A Project Delivery System Selection Model for Large Public Construction Projects (대형 공공공사의 적정 발주방식 선정모델)

  • Hyun Chang-Taek;Seo Yong-Chil;Lee In-Keun;Ryu Kil-Sang;Lee Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.71-80
    • /
    • 2000
  • Project delivery systems determine the relationship, responsibility, authority and the scope of works of those involved in project, hence, optimum project delivery system should be selected to so that construction project would be executed successfully, Until now, the traditional design-bid-build mainly has been used for public projects, but the government is making efforts actively to introduce other methods such as design-build, alternative bidding by its policy. However, delivery systems should be determined through considering physical projects characteristics, owner's goals, external factors, etc, rather than government' policy. Therefore, the purpose of this research is to propose objective delivery system selection criteria and delivery system selection model, which help owners to select the suitable delivery system through quantitative and reasonable manner.

  • PDF

A Study on the Selection Method of Project Procurement System based on Owner's Requirement (발주자의 요구사항을 고려한 발주방식 선정 방법에 관한 연구)

  • Nam, Hye-Won;Ahn, Kyung-Hwan;Kim, Chang-Gyo;Lee, Jea-Sauk;Chun, Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.126-135
    • /
    • 2009
  • Recently, operation of highway is the complex digital Infrastructure based on complicated IT. The application of IT is increasing more and more in digital Infrastructure. Though IT is very convenient, if unpredicted operating risk of highway occurs, widespread damage can be large. When operating risk of highway occurs, road users are out of smoothly-run service because of the operating interruption. This risk causes unpredicted operating management cost and additional maintenance cost. It will excess over the planned operating cost, which may leads to users's unsafety and operator's insolvency because of income loss. Until now, related studies to find out the risk are not sufficient. The purpose of this study is to suggest risk cost items and to estimate the reasonable risk cost by using simulation method in case of occurring the huge power failure at the operating digitalized highway. This study indicates the several plans to hedge against risk cost and the management of highway project. From now on, it will be used as basic data to confirm the soundness of operating system in Digital Infrastructure.

The Improvement Plan of Project Delivery Systems in the Public Construction Projects (공공건설사업의 발주방식 개선방안)

  • Choi, Eun-A;Kim, Hyun;Park, Sung-Yong;Cho, Hyeong-Jin;Lee, Sang-Beom
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.509-512
    • /
    • 2008
  • Clients demands have been changed by construction circumstances such as high-technology, mega-projects, and the complexity of construction. Advanced foreign countries have already introduced and applied new project delivery systems(i.e, CM, DB, etc.) to deal with the change of such that. Recently, Korea also launched two new project delivery systems, "Best Value Contracts to which the State is a Party" to provoke the project delivery system, which helps a public owner select a project delivery system appropriate to the project characteristics. Even though government has made his efforts as stated above, some clients have still used those to public construction projects uniformly. That is because there are not a selection criteria of project delivery system for clients. Therefore, this paper proposes the selection criteria of project delivery system based on project types in the public large construction projects.

  • PDF

A Selection Model For Power Plant Project Delivery Method (화력발전소 발주방식 비교를 통한 적정 발주방식 선정 모형)

  • Kim, Sun-Kuk;Park, Jong-Kyoo;Park, Chan-Sik;Son, Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.66-77
    • /
    • 2007
  • With the electricity industry structure reformation of the government in April, 2001, Korea Power Electric Corporation was divided in to Korea water power nuclear power and 5 thermal power plant. After, various delivery method is introduced and applied for active profit creation according to the competition between each development companies for the public company privatization. However, the current situation does not satisfy the project participant by selecting the delivery method without reflecting the business goal and project characteristics of power plant construction business. The objective of this study is to research the influencing factors that should be considered to select the delivery method in thermal power construction business and develop a standard of selection of appropriate delivery method through questionnaire and interviews to establish a model to select the delivery method that fits the business goal of the subject of delivery. In the future, if the delivery method selection model suggested in this study is applied, it is expected to select the appropriate delivery method of power plant construction business by effectively reflecting the business goal, characteristics and demand of the delivery subject, and characteristics of the construction business apart from the existing customary practices that decided the delivery method dependent on the subjective and experience based judgement.

Project Delivery Systems and Project Performance;An Evaluation Model for Public Construction Projects (공공건설사업의 발주방식 선정 및 성과평가 모델)

  • Yu, Il-Han;Kim, Kyung-Rai
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.41-47
    • /
    • 2007
  • The selection of the reasonable project delivery system (PDS) is crucial for a successful performance of a project, which means to achieve project objectives. Furthermore, the project performance has been tightly related to the selection of PDS appropriate to pertinent project characteristics. In this context, the ministry of finance and economy of Korea launched two new project delivery systems called "Best Value Contract (Design-Bid-Build)" and "Bridging Contract (Design-Build)" in October of 2007 by revising enforcement ordinances of "Act on Contracts to Which the State is a Party". For efficient operation of the new project delivery systems, this paper suggested a PDS selection model which supports decision making of the reasonable PDS for a pertinent project by assessing characteristics of the public construction projects, both quantitatively and qualitatively. In addition, a PDS performance evaluation model was proposed in order to get feedback on the result of the PDS selection and the operation for the succeeding project. The standard models suggested in this paper might be used as a tool to support the decision making of the public organizations.

