Major Risk Factors to Implement CM at Risk Pilot Project on the Public Sector (시공책임형 CM 발주방식 공공부문 시범사업 사례를 통한 리스크 도출)

  • Han, Jonghoon;Kim, Kyungtae;Ahn, Yonghan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.3
    • /
    • pp.61-69
    • /
    • 2018
  • The buildings are getting enormous and more complex as well as the requirement of the owner which wants diverse and efficient. Moreover advanced management is necessary for construction services and a new method of delivering project is now required. In order to expand the delivering method and the construction industry, we have to introduced the CM at Risk method. However, despite the fact that six years have passed already the CM at Risk regulation was introduced, the contract amount in significantly lower than that of the CM for fee, and also there is no CM at Risk project in the public sector. As a result, three pilot projects are currently underway for the LH(Korea Land & Housing Corporation) in order to set up a CM at Risk for the public sector. However, detailed regulations related to CM at Risk have not yet been implemented in Korea. Therefore, in this study, I am trying to understand the risks that could incur when practitioners participate in the three pilot projects that are currently underway and employed in the public sector wherein the CM at Risk is normally introduced. Based on the results of this study, It will be able to utilize as a basic data for future CM at Risk delivery system improvement and enactment.

A Selection Model of Suitable Tendering System for Public Construction Projects (공공건설공사의 최적 입찰방식 선정모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.164-174
    • /
    • 2008
  • It is crucial In decision making to select a project delivery system (PDS) adjusted accordingly to the project characteristics. Furthermore, selecting a tendering system is the kernel in the process of selecting PDS. In October 2007, the Ministry of Finance and the Economy of Korea launched two new project delivery systems, "Best Value Contract (Design-Bid-Build)" and "Bridging Contracts (Design-Build)" by revising enforcement ordinances of "Act on Contracts to Which the State is a Party" to provoke the tendering systems. In order to support the proposed purpose, this research developed a selection model for suitable tendering system, which helps a public owner select a tendering system appropriate to the project characteristics. First, the framework of the model was set throughout analyzing previous researches and interviewing relevant experts. Additionally, by analyzing the survey result from 265 experts engaged in architectural and civil engineering business, the relative weights of the selection factors and the effectiveness values of the alternatives were suggested as the quantitative evaluation references. Finally, the practical guideline was suggested to apply this model to three public projects scheduled to be delivered. The result of applying the model to three case projects showed that further researches were needed to make the selection process logical and to suggest the standard weights and effectiveness values according to project type.

Improvements for Ordering and Bidding of VE in Convergence Era (융복합시대 설계의 경제성 등 검토(VE) 발주 및 입찰시 문제점과 개선방안에 관한 연구)

  • Park, Myeong-Su;Yang, Hae-Sool
    • Journal of Digital Convergence
    • /
    • v.14 no.3
    • /
    • pp.25-33
    • /
    • 2016
  • The author of this study conducted a survey with the expert groups who are currently handling hands-on works in convergence cities, ordering organizations, construction management companies, contractors, schools and research institutes, etc. The results of empirical analysis can be summarized as follows: First, there is no difference in distribution among the problems with position and the bidding system of private contracts. Second, there is relevance between position and the adequacy of current design VE ordering system, indicating different recognition. Third, there is no difference in distribution between organizations and the adequacy of current design VE ordering system. Fourth, there is difference in distribution between organizations and service price adequacy and there is difference in recognition by organization when organizations mutually recognize the service price adequacy. Fifth, there is difference in distribution between career and the necessity of the participating companies' qualification. Sixth, there is difference in distribution for the adequacy of career and the adequacy of participating companies' requirements. No problems have been found with the adequate service period according to private contract bidding system, but the necessity of participating companies' qualification and participating companies' requirements.

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.

Case Study in Current State of Amount of Order for Turnkey Project (설계 $\cdot$ 시공일괄입찰제도의 수주현황 사례분석)

  • Lee Yang-Kyoo;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.197-202
    • /
    • 2004
  • Turnkey contract system is an effective ordering system for the organizations that technical engineers are insufficient in their construction projects. It is possible to reduce project duration and to improve project Quality in an integrated contract system between design and construction. However, owners can have a difficulty caused from unitary responsibility system. This study analyzes present situation and problems of turnkey contract system in our country. The results includes various methods for improving the system based on the analysis of bid price nd selection procedure.

  • PDF

A Study of Integrated Project Delivery(IPD) Methods Based on Building Information Modeling(BIM) (BIM 기반의 IPD 발주방식에 관한 연구)

  • Shin, Kyoo-Chul;Ham, In-Ho
    • Journal of The Korean Digital Architecture Interior Association
    • /
    • v.12 no.3
    • /
    • pp.15-25
    • /
    • 2012
  • The purpose of this research is to explore the necessity of utilizing IPD methods along BIM based project operation in domestic construction market. IPD is relatively new project delivery methods focused on the collaboration of stockholders based on BIM technology. IPD is focused on the multiparty contract process rather than multiple bilateral contracts under Traditional Project Delivery Methods. The research method is to investigate the IPD standard contract documents, successful IPD project cases in the U.S. The research results are as follows. The model for an IPD standard contract needs to be developed for the application to a real construction projects. Various types of IPD model contract need to be developed to accommodate the requirements of industry and stockholders in Korea.

A Basic Study on the Application and Improvement of Delivery System for Interior Design of the Public Sector (공공부문 실내건축 설계용역 발주방식 개선을 위한 기초연구)

  • Nam, Keong-Woo;Jang, Myung-Houn
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.67-68
    • /
    • 2018
  • In the public sector, the number of interior construction projects is continuously increasing. When the interior construction is carried out, it is largely divided into design and construction stages. On the other hand, in order to place an order in the public sector, it requires institutional conditions such as business type, price criterion, award criteria, and guarantees. But in th case of interior design, it is necessary to establish a basis law to be applied for ordering. Therefore, this study analysed the necessity of improving the system related to the interior design order in the public sector and suggested ways to improve the system. In the future, we will continue to conduct research based on this research, and if institutional improvement is made through the proposed methodology, it will be possible to apply effectively not only in the public sector but also in the private sector.