The Press related Energy including nuclear energy has social responsibility that it should pass the scientific factors to the right. It is essential to ensure the accuracy and fairness. The general public, such as press releases and information obtained through indirect communication affects social acceptance of nuclear power, which is used to determine the direction of energy policy, the most important factor to be taken into account. Recent rapid increase coverage of NPP lose in balance of nuclear power plants. In this study the qualitative interviews were performed with the workers who stand directly in obtaining information about nuclear related organizations. By E-mail and FGI the data were collected from the workers' perception about domestic nuclear news. They perceived the NPP news that the negative aspects of nuclear power plants were too much dealt in nuclear news coverage, and risk of NPP is only exaggerated and distorted, the lack of expertise knowledge on nuclear power and recognize that the cause was a lack of understanding. 'Nuclear mah' for the event were aware that should dig more thoroughly. The Journal of Digital Policy & Management.
Journal of the Korean BIBLIA Society for library and Information Science
/
v.27
no.1
/
pp.135-155
/
2016
The study aims to discuss issues on alternative materials for the disabled. For the purpose, it analyzed related policies and legislations. As a theoretical study, it explored definitions and types of altermative materials, and discussed a history of the information access rights for the disabled. Then, the study analyzed the disabled service part of the library development master plan. Futhermore, it discussed library act, disabled welfare act, and copyright act which define the rights and responsibilities of the interested groups. Based on the analysis, the study conducted interviews with members of the interested groups to explores their acknowledge and perspective. As a result, it argued the problems related to production and service of alternative materials, and provided five enhanced strategies.
Journal of Advanced Marine Engineering and Technology
/
v.38
no.3
/
pp.325-332
/
2014
In installing ballast water treatment system, the cost of the system is high and many technical aspects are to be considered and also it takes significant time to retro-fitting on the existing ships. In addition, in the current circumstance which the Ballast Water Management Convention has not been entered into force, the 28th IMO Assembly adopted a resolution to mediate the implementation schedule of the treatment systems. In the mean time, California State and New York State have declared more stringent discharge requirements of ballast water and are planning to implement them earlier than the schedule of the Convention. In these circumstances, the implication in the difference between ballast water treatment system manufacturers and ship owners need to be considered. In this study, through the review on the considerations when installing the system onboard, stringent requirements of United States of America, and determent or mediated implementation schedules of Convention and California and New York States, the author would like to suggest the strategy of concerned parties for anticipated entrry into force of the Convention and implementation of the stringent requirements of United States of America.
Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
/
v.16
no.1
/
pp.103-110
/
1998
This study deals with the effective management system on the underground facilities by Geographic In-formation System (GIS). For this purpose,"Management System on the Water Supply Network by GIS in Kwangju" was analylized. Following results were obtained in this study. This system could be practically used for the inquiry of water supply and distribution pipes, check valves, pipe equipments and parcel identification numbers. Inquiry of addresses using the parcel identification numbers were effective for the database management system of the water supply facilities. The poits at issue for the performance of this study were the security and education of experts, the security of revenue source, the discord between GIS companies concerned. Establishments of GIS software technologies and database systems, and the settlement between GIS companies were required for the solution of these poits. Development of computer management systems on the water sup-ply network by GIS enabled the replacement of outworn pipes and the leakage inquiry techniques in pipes. in pipes.
The issues of environmental pollution and labor safety on ship recycling in the undeveloped countries such as India, Bangladesh, etc have been proclaimed. For this, IMO has been actively participated in resolving such problems since 1998 and then finally the International Convention for the Safe and Environmentally Sound Recycling of Ships is going to be adopted in this year. The convention provides the design, construction, operation and preparation of ships in order to facilitate safe and environmentally sound recycling as well as the safe and environmentally sound operation of ship recycling facilities. Therefore, the purposes of this study are to introduce the major contents of ship recycling convention and its time of entry into force and to analyse stakeholders' strategies toward it so that Korea will have a better position for the establishment of a mechanism regarding regulation stringency on environmentally sound ship recycling.
