The export demand for various public services of e-government is growing. This study defines the new services that are required in each step of export processes for public services in order to develop the new services for supporting the commercialization of the export public services. And the study arrives at a conclusion of the main problems and requirements of the current export processes for the public services through the previous literature, the open-ended questions and the focus group interview. The new services are divided into six steps including the general information and consultation of the export public services; specifically, 'evaluation of the export capabilities', 'information of export pubic services', 'network of export companies', 'knowledge exchange of export', 'guide map of export information' and 'place for communication'. Furthermore, the score test about importance of 14 detailed services and the ease of implement is conducted. Based on the results of the test, Portfolio Evaluation Quadrant analysis derives a conclusion that 'the guide map service of export information' in the step 5 is preferentially considered to be in need of implementation.
Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
Journal of the Korea Institute of Building Construction
/
v.10
no.1
/
pp.81-89
/
2010
Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.
Korean Journal of Construction Engineering and Management
/
v.14
no.2
/
pp.131-140
/
2013
Econometric forecast models based on past time-series data have been applied to a wide variety of applications due to their advantages in short-term point estimating. These models are particularly used in predicting the impact of governmental research and development (R&D) programs because program managers should assert their feasibility due to R&D program's huge amount of budget. The construction governmental R&D programs, however, separately make an investment by dividing total budget into five sub-business area. It make R&D program managers difficult to understand how R&D programs affect the whole system including economy because they are restricted with regard to many dependent and dynamic variables. In this regard, system dynamics (SD) model provides an analytic solution for complex, nonlinear, and dynamic systems such as the impacts of R&D programs by focusing on interactions among variables and understanding their structures. This research, therefore, developed SD model to capture the different impacts of five construction R&D sub-business by considering different characteristics of sub-business area. To overcome the SD's disadvantages in point estimating, this research also proposed the method for constructing quantitative forecasting model using qualitative data. Understanding the different characteristics of each construction R&D sub-business can support R&D program managers to demonstrate their feasibility of capital investment.
Korean Journal of Construction Engineering and Management
/
v.15
no.3
/
pp.23-30
/
2014
Overseas construction orders of domestic companies had been increased significantly in a short period from $10.9 billion in 2005 to $64.9 billion in 2012. However experts are concerned that quality of growth will not support quantitative growth. This study suggest concentrate competencies for not only winning in bid but also successful execution of domestic companies. 4 Steps which are Pre-Marketing, Bid-Preparation, Bidding, Contract Phase are defined for competency assessment. After drawing specific tasks by phase, survey asking importance and capability of the tasks to the person in charge of bidding and site was conducted by utilizing Likert 7 point scale. According to the result of IPA analysis, domestic construction companies need to ensure internal competencies; Project risk review, Bid team organization, and external competencies; Client needs grasp, Localization strategy, Cooperation establishment. Hearafter domestic construction companies will be able to utilize the result of the study for setting bidding strategy for winning in bid and improving earning rate.
Korean Journal of Construction Engineering and Management
/
v.22
no.6
/
pp.15-23
/
2021
As the construction production system is reorganized as part of the construction industry innovation plan, direct construction is expanding. According to this trend, this study analyzed the impact and problems of the expansion of direct construction through the position of the construction industry and a study of foreign cases. In addition, by diagnosing the impact of the measures to expand direct construction from various aspects, countermeasures were suggested to suitably apply the direct construction mandatory system. Also, for each alternative, effects and problems were evaluated through interviews with experts in policy/administrative and architecture fields. The alternatives for expanding and improving the efficiency of the direct construction mandatory system derived from this study are four items: granting the discretion of the client, differentiation by scale of construction, utilization of construction guarantee system, and introduction of flexible working group leader system. As a result of the expert interview, all of them were evaluated to have a positive impact directly and indirectly on the expansion of direct construction. This study contributes literature to the application of the direct construction mandatory system by examining the current status of direct construction, and suggests a direction for expanding direct construction through deduction of alternatives for applying the direct construction mandatory system and expert evaluation.
This study aimed to understand the current status of science and engineering university(SEU) R&D operations depending on the research project characteristics(e.g., stages and characteristics), then provide implications for future university R&D support systems and related policies. Hence, an online survey targeting SEU R&D recipients was conducted between October 4th to November 5th, 2021. Analyzing 445 valid data using the Apriori algorithm, 16 association rules for R&D operation according to the research project characteristics show that regardless of research characteristics, SEU's R&D projects, particularly in applied research, were funded or operated under the leadership of government or public institutions. For basic research, individual researchers had a higher level of autonomy in determining research topics; yet, they had a short duration (3 years) and a unit of evaluation period of more than 3 years. These findings can be empirical evidence for revealing the relationship among various variables in operating SEUs' R&D.