  • PDF

The Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects (공동주택 건설공사의 발주방식 영향요인 분석)

  • Moon, Hyun-Seok;Hong, Tae-Hoon;Koo, Gyo-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.3
    • /
    • pp.75-84
    • /
    • 2008
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods. However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough prcject characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the Analysis on the Impact Factors of Delivery Method for Multi-Family Housing Projects.

Determining Decision-making Factors for the Selection of Contract Methods in Public Construction (공공공사의 발주방식선정을 위한 의사결정요인 연구)

  • Kim, Dae-Gil;Lee, Ung-Kyun;Lee, Hak-Ju
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.405-412
    • /
    • 2015
  • The procurement of public construction, which has been selected mainly on the basis of the work experience of a department of public agencies that award construction contracts or those in charge of ordering, has not been executed through an objective selection process considering the construction types or characteristics. Thus, as a preliminary study on developing a model for the selection of contract methods, this study intends to analyze and present the key factors affecting the selection of procurement methods in public construction. Through a literature review on the existing methods, foundational factors were first presented, based on the analysis of these factors, the final influence factors were proposed. As a result, 6 factors contractor's characteristics, the environment of the construction market, relevant organization, the characteristics of a project, costs, and responsibility factors were determined, and 14 sub-factors were selected. The factors presented in this study will be used as base data for developing a decision making support model for the selection of contract methods in public construction.

Analyzing Characteristics of Design-Build Delivery System in Korea Using System Dynamics Modeling (시스템다이내믹스 모델을 이용한 국내 설계시공 일괄입찰 발주방식 특성분석)

  • Lee, Hyun-Soo;Ji, Sae-Hyun;Park, Moon-Seo;Song, Sang-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.119-131
    • /
    • 2007
  • Design build (DB) is a construction project delivery system which has become one of the favored ones and the growth of DB by the public agencies has been steadily increasing. DB can be viewed as an evolutionary project delivery system, since DB project team members collaborate on work with each other, keep seeking cost effective and innovative alternatives that meet the construction needs of the project. Thus DB outperformed others in delivery speed, cost saving, and turnover quality. In Korea, DB projects likewise have steadily increased that it is needed to analyze characteristics of DB delivery system in Korea. For that purpose, this research would offer an analysis of characteristics of DB delivery system in Korea using system dynamics model with investigating the public market trend, comparing DB performance to DBB, and analyzing questionnaire survey.

An Analysis on the Problems of General Conditions for Domestic Design-Build Construction Projects (국내 설계${\cdot}$시공일괄발주방식을 위한 공사계약 일반조건의 문제점 분석)

  • Seo Young-Min;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.303-306
    • /
    • 2003
  • Although design-build construction projects have recently increased. general conditions of construction contract are not reflecting the characteristic of design-build construction projects neither performing its fundamental roles as implying many claim elements. So. this study aims to propose the basis for improving the general conditions of the domestic design-build construction projects. This study reviews literatures associated with design-build construction contract and analyses domestic general conditions into foreign standard forms of general conditions. Additionally, it is examined the problems of design-build construction contracts and performed questionnaire survey to the practitioner in the construction contract field. In doing so, this study suggests the direction for improving general conditions of domestic design-build construction projects.

  • PDF

The Selection Criteria of Delivery Method based on Project Characteristics;focused on the Multi-Housing Projects (프로젝트 특성에 따른 발주방식 선정기준;공동주택 건설 사업을 중심으로)

  • Moon, Hyun-Seok;Cho, Kyu-Man;Hyun, Chang-Teak;Koo, Gyo-Jin;Hong, Tae-Hoon
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.390-395
    • /
    • 2006
  • Recently, construction industry demands have been changed by domestic construction circumstances such as high-technology, mega-projects, and the complexity of construction. In order to deal with the change of such a domestic construction circumstances, the Ministry of Construction and Transportation (MOCT) has introduced advanced delivery methods (i..e, CM, DB, etc.). However, the advantages and disadvantages of the advanced delivery methods have not been effectively applied for previous projects. The reason for this is that the "Reviewing Standard for the Large-scale Construction Bidding Method" has not reflected enough project characteristics when the delivery method is selected in the project planning phase. Therefore, this paper proposes the model for selecting criteria of delivery method based on project characteristics in the Multi-housing projects.

  • PDF