• 제목/요약/키워드: 대규모 개발사업

Search Result 361, Processing Time 0.031 seconds

Factors of Large-scale Tourism Development Projects Process Delay (대규모 관광개발사업의 사업지연 요인)

  • Lee, Hye-Ju;Kim, Hye-Ran;Lee, Myeong-Hun
    • The Journal of the Korea Contents Association
    • /
    • v.13 no.10
    • /
    • pp.565-573
    • /
    • 2013
  • Uncertainty in large-scale tourism development is the main reason of the delay on the project. The purpose of this study is to identify the status and effect of this large-scale tourism development project. Huge amount of funds has to be invested prior to the development of this project and with high uncertainty of successful development, the procedure is the most important factor of this project. Therefore, under the basis of these assumptions, we operated a PLS regression analysis to see any factors that has influence during the procedure of the project. The result of the PLS regression analysis resulted that among all of the factors, the participation and role of regional community is the highest priority. In order to lead large-scale tourism development to success is to listen to the ideas of various project-related personnels and form a public - private partnership for evaluation of the project.

Review of CO2 Storage Projects and Driving Strategy of CO2 Storage Program in Korea (이산화탄소 지중저장 사업의 추진현황 검토 및 한국의 추진방향 제안)

  • Gwon, Lee-Gyun
    • KEPCO Journal on Electric Power and Energy
    • /
    • v.2 no.2
    • /
    • pp.167-185
    • /
    • 2016
  • $CO_2$ 지중저장 기술은 가장 유력한 대용량 온실가스 감축기술의 하나이다. 이 기술을 적용하여 국제적으로 노르웨이, 알제리, 캐나다, 미국 등에서 이미 대규모 실증 및 상용화 사업이 수행되고 있으며, 호주, 일본, 네덜란드, 독일 등 그 밖의 여러 나라에서 다양한 내용과 규모를 갖는 중소규모 실증사업이 진행되고 있다. 한국도 소규모 육상 파일럿 저장 프로젝트와 중규모 해상 저장실증 프로젝트가 추진되어 착실하게 기술개발과 경험확보를 위해 노력하고 있다. $CO_2$ 지중저장 사업은 화석연료의 사용이 다른 에너지원으로 대체되기 전까지 지속적으로 확장될 것으로 예측되고 있으나, 온실가스 감축시장의 불안전성, 사업의 수익구조와 관련된 경제성, 누출에 대한 안전성 등의 위협요소를 갖고 있다. 따라서 이러한 위협을 극복하기 위해 많은 국가와 기업들이 저비용-고효율 지중저장 기술과 안전한 지중저장 기술의 확보를 목표로 연구개발 및 실증사업을 추진하고 있다. 한국의 경우에 저장소가 주요 포집원으로부터 상당한 거리를 갖고 있는 해저에 발달하고 있기 때문에 지중저장 사업의 경제성 확보가 매우 불리한 조건이다. 따라서 정부나 기업이 CCS 기술을 주요 온실가스 감축수단으로 채택하여 대규모 지중저장 사업을 본격적으로 착수하는 것을 주저하고 있다. 한국과 같은 불리한 조건을 갖는 국가의 경우에 특히 대규모 저장소의 확보를 포함한 저비용-고효율 지중저장 기술의 실용화가 절실하게 필요하다. 결론적으로 한국의 $CO_2$ 지중저장 사업의 성공적인 추진을 위해서는 대규모 저장소의 확보, 저비용-고효율 지중저장 기술의 개발과 실증을 통한 실용화, 중소규모 지중저장 실증사업으로 축적한 기술과 경험으로 대규모 지중저장 사업의 효율화 달성이 요구된다. 이를 위한 실천적인 로드맵과 프로그램의 작성과 착실한 이행 역시 중요하다. 이러한 기반이 착실하게 다져질 경우에 한국에서 대규모 CCS 통합실증과 $CO_2$ 지중저장 사업이 본격적으로 개시될 수 있을 것이다.