Korean Journal of Construction Engineering and Management
/
v.24
no.2
/
pp.50-58
/
2023
Bid-rigging is a common issue in public construction projects, and appropriate sanctions are required from the relevant authorities. This study analyzes the need for an optimal enforcement model to prevent bid-rigging by considering both civil and criminal aspects. Recently, there have been overlapping sanctions under the Fair Trade Act, such as fines imposed by the Fair Trade Commission and civil lawsuits filed by the client for damages. The purpose of this study is to evaluate the effectiveness of penalty surcharges and compensation systems for preventing bid-rigging, and to consider the possibility of overlapping sanctions in public construction projects. It was found that overlapping sanctions under the Fair Trade Act can be helpful in improving the system. However, in cases where the state is the plaintiff for damages in a lawsuit, it is necessary to consider the penalty surcharge and sentence, reduce the penalty surcharge for joint acts, refund the surcharge after a final judgment, and consider the damage compensation system when imposing a surcharge. This study contributes to the development of an efficient enforcement model to suppress bid-rigging in public construction projects by analyzing the improvement effects of sanctions and compensation.
KSCE Journal of Civil and Environmental Engineering Research
/
v.28
no.5D
/
pp.655-664
/
2008
Lean Construction recommends implementing site production management by measuring the reliability of daily production tasks, collecting the causes for failure of incomplete tasks, and identifying problems in the existing process based on the collected data. Although many research projects have been performed to introduce Lean Construction in Korea, there are not many cases in which day-to-day site production operations has been stringently evaluated based on such methods. This paper introduces three cases in which such techniques were implemented on a residential, civil infrastructure and plant project. On each project, process maps were created with the superintendents and daily production meetings were held for two weeks. Consequently, the average PPC for the three projects was 79% for PPC and 16% for PAT. In addition, the majority of the failures were due to 'Directive/Plan' and 'Prerequisites.' The results show that project stakeholders (owners, contractors, etc.) lack the ability to plan ahead and keep to their plans, and also lack the capability to synchronize workflow between themselves. The results also reveal that project participants need to be more proactive in solving process problems on site and also need to be better educated in Lean concepts and methodologies.
Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
KSCE Journal of Civil and Environmental Engineering Research
/
v.43
no.1
/
pp.109-117
/
2023
Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.
Journal of Korea Spatial Information System Society
/
v.2
no.2
s.4
/
pp.5-23
/
2000
Since 1995, national and local governments have competitively initiated many and large GIS projects and audit for the projects becomes an important issue. So far, the audit in the Information Technology(IT) area has tried to deal with the issue but ineffectiveness has been found for the successful GIS project management. Effective auditing is a critical element for the project management. In order to establish a proper audit model for the GIS projects and to promote auditing activities in the projects, this study constructs two hypotheses and tries to prove them. The hypotheses are as follows : 1) For a good audits model for GIS, unique characteristics of a GIS project audit items and the scope of the audit need to be identified. 2) The scope of audit needs to be classified according to the requests from tasks in the projects. To prove the hypotheses, this study analyzes positive aspects of audit in IT and construction projects, clarifies the audit items in GIS projects by comparing with them, and classifies the scope of the GIS audit based on various types of GIS projects. As a results, 5 types of the GIS audit are identified : (1) audit for project management, (2) audit focused on IT, (3) audit characterized by GIS technologies, (4) GIS database audit and (5) consulting services for critical problems in the projects. In addition, 4 criteria in classifying the GIS projects are suggested for the GIS audit. The 4 criteria are domain, scope, duration, and GIS applications technologies. Especially, GIS technology considered in this study includes GIS software, methodologies for GIS development, GIS database and quality control of GIS data, which are not usually reflected in the existing studies about in GIS audit. Because the GIS audit depends on a type of GIS projects, scopes of the audit can be flexibly reconstructed in accordance with the types of GIS projects. This is a key to effective and realistic audit for the future GIS projects. Strategies for effective GIS audit are also proposed in terms of the following: GIS project management, goal establishment in each audit stage, documentation from GIS audit, timing strategies for intensive GIS audit, and designing team structure.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.