 참여 주체간에 보다 효과적으로 교환하기 위해서는 특정 하드웨어나 소프트웨어에 구애를 받지 않으면서 표준화된 전자문서 정보체계에 따라 전자화해야 한다. 이를 위해 다양한 유형을 갖는 설계문서에서 반복적이면서 빈번하게 나타나는 공통 구성체계와 정보요소를 대상으로 설계문서 공통 DTD를 개발하였다.
Journal of the Korean Institute of Landscape Architecture
/
v.40
no.4
/
pp.104-113
/
2012
This study aimed to find out the improvement plan through analyzing the perception of the expert group engaged in landscape architectural construction and to focus on analyzing the expert groups' experience on Landscape Construction Defects (LCD), defect liability, warranty period, and implementation of the defect liability. The results are as follows: 1. Regarding the experience on the LCD, landscape construction contractors were an awareness of the LCD issue at a serious level, while public-sector clients recognize moderately the LCD issue; and on the first priority in defect implementation, landscape construction contractors considered repair cost while public-sector clients value the identifying causes of defects. 2. In disagreement on the defect liability, landscape construction contractors attributed it to client's lack of responsibility for maintenance while public-sector clients ascribed it to the absence of dealing a criteria with LCD, and regarding the appropriate defect implementation, public-sector clients preferred the following objective by dealing the criteria with LCD while landscape construction contractors advocates by sharing the responsibilities for dealing with LCD based on the identified causes of construction defects. 3. Regarding the warranty period, the public-sector clients considered the 2-year warranty period as appropriate while landscape construction contractors considered it comparatively long, and concerning the commencement of defect warranty period, the public-sector clients viewed it as it should commence to cover the overall completion of the construction while landscape construction contractors perceived it to start on the completion of each work. 4. As for the improvement of the defect implementation system, public-sector clients considered it necessary to establish the objective dealing the criteria with LCD while landscape construction contractors viewed the legislation of maintenance duty. Also, with regard to the important value in establishing and dealing the criteria with LCD, public-sector clients pointed out the objective of the criteria for determining the defects per work type while landscape construction contractors suggested client (user)'s maintenance duty. Because of research, because the system in dealing with LCD is an absence of LCD management agency and dealing the criteria with LCD, it is needed to establish an LCD management agency and make the system in dealing with LCD.
서울특별시회는 지난 4월 13일 서울시 도시기반시설본부와 합동으로 (주)동보엔지니어링이 시공 중인 '마포석유비축기지 재생 및 공원조성 기계설비공사' 현장을 방문하여 안전 및 품질점검을 실시했다. 이날 품질점검에는 발주처인 서울시 도시기반시설본부 관계자를 비롯하여 감리단장, 기계감리 등이 참석하여 시공현황을 체크했다. 서울시회 김수철 상임부회장은 (주)동보엔지니어링 정광일 대표와 김원근 현장소장에게 "다른 현장보다도 더욱 우수한 공사품질과 체계적인 현장관리, 타 공중간의 소통에 의한 긴밀한 업무협조로 준공까지 공사 진행에 차질이 없도록 솔선수범하여 우수 시공사례 현장이 될 수 있도록 심혈을 기울여 달라"고 부탁했다.
소비자 욕구의 다양화, 개성화 및 고도화와 생산체제의 소품종 다양생산체제에서 다품종소량생산체제로 물류환경의 변화가 급속히 진행되고 있다. 운송ㆍ보관ㆍ하역ㆍ포장ㆍ정보 등 각 기능별로 나누어져 있는 물류관련 용어는 업종별ㆍ물류단계별ㆍ기업별로 서로 다르게 사용되고 있어 업무의 효율을 저하시킬 뿐 아니라 단계별 물류과정을 체계적이고도 효율적으로 관리하는 데 막대한 지장을 주고 있다. 나아가 물류기기의 발주업체나 생산ㆍ공급업체에서도 각기 상이한 용어가 사용됨으로써 사후관리에도 어려움을 주고 있다.(중략)
Journal of the Korea Academia-Industrial cooperation Society
/
v.19
no.3
/
pp.119-129
/
2018
The Ministry of Land, Transport and Maritime Affairs has promulgated the mandatory design of BIM for road projects of more than 50 billion won by 2020 under the Basic Plan for the Sixth Construction Technology Promotion. As a result, major public clients are attempting to implement BIMs that are appropriate to the situation of each institution. On the other hand, it is difficult to design and construct a proper BIM and accumulate BIM information of the ordering organization because the technical guidelines and standard classification system that can perform BIM effectively have not been presented sufficiently. The characteristics of the road should be managed systematically, e.g., atypical objects, such as earthworks, which are constantly changing along a line; large objects, such as bridges and tunnels; and facilities, such as signs and soundproof walls. To achieve this, a multitude of standard systems should be developed and disseminated, but there have been insufficient studies on practical methods. To solve this problem, this study developed a BIM standard object classification system in the road sector to meet the international standard, accommodate a multi-dimensional information system, and provide a more effective BIM standard information environment that can be utilized easily by practitioners.
Korean Journal of Construction Engineering and Management
/
v.7
no.3
s.31
/
pp.138-148
/
2006
The construction supervisors of the public companies are usually responsible for process management, quality management, safety management, and many other various tasks that occur during construction project. Public companies such as Korea Highway Corporation have developed a framework and manual for management and supervision of construction projects. But, there has been the change of business environment such as increase of private investment project and the introduce of construction management system recently. It has been necessary for construction supervisor to streamline the current project management system in the owner's aspect in order to cope with the expected new challenges. Accordingly, this research has been investigated and analyzed the operation system between Korean supervisor and foreign supervisor in their public corporation. This research has suggested the advanced project management in their public corporation. Especially, this study has proposed the construction management manual for supervisors such as inspectors training, supervisors construction manual, and supervisors training road map.
Korean Journal of Construction Engineering and Management
/
v.7
no.6
/
pp.132-140
/
2006
On December, 1996, Construction Management(CM) was introduced in Korean construction industry due to its managerial efficiency proven in the international construction industries. However, It have had serious problems with many regulations, standards, manuals and details of practices considering its constituents and industry conditions. Especially, there were controversial points in the CM fee estimate; difference between the fee on the owner's view point and that from contractor's that impedes appropriate CM services. Therefore, this paper is to analyze public construction projects into Cm fee calculation such as fee as a percent of construction cost, cost plus fixed fee and contract price, and analyzed what is irrationality and why irrationality is made. So it makes a contribution to a study on standards for paper CM fee calculation.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.