An Analytical Study for Determining Optimum Section and Trench Range on Soft Counter Weight Fill (연약지반상 압성토의 최적단면 및 측구위치 결정을 위한 해석적 연구)

  • Park, Jongcheol;Chang, Yongchai;Baek, Incheol;Jung, Donghwan
    • Journal of the Korean Geosynthetics Society
    • /
    • v.14 no.1
    • /
    • pp.51-58
    • /
    • 2015
  • The counter weight filling is a technology to accumulate soils on the side of berm with a proper width and height for improving the stability of the embankment. This study aims to assess a feasibility of the counter weight filling in the construction of pavement roads for recovery of shear failure during the construction. An effective counter weight filling section was suggested using the numerical analysis. The results showed that the effective counter weight filling section is two-fold (x2) higher than the ratio of width in counter weight filling : embankment height and one third (1/3) to the ratio of height in counter weight filling : embankment height. Also a range of effective trench crossing the counter weight filling required when a trench crossing counter weight filling is installed was suggested by supplying a proper distance between the counter weight filling section and cross-sectional trench.

A Case Study of Tunnel Stability due to the Shallow Shaft and Change Penetrating Location (터널 갱구부 저토피 및 관통부 변경에 따른 안정성 검토 사례 연구)

  • Lee, Saik;Choi, Youngchul;Jung, Wooyong;Kim, Kookhan;Kim, Dongin
    • Tunnel and Underground Space
    • /
    • v.23 no.2
    • /
    • pp.87-98
    • /
    • 2013
  • Around 70% of Korea is mountainous, an increase in tunnel construction. It's due to the growing interest of the public for the environment and land required for the road construction is very scarce. During construction of 'Daedong 1 tunnel' in the expressway expansion project between Naengjeong and Busan, there are shallow shaft due to this tunnel located in the valley and the shafts are separated, and penetrating location change was inevitable for construction was delayed because of complaint. So, we change the position of the penetrating by applying multi-channel TSP, and conducted a stability analysis. The analysis results showed that there is no problem on the stability of the tunnel. To secure the construction of additional stability, We installed instrument, performed mechanical excavation, added reinforcement at shallow shaft and conducted bench cut.

The Protection methods of Telecommunication Network from Electrical Transient Phenomena (전기적 과도현상으로부터 통신망의 보호대책)

  • Choi, Man-Ho;Kim, Hyun-Duk;Kim, Byung-Cheul
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • v.9 no.2
    • /
    • pp.693-696
    • /
    • 2005
  • Parallel and cross of the electrical power and telecommunication network is become accelerated, because telecommunication equipments are constructed according to road for efficient maintenance of domestic telecommunication network. The electrical power network can generate an electrostatic induction, and is itself transmission medium from electrical transient phenomenon such as lighting. So, transient phenomenon of lightning surge is induced to telecommunication network, and then it is damaged by connecting between electrical ground of electrical power network and telecommunication network. In this study, we found that cut-off of return path current by separate distance between electrical ground of electrical power network and telecommunication network, and cut-off of electrostatic induction voltage by grounding unused leads of both terminals of the electrical and telecommunication network have good effect as the protection methods of telecommunications network from electrical transient phenomena.

  • PDF

Numerical Analysis for Optimal Reinforcement Length Ratio According to Width-to-Height Ratio of Back-to-Back MSE (Back-to-Back 보강토옹벽의 옹벽폭비에 따른 최적 보강길이비 산정을 위한 수치해석적 연구)

  • Park, Choon-Sik;Kim, Dong-Kwang
    • Journal of the Korean Geotechnical Society
    • /
    • v.36 no.12
    • /
    • pp.69-76
    • /
    • 2020
  • Since the mechanically stabilized earth walls have a form of retaining wall compatible with a narrow section, the geogrid overlaps according to the separation distance between the walls. There is a problem that the overall behavior may occur in the state of being integrated with the stress change due to the interaction of the geogrid. Therefore, a careful approach is required at the design stage, but there are currently no design criteria or guidelines in Korea. This study investigated the optimal reinforcement length ratio according to the retaining wall width to height ratio (width to height ratio, Wb/H) for these back-to-back mechanically stabilized earth walls. Retaining wall width ratio is 1.1H, 1.4H, 1.7H, 2.0H for Case II of the FHWA design standard, and the height is 3.0 m, 5.0 m, 7.0 m, and 10.0 m, which are most commonly applied. Through numerical analysis, the appropriateness of the FHWA design standard and the optimal reinforcement length ratio according to the height of the retaining wall and the width of the retaining wall were proposed.

