• Title/Summary/Keyword: 리스크 우선순위

Search Result 48, Processing Time 0.023 seconds

Assessment of Risk Factors for Application of Exterior Insulation Board in Cast-in-place Concrete Form System for Apartment (공동주택용 외단열 동시타설 공법 적용을 위한 리스크 요인 평가)

  • Cui, Jun-Long;Kim, Taehoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.204-205
    • /
    • 2015
  • Exterior insulation board in cast-in-place concrete form system could reduce construction period and improve quality in apartment construction. However, the method is progressed with insulation and concrete frame works at the same time, then risk is increased in duration control and quality management. Therefore, this paper analyzed risk factors through FMEA method. We found that the key risk factors delaying schedule was insulation material that soaked in the rain and quality defects on the insulation material joint. Based on this research, the risk management approach should be developed for improvement of method activation.

  • PDF

Development of Priority Assessment Model for Recovery from Urban Flooding considering Lifelines with Resilience (도심지 라이프라인을 고려한 도시침수피해 복구우선순위 산정모델 개발)

  • Hyung Jun Park;Chan Jin Jung;Dong Hyun Kim;Seung Oh Lee
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2023.05a
    • /
    • pp.21-21
    • /
    • 2023
  • 현재 구축되어있는 방재시설의 능력은 기후위기로 인해 수용가능한 극한강우량의 범위를 넘어서고 있어 대형화된 홍수로 인한 피해가 꾸준히 발생하고 있다. 이로 인해 잠재적 홍수로 인한 도시회복도 관리와 홍수로 수반되는 피해에 대한 복구의 중요도가 높아지고 있다. 회복도는 도시의 재해 취약성, 저항, 적응, 복구, 완화에 대한 능력을 포괄하는 개념으로써 최근 주목받고 있는 개념이지만 대부분의 연구는 주로 시설에 대한 회복도 평가가 이루어지고 있다 (Sen et al.,2021). 또한 재해 후 도시복구에 관한 연구는 다수 존재하지만 복구에 따른 지역의 회복도 변화와 라이프라인과 같은 주요 시설의 복구에 따른 회복도 차이를 고려한 연구는 미비한 실정이다. 따라서 본 연구에서는 도시침수 발생 후 라이프라인을 고려한 도시복구 우선순위 산정모델을 개발하고 재해관리의 효율성 향상측면에서 도시의 기능적 회복도를 평가하였다. 이를 위해 라이프라인 중 도로 복구결과의 평가를 위하여 리스크 매트릭스 기법을 이용한 도로위험도평가를 수행하였으며 도시의 회복도를 측정하였다. 회복도를 크게 홍수로부터 도시가 받은 영향과 재해복구역량으로 구성하였으며 정량적인 평가를 위해 각각 손상함수와 재해재난목적예비비를 활용하여 산정하였다. 이후 복구우선순위를 산정하였으며 복구와 도시회복도와의 관계를 분석하기 위하여 재해연보 자료를 기초로 회귀분석을 통해 복구비용을 추정하였다 (유순영 등.,2014). 시범지역에 적용한 결과 시설 및 도로 복구에 따른 도시영향의 변화보다 복구비사용으로 인한 재해복구역량의 변화가 더욱 크다는 것을 확인하였다. 이는 재해재난목적예비비의 중요성이 크다는 것을 의미하며 향후 추가적인 인문학적, 법제적 요소가 회복도에 미치는 영향을 연구한다면 도시회복도 향상 및 도시복구에 관한 정책적 의사결정에 큰 도움이 될 것이다.

