KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.419-425
/
2017
Managing mega construction project is a very challenging task due to its large scale and complexity. To deal with the challenge, progress measurement must be estimated reliably and effectively. Many researchers have presented progress measurement methods, but previous studies are limited to single or several types of facilities. Thus, they have difficulties to being applied to mega construction projects that covers multiple facilities. To overcome the limitations, this paper proposes a progress measurement framework considering characteristics of mega construction projects. The framework consists of four phases : development of Work Breakdown Structure, determination of weights of main facilities and sub facilities, and calculation of the integrated progress rate. To validate the proposed approach, a case study of Sejong city in Korea was performed. The results of the case study showed the applicability of the proposed framework and confirmed that it enables to reliably measure progress rate of mega construction projects.
도로건설프로젝트에서의 VE는 도로시설물의 기능을 향상시키고 비용을 절감하기 위한 방법으로 지금까지 널리 활용되고 있다. 그러나, 실제 건설VE 실무에서는 VE Job Plan 중 일부 단계가 생략되거나 형식적으로 수행되는 문제점이 발생되어 VE 수행결과에 대한 신뢰성에 의문이 제기되고 있다. 이는 제조업과 달리 대규모이며 복합공종을 갖는 건설프로젝트의 특성을 반영하지 못하고 있기 때문이다. 건설프로젝트는 대규모 복합공종으로 구성되어 복잡하고 다양한 기능 및 요구성능이 있으며, 시설물이 갖는 기능(Function)과 요구성능(Required Performance)의 일부는 반복적으로 발생하는 특징을 가지고 있다. 이에 본 연구에서는 VE Process의 실효성을 높이기 위하여 품질모델(Quality Model)과 기능분석(Function Analysis)단계에서 이러한 특징을 반영한 개선방향을 제시하고, 수차례 실무 검증을 통하여 적용성 및 효율성을 확인하였다. 이와 더불어 고속도로 VE Job Plan은 고속도로 설계 업무절차에 부합하도록 개선하여 VE 수행효과가 극대화 되도록 제안하였으며, 또한 한국도로공사에서 시행하는 고속도로 대한 VE절차를 "Hi-Value"라 명명하고 실무활용성, 효율성을 확대하고 지속적으로 발전시켜 나아갈 계획이다.
Korean Journal of Construction Engineering and Management
/
v.19
no.1
/
pp.43-53
/
2018
Modular construction can improve construction quality and accuracy through manufacturing process, and it allow massive production and cost savings by repeatedly producing the same unit. In particular, it is possible to reduce the time because the on-site work and the manufacturing process can be carried out at simultaneously. However, according to the modular construction project survey report, there is no significant difference regarding the average construction period between modular construction and conventional construction. This is due to schedule delay problems that occur during construction phase. Therefore, it is necessary to select alternatives to prevent schedule delay during on-site construction progressing. Especially, in case of large-scale modular construction project, on-site module assembly and manufacturing process are performed concurrently. Hence, identification of alternatives should be done at the co-occurrence by taking both manufacturing and on-site work process in to account. In this research, the management factors of large-scale modular construction project were identified through the IDEF0 modeling, and the quantity management model for manufacturing and assembly is developed. This will reduce the schedule delay problem that occurs in the progression on-site work of a large scale modular construction.
