• Title/Summary/Keyword: 다수 프로젝트

Search Result 170, Processing Time 0.019 seconds

A Study on the Application of Information Classification for Integration of Construction Information in Construction Phase (시공단계의 건설정보 통합을 위한 분류체계 적용에 관한 연구)

  • Kim Jin-Young;Kim Yong-Gu;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-455
    • /
    • 2002
  • Construction market situation has been changed quickly in the 21st century. One is a large variety of information, the other is the development of IT technology among the rest of the change. Accordingly, it is very important that information is managed systematically and made good use of broadly in proportion to the increase of information volume. Therefore, the purpose of this study is to propose a applicable classification system in the construction phase. First of all, the Construction Information Classification proposed by the government is studied to apply the actual work and to build a applicable construction information classification for construction project. A base of the applicable classification system is the Construction Information Classification, SMM and Materials classification(Public Procurement Service). The applicable classification system to control and manage the construction information is consist of the 4 types : Facility classification, Element classification, Work classification, Resource classification (Materials, Equipment, Labor).

  • PDF

Distributed Coordination of Project Schedule Changes by Using Software Agents (소프트웨어 에이전트를 이용한 건설공사 공정관리의 분산화)

  • Kim Kee-soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.85-90
    • /
    • 2002
  • In the construction industry, projects are becoming increasingly large and complex, involving multiple subcontractors. Traditional centralized coordination techniques used by the general contractors become less effective as subcontractors perform most work and provide their own resources. When subcontractors cannot provide enough resources, they hinder their own performance as well as that of other subcontractors and ultimately the entire project. Thus, construction projects need a new distributed coordination approach wherein all of the concerned subcontractors can reschedule a project dynamically. To enable the new distributed coordination of project schedule changes, I developed a novel agent-based compensatory negotiation methodology, which allows software agents to simulate negotiations on behalf of their human subcontractors. This research formalizes the necessary steps that would help construction project participants to increase the efficiency of their resource use, which in turn will enhance successful completions of whole projects.

  • PDF

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

A Study for Derivation of Participant's Information Flow At Framework Construction based on BIM (BIM 기반의 골조공사에서 참여자별 정보의 흐름 도출에 관한 연구)

  • Kim, Yong-Hwa;Lee, Ju-Sung;Oh, Jung-Keun;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.22-34
    • /
    • 2013
  • As construction project has been becoming larger, specialized and complicated, it is important to utilize a lot of information that is made by diverse participants. Especially this information is mainly produced in construction site that plays a leading role in construction project. The problem of information exchange between participants of construction site causes decline of construction productivity. So as to resolve this problem, there is a many interest in BIM(Building Information Modeling) that makes and manages a necessary data during building life cycle. But in Korea construction industry, applying BIM in construction phase is less active than in design phase. Through studying previous research, this study classify the main cause of failure related to information exchange in framework construction. And by interviewing expert, it draw a work that is possible to apply BIM. Next through analyzing framework construction site that is applied with BIM, this study proposes specific information flow model for supporting work by BIM.

Research on comprehensive engineering design in connection with local communities (지역사회와 연계한 공학계열 종합설계 연구)

  • Huh, Wonwhoi
    • Journal of the Korea Convergence Society
    • /
    • v.12 no.3
    • /
    • pp.133-139
    • /
    • 2021
  • In the era of the 4th industrial revolution in order to cultivate excellent human resources equipped with international competitiveness and new technologies the university's engineering education is gradually improving through a number of studies. Comprehensive design in engineering is a course that emphasizes the importance of design education and nurtures future talents that are practically needed in the industrial field. In this study focusing on the researcher's 2019 engineering-related comprehensive design courses students apply new technologies learned in college to actual practice propose creative ideas and develop practical results that solve problems of local welfare facilities. The curriculum was described in which students took the initiative to find problems in community welfare facilities and developed VR contents for disaster response education for the socially disadvantaged. Through this study, students solved the motion limitations of existing earthquake VR contents by connecting them with motion chairs. As a result, it is meaningful that students contributed to the local community as well as cultivating their ability to adapt in the field.

Use Case Points Estimation for the Software Cost Appraisal (소프트웨어 개발비 감정을 위한 유스케이스 점수 추정)

  • Kwon, Ki-Tae
    • Journal of Software Assessment and Valuation
    • /
    • v.16 no.1
    • /
    • pp.27-36
    • /
    • 2020
  • The software development cost appraisal is treated as a part of the program completion appraisal, and the software engineering methodology is applied. In particular, software cost estimation techniques have been actively applied. For more information about the software development costs calculation, we can refer to the "SW cost estimation guide". Although successful appraisal of a number of development costs based on the guide has been processed, but a number of cases requiring discussion of appraisal results have been discovered. In this study, we propose a use case-based size estimation method to maintain the accuracy and consistency of size estimation. As a result of performing performance evaluation of the proposed method in an environment similar to the development cost appraisal case, it was proved that the accuracy was improved over the existing function points method.