  • PDF

A Comparative Analysis of Risk Impacts on Cost Overrun between Actual Cases and Managers' Perception on Overseas Construction Projects (해외 프로젝트 시공단계 리스크 요인의 실제 비용 초과 영향과 현장관리자 인식 차이 분석)

  • Lee, Kyung-Tae;Ann, Hannah;Kim, Jae-Won;Kim, Ju-Hyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.3
    • /
    • pp.52-60
    • /
    • 2021
  • Due to the significant size of overseas construction projects, the cost overrun has enormous impacts on the financial status of construction companies. The managers' appropriate perception and identification of key risk factors in the construction phase notably affect the performance of projects. However, the actual impacts of risk factors and local manager' s perception of them could be deviated. For this reason, we aim to compare the performance of actual cases and general opinions of responsible practitioners in terms of risk factors relevant to cost overruns in order to present a practical strategy for risk management. Firstly, factors classified from literature review were used to simulate 290 cost overruns data sets from 20 cases by introducing Monte-Carlo Simulation and were ranked by standardized coefficients through multiple regression analysis. Secondly, a survey was conducted against 42 local managers to rank their perception of impact on cost overrun with identical factors by using Stepwise Weight Assessment Ratio Analysis (SWARA). Comparison results show that conflicts such as 'conflict with subcontractors' and 'conflict with the local community' have caused excessive cost overrun. However, managers' perception of these as less significant than the actual influences and consider other risks such as 'material price fluctuation' and 'construction quality errors', as relatively serious. Therefore, education for local managers on conflict risks needs to be presented.

Development of sewer condition assessment and rehabilitation decision-making program(SCARD) (하수관거 평가 및 정비 우선순위 의사결정도구 개발)

  • Han, Sangjong;Hwang, Hwankook
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.29 no.1
    • /
    • pp.123-131
    • /
    • 2015
  • A CCTV inspection method has been widely used to assess sewer condition and performance, but Korea lacks a proper decision support system for prioritizing sewer repair and rehabilitation (R&R). The objective of this paper is to introduce the results that we have developed in the Sewer Condition Assessment and Rehabilitation Decision-making (SCARD) Program using MS-EXCEL. The SCARD-Program is based on a standardized defect score for sewer structural and hydraulic assessment. Priorities are ranked based on risk scores, which are calculated by multiplying the sewer severity scores by the environmental impacts. This program is composed of three parts, which are decision-making for sewer condition and performance assessment, decision-making for sewer R&R priority assessment, and decision-making for optimal budget allocation. The SCARD-Program is useful for decision-makers, as it enables them to assess the sewer condition and to prioritize sewer R&R within the limited annual budget. In the future, this program logic will applied to the GIS-based sewer asset management system in local governments.

Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process (계층 분석 방법을 이용한 원자로 격납 건물 시공의 리스크 요인 분석)

  • Shin, Dae-Woong;Shin, Yoonseok;Kim, Gwang-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.4
    • /
    • pp.425-431
    • /
    • 2015
  • Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.

Identification on Risk Factors of Outsourcing for Calculating Costs in Defense Industry Using AHP Technique (AHP 기법을 활용한 방위사업 원가산정 아웃소싱 수행간 리스크요인 식별)

  • Kim, Ki-taek;Shim, Sang-Ryul
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.20 no.4
    • /
    • pp.857-865
    • /
    • 2016
  • It has been four years after outsouring to private outsourced institute about calculating the costs on defense industry was commenced. Although the objectivity and reliablity has been improved somewhat, there were also a negative view of spending more time and money such as a costing official re-calculates the costs on the results by out-sourced institute. Therefore I want to study on countermeasure about the risks according to the importance by analysing a priority with deriving susceptible risk factors from the outsourced institute's conduct of calculating the costs in defense industry through this study. The purpose of this study contributes to the reduction of defense budget, a guarantee of the reasonable profit for defense suppliers and the improvement the effective strength of an army with a smooth supply procurement by managing the risks in advance about the conduct regarding to the outsourcing for calculating costs on defense materials in the future.

