Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process  

Shin, Dae-Woong (Department of Architectural Engineering, Kyonggi University)
Shin, Yoonseok (Department of Plant Architectural Engineering, Kyonggi University)
Kim, Gwang-Hee (Department of Plant Architectural Engineering, Kyonggi University)
Publication Information
Journal of the Korea Institute of Building Construction / v.15, no.4, 2015 , pp. 425-431 More about this Journal
Abstract
Since the construction of Kori 1 was completed in 1978, the construction projects for nuclear power plant are increasingly expanded into domestic and foreign sites. However, some of construction sites of nuclear power plant have the problems of process delay and cost loss due to lack of ability of risk management. The construction of reactor containment building in nuclear power plant is especially dotted with many risk factors because it needs professional skills and large-scale resources due to long duration compared with different construction phase. Therefore, it needs the study that analyzes risk factors expected in construction of reactor containment building and suggests way of stable performance of projects. So, this study assesses risk factors of construction of reactor containment building. For the objectives, this study uses survey for group of minority specialists of 36 experts. The risks of 24 factors is classified by criterions of process, cost, safety, and quality and the results of assessment is analyzed by analytic hierarchy process. As the results, the importance and priority of risk factors classified by each criterion were calculated and the applicability of analytic hierarchy process was identified to analyze risk factors of nuclear power plant construction. These will be baseline data for risk management in construction phase of reactor containment building.
Keywords
analytic hierarchy process; reactor containment building; risk analysis;
Citations & Related Records
Times Cited By KSCI : 8  (Citation Analysis)
연도 인용수 순위
1 Lee JK. A study on the risk level of work types in nuclear power plant construction [mater's thesis]. [Busan (Korea)]: Pukyong National University; 2013. 73 p.
2 Kim KI. A study on purchasing factors of nuclear power plants industry - with emphasis on case of korea electric power corporation - [mater's thesis]. [Seoul (Korea)]: Kyunghee University; 2012. 44 p.
3 Huh YK, Lim JH, Kim KU, Ahn YC, Oh JH. Reinforced-concrete works productivity and influence factor analysis on nuclear-power-plant project. Journal of the Korea Institute of Building Construction. 2014 Aug;14(4):314-21.   DOI   ScienceOn
4 Jang RW, Yoo BG, Lee YS, Kim JJ. A study on the analyzing risk factors in chinese construction projects using AHP - focus on korean cm company -. Journal of the Architectural Institute of Korea. 2009 Jul;25(7):287-94.
5 Lee DU, Kim YS. A study on the cost risk analysis for construction projects using fuzzy-AHP method. Journal of the Architectural Institute of Korea. 2003 Apr;19(4):169-76.
6 Kim WJ. Effectiveness of linear scheduling methods in nuclear power plant construction [master's thesis]. [Yongin (Korea)]: Myongji University; 2012. 48 p.
7 Kim CH. A study on the prototype system of risk management for site personnel in overseas plant procurement [master's thesis]. [Yongin (Korea)]: Kyunghee University; 2009. 59 p.
8 Cho IR, Park CS. FREES : fuzzy risk evaluation expert system. Korean Journal of Construction Engineering and Management. 2000 Mar;1(1):53-62.
9 Cho HM, Song YW, Ahn JB, Choi YK. The priority analysis of the risk and countermeasures for quality control in the steel structure. Korean Journal of Construction Engineering and Management. 2007 Jun;8(3):87-96.
10 Choi SL, Kim JH, Jang SJ, Paek JH. A study on the risk factors to strengthen the competitiveness in the overseas development projects - focused on new town development of developing country -. Journal of the Korea Institute of Building Construction. 2008 Aug;8(3):59-67.   DOI
11 Debasish M, Joy D, Animesh B. Risk analysis in construction sites using fuzzy reasoning and fuzzy analytic hierarchy process. Procedia Technology. 2013 Dec;10(2013):604-14.   DOI   ScienceOn
12 He Z. Risk management for overseas construction projects. International Journal of Project Management. 1995 Aug;13(4):231-7.   DOI   ScienceOn
13 Mulholland B, Christian J. Risk assessment in construction schedules. Journal of Construction Engineering and Management. 2014 Apr;17(2014):105-16.
14 Kang HW, Won YM, Kang MK, Kim YS. An analysis on the probability costs variation ranges of the cost items from the risk factor model for construction phase of overseas gas plant projects. Journal of the Architectural Institute of Korea. 2012 Jan;28(1):191-8.
15 Taylan O, Bafail AO, Abdulaal RMS, Kabli MR. Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Applied Soft Computing. 1999 Jan;125(1):8-15.
16 HYUNDAI E&C, SANGSUNG C&T. Brakah nuclear power work plan procedure. Seoul(Korea): HYUNDAI E&C(Korea), SANGSUNG C&T(Korea); 2014 Feb. 48 p. Report No.: 9-070-D-430-001-A.
17 Jang JW. A study on the calculation of construction period for the reinforced concrete wall type apartments [master's thesis]. [Seoul (Korea)]: Hanyang University; 2004. 67 p.
18 Yi HB, Lee JK, Kang TI. A seismic stability design by the KEPIC code of main pipe in reactor containment building of a nuclear power plant. Journal of the Korean Society for Precision Engineering. 2011 Feb;28(2):233-8.
19 Lhee SC, Choi YJ, Choi Y. Determining the priority of factors for reducing energy at deteriorated school buildings using AHP method. Journal of the Korea Institute of Ecological Architecture and Environment. 2011 Dec;11(6):127-32.