A Study on the Effect of the Changes of Play Facilities on Rules Changes - Focusing on the City of Seoul - (관련법규 변천이 아파트단지 내 어린이놀이터 변화에 미치는 영향 연구 - 서울시 소재 현장을 중심으로 -)

  • Kim, Dong-Chan;Suh, Joo-Hwan;Park, You-Jeong
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.37 no.2
    • /
    • pp.26-35
    • /
    • 2009
  • This study is an analysis of the design changes of children's play facilities and the related rules and regulations which causes these changes. Accordingly, it is noticed that a site's change of design by legislation and by yearly alternation influences playground design. First, after revising the provisions for the distance from roads and parking lots, the constructing of safety fences between play facilities and the using of durable materials, alterations of the designs have been made a reality. Second, the design changes after the period of regulation transitions were caused by provisions related to the shelter of evergreens and conditions of the sun. Third, the changes of the playgrounds were related to the substitution of exercise facilities for the local residents and in carrying out a hygiene exam more than twice a year. Because a lack of regulatory standards for the design of playgrounds resulted in compliance based on individual interpretation and because a substitution of exercise facilities is part of the way to alleviate these regulations, the conditions of the site under investigation could be projeced. By such changes of regulations and analysis of alterations of playground design, programs for improvement were suggested. It turned out that the composition of the concrete standard in conformity with regulations required closer observance. Moreover, design standards for children's playgrounds are needed, such as the provision of variation in external appearance, the creation of more flexible layouts and the outlining of spaces by themes.

Evaluation of Privately Owned Public Spaces within Detached Housing Areas in Pangyo City - Focusing on the Mixed use Housing Areas (가구내부 공유외부공지의 조성실태에 관한 연구 - 서판교 점포주택지를 중심으로)

  • Park, Kyung Seo;Kang, Jun Mo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.1
    • /
    • pp.157-167
    • /
    • 2016
  • Detached residential housing areas are located in the west part of Pangyo City. Seven areas of them are designated for the displaced residents from their original homes by the city development, in which commercial use on the first floor is permitted. The District Plan for the areas were establishes, and one of its main goals is to secure privately owned public spaces (POPS). This research conducted a post enumeration survey on the POPS on the blocks in the seven areas, which blocks contain inner corridors between two rows of housing units. Analytical review of the survey result reveals that (1) POPS facing roads are mainly being used as parking lots or expansion-spaces for the commercial use on the first floor, (2) inner POPS forming corridors are being neglected and otherwise being used as storage areas or outdoor sub-kitchen spaces, and (3) no consideration has been taken for the continuity of the sloped corridors. Regardless of a few good practices in terms of air circulation and lighting, the POPS in the blocks prove to be limited in following the plan's original design intentions and principles.

Effect of Compaction Method on Induced Earth Pressure Using Dynamic Compaction Roller (진동롤러에 의한 다짐방법이 인접구조물의 다짐토압에 미치는 영향)

  • Roh, Han-Sung
    • International Journal of Highway Engineering
    • /
    • v.3 no.4 s.10
    • /
    • pp.127-136
    • /
    • 2001
  • To increase the structural integrity of concrete box culvert good compaction by the dynamic compaction roller with bi9 capacity is as effective as good backfill materials. It is needed for effective compaction that a compaction roller closes to concrete structure with high frequency. However structural distress of the culvert could be occur due to the excessive earth pressure by great dynamic compaction load. To investigate the characteristics of Induced stress by compaction, a box culvert was constructed with changing cushion materials and compaction methods. Two types of cushion material such as tire rubber chip and EPS(Expanded Polystyrene) were used as cushion panels and they are set on the culverts before backfill construction. Laboratory test result of cushion material says that the value of dynamic elastic modulus of rubber is lesser than that of EPS. On the other hand, material damping of rubber material is greater than that of EPS. In most case, dynamic compaction rollers with 10.5 ton weights were used and vibration frequency was applied 30Hz for the great compaction energy. This paper presents the main results on the characteristics of dynamic earth pressures during compaction. The amounts of induced dynamic pressures$(\Delta\sigma\;h)$ by compaction are affected with construction condition such as compaction frequency, depth of pressure cell, distance between roller and the wall of culvert and roller direction. Based on the measured values dynamic lateral pressure on the culverts, it could be said that orthogonal direction of roller to the length of culvert is more effective to compaction efficiency than parallel direction.