Quantification of Schedule Delay Risk of Rain via Text Mining of a Construction Log (공사일지의 텍스트 마이닝을 통한 우천 공기지연 리스크 정량화)

  • Park, Jongho;Cho, Mingeon;Eom, Sae Ho;Park, Sun-Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.1
    • /
    • pp.109-117
    • /
    • 2023
  • Schedule delays present a major risk factor, as they can adversely affect construction projects, such as through increasing construction costs, claims from a client, and/or a decrease in construction quality due to trims to stages to catch up on lost time. Risk management has been conducted according to the importance and priority of schedule delay risk, but quantification of risk on the depth of schedule delay tends to be inadequate due to limitations in data collection. Therefore, this research used the BERT (Bidirectional Encoder Representations from Transformers) language model to convert the contents of aconstruction log, which comprised unstructured data, into WBS (Work Breakdown Structure)-based structured data, and to form a model of classification and quantification of risk. A process was applied to eight highway construction sites, and 75 cases of rain schedule delay risk were obtained from 8 out of 39 detailed work kinds. Through a K-S test, a significant probability distribution was derived for fourkinds of work, and the risk impact was compared. The process presented in this study can be used to derive various schedule delay risks in construction projects and to quantify their depth.

A Study on the Sensitivity Analysis of the Financial Analysis Item in Apartment Project (공동주택 사업의 수지분석 항목에 대한 민감도 분석에 관한 연구)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.100-109
    • /
    • 2006
  • Feasibility analysis is a crucial key to success or failure of housing project. Existing feasibility analysis in construction company is based on intuitive approach rather than systematic approach. Usually feasibility analysis in a narrow sense is a financial analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. So, the purpose of this study is to analyze the sensitivity of financial analysis item about profit rate by means of monte carlo simulation and this will improve accuracy of feasibility analysis and decision making.

A Study on Priority of Patient's Medicine Task for the Emergency Department in IoT Environment (사물인터넷(IoT) 환경의 응급실에 있어서 진료테스크 선정 지원 알고리즘 개발)

  • Kim, Daebeom
    • Journal of the Korea Society for Simulation
    • /
    • v.25 no.2
    • /
    • pp.51-61
    • /
    • 2016
  • With high interest in the patient satisfaction of emergency medical services, there is a lot of effort into improving the process of Emergency Department(ED) utilizing the technology of Internet of Things(IoT). In this study, the core technologies of smart ED are examined and a decision support algorithm for medicine tasks is proposed. The proposed algorithm minimizes the decision risks such as task selection accountability, patient complaints, care delays and longer stay time. It can reduce the nurses burnout and improve the patient care with kindness and consideration. Ultimately, patient satisfaction, job satisfaction and professional identity of nurses can be increased. The comparative study was carried out by simulation in terms of the average length of patient stay in a simplified hypothetical ED system. In all the cases, the proposed algorithm was shown to perform substantially better than the other rule.

Developing Competency Model and Analyzing Competency Needs for Construction Manager in D Co., Ltd. (건설사업관리자 역량 모형 개발 및 역량 요구 분석: D사(社) 사례를 중심으로)

  • Kim, Dae-Young
    • Journal of vocational education research
    • /
    • v.33 no.3
    • /
    • pp.37-56
    • /
    • 2014
  • The purpose of this study was to develop a competency model and analyze the competency needs for construction manager in D Co., Ltd.. The delphi method of 25 excellent construction managers working in D Co., Ltd. was used to develop a competency model. The results showed that there would be a construction manager competency model which consisted of 3 competency clusters, 11 competencies, and 60 key actions. Then the survey of 114 construction managers working in D Co., Ltd. was conducted to examine concurrent construct validity of the competency model for construction manager and to analyze construction managers' competency needs by using the Borich's formula and the Locus for Focus Model(LfFM). The results showed that construction managers perceived 'communication', 'risk management', 'goal orientation', 'customer orientation', and 'project management' as top five priorities of competencies for construction managers. Based upon the above results, some implications were suggested for developing construction managers' competencies and improving their performance.