Korea Mechanical Construction Contractors Association
월간 기계설비
/
no.4
s.213
/
pp.69-73
/
2008
한일건설(주)은 1978년 설립 이래 건축, 플랜트, SOC사업, 주택사업 등 다양한 분야에서 입지를 다져왔으며 특히 건축분야에서 서울시립미술관 등 공간의 효율성을 높이고 예술적 가치를 더하는 건물을 선보이고 있다. 또한 방글라데시, 베트남 등 해외플랜트 건설에서 시공능력을 인정받아 캄보디아 사상최대 주거단지인 캠코시티 프로젝트와 괌 타무닝에 대규모 아파트 건설공사 수주 등 해외건설에서도 두각을 나타내고 있다. 한일건설(주)은 고품격아파트“베라체”런칭을 통해 자연과 인간, 문화가 어우러진 풍요로운 생활문화 공간 추구 등 타 건설사와 차별화된 설계와 시공으로 21세기 건설산업을 선도코자 오늘도 정진하고 있다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.26-30
/
2004
중국심천 삼성코닝 프로젝트 (SSG Expansion Project)는 전문적인 건설인력이 없는 발주처를 대신하여 설계단계에서 최종 턴 오버(turn over)까지 건설 전 과정에 대하여 CM을 수행한 사례로서 한국기업이 중국에서의 CM 업무를 성공적으로 수행한 대표적인 사례이며, 대규모 공장건설에 있어 건설과 생산설비의 설치에 대한 종합적인 공정관리와 설계, 시공을 동시에 수행하는 Fast Track 방식에서 범할 수 있는 설계오류 및 풀질저하에 대한 사전 예측관리, 현지의 건설특성에 적합한 각종 공법 및 요소기술의 제시를 통한 시공성 향상, 원가절감, 공기단축에 기여로 유사 프로젝트 대비 4개월 이상 단축하여 성공적으로 제품을 생산하는 성과를 달성한 사례이다. 이에 본 연구에서는 프로젝트의 각 단계별 주요 CM업무 수행현황 및 중국건설의 특징을 고찰하고, 한국기업의 중국 CM시장 진출 가능성과 진출을 위한 사전준비에 필요한 사업 단계별 유의사항에 대한 검토를 목적으로 한다. 국내 건설경기가 침체되어 있는 현재 본 연구를 통하여 중국 건설현황에 대한 올바른 이해와 중국 CM시장의 진출 및 성공에 밑거름이 될 수 있기를 기대한다.
Journal of the Korea Institute of Building Construction
/
v.21
no.4
/
pp.347-359
/
2021
Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.
Korean Journal of Construction Engineering and Management
/
v.3
no.3
s.11
/
pp.103-111
/
2002
A joint venture approach to the marketing, organization, and execution of a project should be considered when the combined strengths of two or more entities result in a joint organization with unique credentials in a targeted business area. A joint venture is based on a complementary relationship: one party may lack one or more major elements needed for market penetration, such as technology, design-construct capabilities, geographic location, or financial strength; the other party should be able to compensate for these areas of weakness. The purpose of this study is that suggests the development direction of a joint venture, the proper organizational approach
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.379-384
/
2002
A road construction project needs a large scale of investment and tine. In this study, we will review some elements of feasibility analysis and derive points of the existing analyses. And we make some suggestions to improve the existing methods. We propose a 'A Feasibility Information System' for road construction projects. The system will be useful to make a feasibility study for road construction project and help us to predict risks in process of the projects.
4대강 살리기사업은 역대 정부가 추진하는 단일명칭의 사업 중에서 가장 규모가 큰 사업이다. 전국 토의 75%에 해당되는 4대강 유역 전반에 걸쳐 추진하는 사업인 만큼 전국 단위에서 추진하는 사업으로 볼 수 있다. 동시에 22.2조원에 달하는 사업비를 투입하여 3년내에 완료해야 하는 사상 초유의 대규모 프로젝트이기도하다. 단기간내에 대규모로 추진하는 사업인 만큼 사회적 논쟁과 갈등이 심한 것도 사실이나 마침내 정부는 지난 6월 마스터플랜을 발표하였다. 앞으로 $2010{\sim}2012$년의 3년 기간 동안 엄청난 물량의 대규모 사업이 본격 추진될 전망이다. 이 글은 다음 두가지 측면에서 4대강 살리기사업의 특징 및 파급효과를 살펴보고자 한다. 첫째, 4대강 살리기사업의 내용 및 규모 등 주요 특징을 간략히 살펴보고자 한다. 둘째, 4대강 살리기사업의 국민경제 전체 및 건설산업과 시멘트산업 등에 미치는 경제적 파급효과를 살펴보고자 한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.