Journal of the Korean Society of Marine Environment & Safety
/
v.20
no.2
/
pp.179-185
/
2014
A use of Asbestos onboard was banned by the provisions of SOLAS since 1 January 2011. And this provision was also implemented by the Rule for Ship's Facilities in Korea. However, these provisions were only declaration and there were no detailed measures for detect, removal and confirmation. In this study, by reviewing the Ship Recycling Convention, IMO circulars and Asbestos Safe Management Act, the following strategies for each concerned parties were proposed. The administration and class society should establish the provisions for appointment of subject vessel which to be inspected for asbestos, criteria for asbestos management and appointment of handling expert. The shipbuilder and equipment manufacturer should make written confirmation that asbestos was not used in their product. And shipowner and ship manager should establish procedure for onboard control of asbestos in the ship's safe management system.
The concern and request of high-quality software has been increased according to the rapid transition of society to information-oriented era. Therefore activities of software quality management are regarded as serious as the activities of software development. Moreover, stakeholder of software may have various views of software quality. And some quality characteristics need to be managed with priorities in Software Development Life Cycle (SDLC). Hence we recognized that weights of quality characteristics might be useful to improve efficiency of quality management activities. However, this topic has not actively issued because its necessity and effectiveness has been ignored. This paper presents a technique to decide weights of software quality characteristics in SDLC. It is based on ISO/IEC 9126 which is the standard for software product quality. It is accomplished by questionnaires intended for stakeholder in software development and weight analysis through AHP (Analytic Hierarchical Process) method. Accordingly, it can select quality characteristics by weight in SDLC. And then it helps us to acquire high duality software through measuring software quality quantitatively and expecting the quality after completion of software development.
Journal of the Korea Institute of Building Construction
/
v.20
no.6
/
pp.527-535
/
2020
This study analyzed main causes of claims in EPC/Turnkey projects. For this purpose, this study referred to the FIDIC silver book, which lists the international standard contract conditions for EPC/Turnkey projects. The most frequent cause of claim was delay. A process was then proposed to determine whether the owner or contractor was the responsible party when the delay claim occurred. The proposed process was for damages for delay which is the conditions of contract for indemnities against delay claim. The process was based on conditions of the contract of two previous EPC/Turnkey projects that were constructed in 2010, the FIDIC silver book, as well as the obligations of owner and contactors. The proposed process is applicable depending on the conditions of the contract and the owner's meaning. Furthermore, by identifying the responsible party, this study will contribute in identifying the possible claim types before concluding a contract and writing the specific contract.
Journal of The Korean Association of Information Education
/
v.26
no.6
/
pp.543-552
/
2022
This study tried to analyze the social perception of news coverage on inclusive education by using big data analysis techniques. News articles were collected according to the 5-year policy period for the development of special education, and news big data was analyzed. As a result, the frequency of media reports during the five-year policy period of special education development from 1998 in the first year to 2022 in the fifth year was steadily increased. During this period, the top topic words in news coverage changed from words conceptualizing simple definitions to words expressing the active will of students with disabilities for the actual right to education. In addition, as a result of emotional analysis of the overall keywords in the inclusive education news coverage, it was found that the positive word ratio was high. Through this study, it can be seen that interest in news coverage on inclusive education is increasing quantitatively in accordance with changes in special education policies, and the demand for inclusive education is being concreted in the direction of guaranteeing the actual right to education of students with disabilities.
Journal of the Korea Society of Computer and Information
/
v.14
no.7
/
pp.133-141
/
2009
To have successful execution of a development project on large scale, it is the most important to improve communication problems between project stakeholder. In this study, we design and implement project integrated management tools that improve the problems. In order to design and implement the tools, we gathered and arranged requirements based on the ISP data from S corporation and the problems of 23 projects which was executed in recent 2 years in a communication perspective, and then we conceptually design and propose the tools. We defined major parts of the functions and the architecture related to communication among the proposed architecture model, and we proposed process and detail functions to execute major functions. This study shows the possibility through a qualitative valuation to improve validation of the architecture model and a quantitative analysis in a communication perspective.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.