• Title/Summary/Keyword: 누수지수

Search Result 49, Processing Time 0.021 seconds

A Case Study of Correlation between Inflows and Geological Structures around Underground Caverns (지하 유류저장 공동의 지질구조와 공동누수량 상호관계에 관한 사례)

  • 전한석
    • The Journal of Engineering Geology
    • /
    • v.10 no.1
    • /
    • pp.79-93
    • /
    • 2000
  • When caverns are excavated, it is very important to understand the distribution and charateristics of geological structures because the structures have an significant effect on grouting, rock reinforcement, and groundwater flow, etc. The main water bearing fractures have an orientation of N50~60W and these fractures are known as tension fractures. Their orientation coincides with a long elliptical axis ofpumping test, and they cross the tension fractures of N10~30E. They have typical fracture systems ofrhombic type in this area.

  • PDF

Analysis of Stream Depletion Rate by Groundwater Abstraction in Leaky Aquifer (누수대수층 지하수 양수에 따른 하천수 감소율 거동 분석)

  • Lee, Jeongwoo;Chung, Il-Moon;Kim, Nam Won
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.37 no.6
    • /
    • pp.1001-1008
    • /
    • 2017
  • This study was to evaluate the stream depletion rate from groundwater pumping with varying stream-well distance, aquifer transmissivity, storage coefficient, leakage coefficient, streambed hydraulic conductance using the Zlotnik and Tartakovsky analytical solution which considers a two-layer leaky aquifer-stream-well system. For the hydraulic conditions applied in this study, the streambed hydraulic conductance and the aquitard leakage coefficient were assessed to have a dominant influence on the stream depletion rate. In order to evaluate the applicability of Zlotnik and Tartakovsky analytical solution ignoring the change in the drawdown in the lower aquifer and applying the fixed head boundary condition, the solution was compared with Hunt analytical solution derived from the more practical conditions simultaneously taking into account the drawdown changes in the upper and lower aquifers. As a result, the Zlotnik and Tartakovsky analytical solution is suitable for predicting short-term effects of less than one year in the pumping period, and when the stream depletion factor (SDF) is greater than 2,500 days, or when the product of the leakage coefficient and the stream-well distance is less than 10 cm/s.

An Experimental Study on the Dryness Judgement Criterion for Water-cooled Generator Stator Windings (수냉각 발전기 고정자의 권선 내부 건조 판정 기준 설정에 관한 실험적 연구)

  • Kim, Hee-Soo;Bae, Yong-Chae;Lee, Wook-Ryun;Lee, Doo-Young
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.34 no.2
    • /
    • pp.137-143
    • /
    • 2010
  • Complete dryness inside the stator is a necessary and sufficient condition for the leak test. Microcracks caused by high cycle fatigue due to operation are generated in stator windings, and they are interrupted by water molecules during the leak test. For this reason, during leak test, the wrong value is indicated when there are no leaks in stator windings. Generator manufacturers presents unique dryness judgment criteria for the leak test, but there is no actual criterion that accurately indicates the dryness point for the leak test. The reason is because stator winding has a complex structure and the absence of effective dryness equipment in power plants. This paper proposes a dryness judgment criterion to evaluate if inside the stator winding is dried completely and presents experimental results.

A methodology to determine realtime monitoring locations for water distribution systems based on the effect index matrix (영향행렬지수를 기반으로 한 상수관망의 실시간 모니터링 지점의 결정 알고리즘)

  • Jun, Hwan-Don;Cho, Moon-Soo;Back, Chun-Woo;Yoo, Do-Guen;Kim, Joong-Hoon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.1428-1432
    • /
    • 2008
  • 상수관망이 노후화됨에 따라 파괴나 누수와 같은 운영상의 문제가 빈번하게 발생한다. 따라서 상수관망의 상태를 보다 정확히 파악하여 운영할 경우 안정적인 상수관망의 운영이 가능할 것이며 관파괴와 같은 돌발적인 사태의 피해를 최소화 할 수 있을 것이다. 그러나 상수관망의 실시간 모니터링 센서중 대표적인 online 압력계를 모든 지점에 설치할 경우 과다한 초기투자 비용이 소요되며 시스템의 유지관리 측면에서도 적절하지 않다. 따라서 본 연구에서는 상수관망의 실시간 모니터링을 위한 적정한 규모의 online 압력계 설치위치의 결정 방법을 제안하였다. 제안된 방법은 영향행렬지수(Effect Index Matrix)를 기반으로 하며 영향행렬지수내 column search를 수행하여 online 압력계의 위치를 선정한다. 제안된 방법을 미국의 Cherry Hill 상수관망에 적용하여 적용성을 검증하였다.

  • PDF

The Permeability Characteristic of Z-Type Sheet Pile Joints under Water Sealing Conditions (지수조건에 따른 Z형 강널말뚝 연결부의 투수특성)

  • Chung, Ha-Ik;Lee, Yong-Soo;Hong, Seung-Seo
    • Journal of the Korean GEO-environmental Society
    • /
    • v.5 no.4
    • /
    • pp.57-63
    • /
    • 2004
  • In general steel sheet piles are used in the containment system, which are vertical barrier systems for waste disposal and landfill purposes, and roads in excavation for temporary structure. This paper presents case study of the use of an interlocking sheet pile for water and containment. Cut-off Z-type sheet pile joints are investigated to determine their permeability from the field test. Four different joint sealing materials are used in field test. The results showed joint permeability is significant time-dependent and joint-dependent. These are explored and conclusions on permeability characteristics of different sealants are noted. A case study gives a design example as well as suggestion on permeability and water tightness can be implemented in using the sheet pile barrier in civil and environment works. From the test results, the effective sealing programs of sheet pile interlocks are suggested.