정부출연연구기관 주요사업 연구기획 강화를 위한 예비타당성조사 사업 메타분석연구

  • Lee, Jong-Won
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.05a
    • /
    • pp.393-407
    • /
    • 2017
  • 최근 정부 R&D 방향을 보면 정부출연연의 역할은 중장기, 대규모 신규사업발굴에 초점을 두고 있으며 출연연 자체적으로 연구기획에 많은 투자와 노력을 하고 있다. 하지만, 출연연 주요사업 연구개발계획서에 철저한 준비가 되어야 함에도 기획 전문지식이 체계적으로 축적되지 않았으며 연구기획에 대한 좋은 본보기를 요구하는 연구자들이 지속적으로 이어져왔다. 이에 본 연구에서는 논리적이고 심도있는 검토를 거치는 사전평가 과정인 국가연구개발 예비타당성조사 사업을 본보기로 제안하며 주요사업 기획에 도움이 되는 평가항목들과 내용을 메타분석하고자 한다. 이를 위해 KISTEP에서 공개한 예비타당성조사 보고서의 평가항목들 중에서 출연연 주요사업에 적용될 수 있는 기술적 타당성 평가항목들을 선별한다. 그리고, 선별된 평가항목들끼리의 내용분석을 통해 사업 타당성에 대한 지적사항을 항목별로 정리하여 시사점을 찾아내고자 한다. 본 연구를 통해 주요사업 대규모, 중장기 연구기획 시 실무적으로 도움이 될것으로 기대한다.

  • PDF

A Study on Structural Characteristics of US Urban Development Project and Flexibility of Crisis Response -Focusing on A Comparative Analysis of Hudson Yard and Yongsan International Business District Development- (미국 도시개발사업의 구조적 특징과 위기대응의 유연성 연구 -허드슨 야드 개발의 위기극복 과정을 중심으로-)

  • Lee, Woo-Hyoung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.12
    • /
    • pp.80-87
    • /
    • 2017
  • In the past, the United States has been engaged in large-scale urban development projects as a tool for urban regeneration to revitalize distressed urban areas. On the other hand, large-scale urban development projects have been stalled or discontinued globally since the 2008 economic crisis. Despite this, the Hudson Yard development, which is the subject of this study, has resumed smoothly due to the characteristics of its development structure and rational negotiation process. Most domestic developments depend on the economic circumstances, and the problems that are exposed in a privately led development are repeated; the Yongsan International Business District Development is a representative failure case. This study examined the characteristics of the business structure and the nature of the negotiation process in the Hudson Yard development project in New York City.

A Case Study on the Prevention of Construction Delays Using the Delay Management Index in Program Level Construction Projects (프로그램 수준 건설사업에서 지연관리지수(Delay Management Index)를 활용한 공사지연 예방 사례연구)

  • Yu, Jun-Hyeok;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.4
    • /
    • pp.347-359
    • /
    • 2021
  • Recently, construction projects have emerged in the form of program management, which is complicated by the large-scale of construction, and requires astronomical construction costs. In particular, projects that absolutely require management at the program level, such as large-scale construction projects, require overall control of the planned schedule and cost as a set of various projects, including infrastructure. But in Korea, there is no specific management standard for delays in construction. In order to avoid the risk of cost increase and project delay in the program-level construction project, it is necessary to apply more systematic management standards to prevent delay and to take a more preemptive response in the construction process. Therefore, in this study, a delay management index (DMI) was developed to successfully carry out large-scale construction projects at the program level and prevent delays in advance. In addition, case studies were conducted for large-scale construction projects, and a delay prevention system was established for program-level construction projects.

장보고 시설사업에서의 실시간 파고예측시스템 개발 및 적용

  • Heo, Jin-Uk;Choe, Han-Rim;Park, Seung-Min
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.55-56
    • /
    • 2018
  • 대규모 해군 사업인 장보고-III 시설사업의 간략한 사업개요와 공사시 또는 완공후의 원활한 시설운용을 위한 파고예측시스템을 개발 및 적용하였다. 진해만의 지리적 특성을 고려하여 풍파가 주요파라메타로 설정하였으며, 인근 기상대 바람예보 자료를 활용하여 주요지점에 대해 파고를 예측할 수 있는 시스템을 개발하였으며, 향후 공사시 활용할 수 있다. 또한, 특정사업 및 특정 지역에 대한 간략 파고예측시스템의 제작으로 시공 및 현장에 유익한 정보 전달이 가능하다.

  • PDF

Strategic Environmental Assessment and Integration of Development and Environmental Planning in Korea (전략환경평가와 개발계획 및 환경계획의 통합)