  • PDF

Analysis of Bus Accidents Influential Factors on Bus Exclusive Lane in Seoul (Bus Median Lane and Bus Curb Lane Defined) (서울시 버스전용차로구간의 버스사고 영향요인 분석 연구 (중앙전용차로 및 가로변전용차로 구분))

  • Lim, Jun-Beom;Hong, Ji-Yeon;Chang, Il-Jun;Park, Jun-Tae
    • International Journal of Highway Engineering
    • /
    • v.14 no.2
    • /
    • pp.145-155
    • /
    • 2012
  • At present, Seoul City is putting the bus exclusive lane system into practice according to mass transit revitalization policy. Starting with the installation of roadside bus exclusive lane in the past, at present, even the road sections for central- lane bus exclusive lane system are on the increase. The purpose of this research is to analyze the factors giving impacts on bus accident on central bus exclusive lane and roadside bus exclusive lane. In case of the central bus exclusive lane, the 6 variables, such as the number of bus routes, number of access & entrance to central lanes patterns, whether the stop line of central lanes retreats or not, separated distance between the stop line of central lanes and crosswalks, traffic volume, and number of bus routes stopping at bus stops on reversible lanes, were found to have a significant influence on bus accidents. In case of roadside bus exclusive lane sections, the four variables such as the number of right-turn bus routes, whether to be chronic illegal parking & stopping, time for the walk signal, and forms of land use, etc. were found to have a significant influence on bus accident.

Assessment of Equivalent Heights of Soil for the Lateral Earth Pressure Against Retaining Walls Due to Design Truck Load (표준트럭하중에 의해 옹벽에 작용하는 수평토압의 등가높이 산정)

  • Kim, Duhwan;Jin, Hyunsik;Seo, Seunghwan;Park, Jaehyun;Kim, Dongwook;Chung, Moonkyung
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.4
    • /
    • pp.119-128
    • /
    • 2018
  • Limit state design has been implemented in Korea since 2015; however, there exists no specification of lateral load determination on retaining wall due to the Korean standard traffic load on retaining wall's backfill surface. The lateral load from traffic depends on lane number, standard truck's axle loads and locations, loading distance from the inner wall. The concept of equivalent height of soil accounting for traffic loadings is typically used for design of retaining walls to quantify the traffic loads transmitted to the inner wall faces. Due to the different characteristics of the standard design trucks between Korea and US (AASHTO), the direct use of the guidelines from AASHTO LRFD leads to incorrect estimation of traffic load effects on retaining walls. This paper presents the results of evaluation of equivalent height of soil to reflect the Korean standard truck, based on the findings from analytical solutions using Bounessq's theory and numerical assessment using 2D finite element method. Consequently, it was found that the equivalent heights of soil from the Korean standard truck load were lower for lower retaining wall height.

Determination of Not-Permitted Entrance/Exit Section at Curb Areas (단지 내 진출입 불허구간의 적정길이 산정에 관한 연구)

  • Kwon, Sung-Dae;Park, Je-Jin;Ha, Tae-Jun;Ha, Dong-Ik
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.369-376
    • /
    • 2010
  • At present, many problems in traffic operation and safety occurs since there is no clear design criteria on designating the not-permitted entrance/exit section at curb areas within complex areas. Even, there is no specific and detailed researches on the not-permitted entrance/exit section by now. This research calculated the proper length of the entrance/exit section at curb areas by dividing the access not-permitted section into the two sections. First, the calculation of the entrance section was done by considering the location of crosswalks, stop line clearance, the queue length of vehicles approaching to second lanes, and marginal distance for safety have been considered. Second, the calculation of the exit section was done by comparing and analyzing the distance between cars of the entrance section according to the investigation point and the distance considering the location of crosswalks, the behavior of exit vehicles and the length of vehicles. In conclusion, by presenting the proper length in consideration of the traffic operation and safety on the access not-permitted section within complex areas, it can be used as a traffic safety improvement alternative and will be contributed in establishing and operating the proper installation criteria for the access not-permitted section within complex areas.