  • PDF

Evaluation of waterproof and durability of hydrophilic waterstop (수팽창 지수재의 방수 성능 및 내구성 평가)

  • Choi, Woo-Yong;Lee, Hyeun-Pil;Jun, Gy-Chan;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.16 no.2
    • /
    • pp.117-124
    • /
    • 2014
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic waterstop by the construction error and excessive displacement of segment was studied firstly. Secondly, the decrease of durability of hydrophilic waterstop by the sulphate and chloride contained in the groundwater and seawater was investigated. The results showed that if the angle discordance at the segment joints is beyond the 2 degree, the proper waterproof capacity of hydrophilic waterstop can not be guaranteed. In addition, if the hydrophilic rubber waterstop is exposed to the sulphate for a while, the proper durability of hydrophilic waterstop can not be expected.

Verification of Reinforcement with Grouting Materials in a Small Scale Reservoir Dike using Surface and Borehole Electrical Resistivity survey (지표 및 시추공 전기비저항 탐사를 중심으로)

  • Song, Sung-Ho;Yong, Hwan-Ho;Kim, Yang-Bin
    • Geophysics and Geophysical Exploration
    • /
    • v.12 no.3
    • /
    • pp.239-245
    • /
    • 2009
  • To verify the reinforcing effect of grouting materials composed of colloid cement and ordinary portland cement on the water leakage region in a small scale dike, we performed a tubecasing method and applied surface electrical resistivity survey including electrical resistivity tomography (ERT) to find resistivity variation before and after grouting. Hydraulic conductivities after grouting show 10 times lower than those of before grouting. These variation indicates that the cement grout blocks the leakage pathway effectively. As the results of dipole-dipole resistivity survey along the dike, resistivity distribution after grouting did not represent noticeable spatial variation in time. Resistivity monitoring results at the dike with vertical electrical sounding (VES) showed that the region of decreasing apparent resistivity was occupied by the grout after grouting. Predicted resistivities from the inversion of ERT data well matched with results of VES at the same regions. From the ERT using check holes to inspect the effect of grouting, we could find that the ERT is quite effective to identify spatially the grout region in a dike.

Application of Damage Index for Limit State Evaluation of a Steel Pipe Tee (강재 배관 Tee의 한계상태 평가를 위한 손상지수의 적용)

  • Kim, Sung-Wan;Yun, Da-Woon;Jeon, Bub-Gyu;Kim, Seong-Do
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.26 no.4
    • /
    • pp.30-39
    • /
    • 2022
  • Maintaining structural integrity of major apparatuses in a nuclear power plant, including piping system, is recognized as a critical safety issue. The integrity of piping system is also a critical matter related to the safety of a nuclear power plant. The actual failure mode of a piping system due to a seismic load is the leakage due to a fatigue crack, and the structural damage mechanism is the low-cycle fatigue due to large relative displacement that may cause plastic deformation. In this study, in-plane cyclic loading tests were conducted under various constant amplitudes using specimens composed of steel straight pipes and a steel pipe tee in the piping system of a nuclear power plant. The loading amplitude was increased to consider the relative displacement generated in the piping system under seismic loads, and the test was conducted until leakage, which is the limit state of the steel pipe tee, occurred due to fatigue cracks. The limit state of the steel pipe tee was expressed using a damage model based on the damage index that used the force-displacement relationship. As a result, it was confirmed that the limit state of the steel pipe tee can be quantitatively expressed using the damage index.

Waterproofing performance evaluation according to the number of layer for shield TBM segment hydrophilic rubber waterstop (쉴드 TBM 세그먼트 지수재의 배열수 변화에 따른 방수성능 평가)

  • Ham, Soo-Kwon;Jung, Hoon;Kim, Beom-Ju;Jeong, Kyeong-han;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.22 no.1
    • /
    • pp.47-58
    • /
    • 2020
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop by the construction error and excessive displacement of segment was studied. In particular, the waterproof capacity of each of single and double layer arrangements of hydrophilic rubber waterstop was examined to verify the efficiency of the double layer arrangement. The test results show that the single layer and double layer hydrophilic rubber waterstop showed the same waterproof performance. hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap.

Assessment of Bond Characteristics between New and Old Concrete in Various Mixtures and Joint Conditions (배합 및 접합면 처리에 따른 신·구 콘크리트의 부착특성 평가)

  • Cho, Byeong-Du;Kim, Sang-Hyun;Jeon, Se-Jin
    • Journal of the Korea Concrete Institute
    • /
    • v.26 no.4
    • /
    • pp.507-515
    • /
    • 2014
  • Although the construction joints of a concrete structure are properly treated with some measures, leakage has frequently occurred. A series of tests on the bond characteristics between new and old concrete were carried out in this study, assuming that the leakage at the construction joints has certain relationship with the bond of concrete. To assess the bond characteristics under various conditions, a number of specimens were made that have an interface between new and old concrete and bond strength, flexural strength and splitting tensile strength were measured. Main test variables are type and amount of mineral admixtures, treatment method of the interface and type of waterstops. In addition, the effects of placing interval between the concrete and of the age of the strength tests were investigated. The test results showed a slightly increased bond strength when applying mineral admixtures, which can be attributed to the interface filled with the calcium silicate hydrate that is formed by pozzolanic reaction. On the other hand, the bond strength was higher when the interface was treated rough and dry, and the roughness of a waterstop affected the bond capacity of the waterstop. Also, an assessment is required that considers the type of strength test because the bond strength varied according to the test methods.