  • Lee, Jong Ho;Cho, Jae Heon
    • Journal of Environmental Impact Assessment
    • /
    • v.16 no.6
    • /
    • pp.433-446
    • /
    • 2007
  • 환경영향평가는 대규모 개발사업을 대상으로, 계획 확정후 사업 실시단계에서 개발사업 시행에 따른 환경영향 저감방안을 중점 검토하는 제도인데, 사전환경성검토는 행정계획과 환경상 민감지역의 소규모 개발사업을 대상으로, 계획 확정 이전단계에서 환경적 측면에서 입지나 개발의 적정성 타당성을 사전에 검토하는 제도이다. 사전환경성검토는 2006년 6월부터 대상 행정계획을 구체적 개발사업의 상위 행정계획으로 확대하고, 계획의 적정성, 입지의 타당성을 미리 검토할 수 있도록 하고, 검토과정에서 주민, 전문가, 시민단체 등 이해관계자의 의견수렴을 거치도록 하는 전략환경평가 체제로 개편됨으로써, 환경갈등이나 사회 경제적 문제를 예방할 수 있는 기반을 보다 강화하였다. 환경부 주관의 사전환경성검토가 전략환경평가를 강화하는 동안 건설교통부가 중장기기본계획에 대한 전략환경평가를 시행하기 시작하였다. 우리나라의 전략환경평가는 건설교통부와 환경부가 전략환경평가를 별도로 운영하는 데 따른 비효율성, 국토계획과 환경계획의 연계성 부족, 선거공약으로 제안된 대규모 개발계획 등에 대한 객관적 환경평가의 어려움 등의 문제를 가지고 있다. 따라서 본 연구는 전략환경평가제도의 정립을 위해, 환경정책패러다임의 변천, 환경영향평가와 사전환경성검토의 발전, 전략환경평가의 현황과 선거공약으로 제안된 대규모 개발계획에 대한 전략환경평가의 한계 등을 고찰한 후, 전략환경평가제도의 발전방향과 개발계획과 환경계획의 연계통합방안을 모색하고자 한다.

The Role and Directions of Korean Urban Development Cooperation: A Review of Colombian Planning Systems and Case Studies of Urban Development Projects (콜롬비아 도시계획 제도와 도시개발사업 사례 분석을 중심으로 살펴본 한국 도시개발 협력 역할과 과제)

  • Choi, Junyoung
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.15-30
    • /
    • 2021
  • Korean urban development cooperation is gradually expanding into Latin America and the Caribbean (LAC) region, but strategies to encourage domestic market players to participate are insufficient. This paper investigated the Colombian urban planning system, urban development projects, and Korean projects in Colombia, which leads to implications for international cooperation in LAC. This research, first, compares the national and regional urban planning systems of Colombian major cities, Bogotá and Medellín. Second, case studies are carried out with a land readjustment project, a Macro project for large-scale public rental housing supply, and urban development cooperation between Korea and Colombia. By doing so, the role and the directions for Korean urban development cooperation with LAC such as Colombia are discussed and proposed. The findings suggest, first, aid projects through Official Development Assistance (ODA) should establish urban networks in recipient countries. Second, it is necessary to understand the financing structure for urban development cooperation projects that are different from infrastructure projects. Third, the successful case of urban development cooperation should be demonstrated by making the development period and size optimal and manageable.

댐 건설사업 추진시 사전협의제도 운영 개선방안

  • 송영일
    • Water for future
    • /
    • v.37 no.4
    • /
    • pp.42-50
    • /
    • 2004
  • 우리나라에서는 경제성장 과정에서 개발수요를 충족시키고 경제발전을 위하여 댐 건설, 도로건설, 항만건설 등 대규모 공공건설사업이 지속적으로 수행되어 왔으며, 이러한 개발사업으로 인하여 발생하는 환경적인 영향 예측 및 훼손 저감 등을 위하여 사전협의 제도를 운영하고 있다. 사전협의제도는 환경 영향평가 제도와 사전환경성검토제도로 크게 구분된다.(중략)

  • PDF

대규모 매립 및 호안 축조를 통한 산업단지 개발사례

  • Lee, Hak-Seung;Jeong, Sun-Gyu
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 2018.11a
    • /
    • pp.46-48
    • /
    • 2018
  • 온산국가산업단지는 정부의 중화학공업 육성 정책에 따라 1974년 4월에 산업기지 개발구역으로 지정되어 조선, 화학, 정유 등 많은 기업체들이 약 26백만$m^2$ 면적에 입주하여 운영 중이나, 사업영역 및 공장시설 확장과 관련 산업 집적화에 필요한 추가 산업용지 수요가 증대되고 있는 실정이다. 이에 따라 부족한 산업시설용지를 확보하고자 울산만 외역에 대규모 매립 및 호안 축조를 통해 국가산업단지 개발을 추진하게 되었으며, 개발에 따른 계획수립과 개발사업의 개요, 추진과정에서 애로사항 및 대응방안 등 제반 공정현황을 소개하여 기타 해역에서 유사사업을 추진시 참고할 수 있도록 하였다.

  • PDF