A Study on Remote Usability Test & Evaluation for Web Sites -with emphasis on the development of remote interaction observation & analysis software (웹사이트 원격 사용성 테스트에 관한 연구 - 원격 사용자 인터랙션 관찰 및 분석 도구의 개발을 중심으로)

  • 오기태;이건표
    • Archives of design research
    • /
    • v.17 no.3
    • /
    • pp.147-156
    • /
    • 2004
  • Currently, usability tests for web sites with representative users are conducted in laboratory environment that disturbs subjects' natural behavior. These test methods are inefficient for tests that require large number of subjects, because experimenters and subjects should be located in the same place at the same time during the test. In this study, a remote usability test tool, called 'RIO' has been developed to cope with these laboratory-based experiment problems - the 'synchronism' and the 'unnatural environment'. The tool is separated into three parts: 'Project Manager', 'Remote Interaction Observer', and 'Interaction Analyzer'. 'Project Manager' sets up overall experimental parameters and actual tasks to be peformed by subjects. 'Remote Interaction Observer', endued with Microsoft Internet Explorer Control, is a modified Web Browser which records user interactions, screen images and elaborate browser events while subject performs given tasks. This module is distributed to subjects as an installable software package. When they finish all the tasks, the captured interaction data is compressed and sent to 'Interaction Data Server' automatically. 'Interaction Analyzer' visualizes interaction data from the 'Interaction Data Server'. It also generates project-scope statistics which facilitate discovering peculiar cases among interaction submissions.

  • PDF

A Study on eDesign Platform for Effective Communication and Information sharing - with an emphasis on process and template (효과적인 커뮤니케이션과 정보공유를 위한 e디자인 플랫폼 구축에 관한 연구 - 프로세스와 템플릿을 중심으로)

  • 윤주현
    • Archives of design research
    • /
    • v.17 no.2
    • /
    • pp.425-436
    • /
    • 2004
  • A new design field called eDesign appears as if eBiz is an online related business in which an industrialized design creates the individual value added facing a digital revolution. The field of eDesign requires a special design process and management methodology regardless of the fact that human sensitivity will be satisfied through a dehumanized computer technique. However, it is the reality of eDesign that has been dependent upon a simple process or project management tool of general design. In this study, we develop an eDesign platform based on an eDesign process and template mainly focused on eBusiness in order to overcome the wrong situation. The template is a kind of document that has a standardization form. We aim to establish a general process through various case projects, store information using a necessary template, and use for the way of visual communication. We propose a standard of eDesign platform that can be widely applied to the field of design, medium and small enterprises focused on IT businesses or design-team through this project performed as an educational-industrial study. It makes it possible to get a detailed process methodology, which can be applied to many small design related companies that don't have their own process yet, and will be a scale for comparing their own process in which the company has a process of opened standard eDesign with it. In addition, it makes possible a systematic control of the own projects within and outside the firm, accumulating information for the firm through the database, and easy communication. Furthermore, it can be applied to check the process of the project as a checklist, and then it will reduce trial and error repeated for every project that has been done.

  • PDF

Improving the Efficiency of DMAIC Application Process through the Case Studies of Practical Six Sigma Construction Projects (6시그마 건설실무 적용사례 분석을 통한 DMAIC 적용 프로세스의 효율성 제고)

  • Kwon, O-Bin;Lee, Seung-Hyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.88-100
    • /
    • 2010
  • As the competition between companies are deepened, the number of companies adopting six sigma principles, which is one of the innovative management strategies, are increasing. According to this trend, the changes in both strategies and methodologies of six sigma are continuous. However, the evaluations and the management principles included in the process after the six sigma applications are insufficient, and the cooperation between the parties in the company is also not enough because the application process of six sigma is too complex and not efficient. In order to solve this problem, a research for developing the methodology which can learn about and do six sigma applications is so necessary, specifically for expanding the six sigma applications and introducing the participation of all company members. The purpose of this study, therefore, was to develop and present more efficient Six Sigma applied process by reducing the existing unnecessary steps in improvement one, by applying the examination method of wasteful elements on the potential factors, through analyzing the Six Sigma DMAIC applied case in the construction industry. The result of those application showed that the detection of potential factors using wasting elements was possible in measurement step and that it was possible for the improved process with reduced steps compared to existing process while to remain the outcomes. It is considered that the performance rate of Six Sigma project will be improved significantly because the reduction in the improvement step does not affect the improvement effect within the whole Six Sigma project.