• Title/Summary/Keyword: 누수시험

Search Result 147, Processing Time 0.027 seconds

Drainage system for leakage treatment of cement concrete structure in underground (콘크리트 지하구조물 누수 처리를 위한 유도배수시스템)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.573-585
    • /
    • 2019
  • The objective of this study is to propose the drainage system that has been improved the workability, waterproofing and drainage performance to treat the leakage from the cement concrete structures in underground. It is improved that the pipe for conveying ground leak in the existing drainage system had the problem in workability and waterproof. The drainage systems with the improved pipe for conveying ground leak were constructed in conventional concrete lining tunnels to evaluate the workability, waterproofing and drainage. The waterproof and the drainage performance of the drainage system was evaluated by injecting 1,000 ml of red water in the back of the drainage system at 3 weeks, 6 weeks, 9 weeks, 11 weeks, 14 weeks, 17 weeks and 23 weeks. During 6 months of field performance test, the average daily temperature of the tunnel site was measured from $-12.4^{\circ}C$ to $19.7^{\circ}C$. The daily minimum temperature was $-17.2^{\circ}C$ and the daily maximum temperature was $26.7^{\circ}C$. There was no problem in waterproof and drainage performance on the pipe for conveying ground leak and the drainage system during 6 months for field performance test. It is concluded that the improved drainage system can be applied to various cement concrete underground structures where leakage occurs, and has little seasonal effect.

Long-term performance of drainage system for leakage treatment of tunnel operating in cold region (한랭지역에서 운영 중인 터널의 누수처리를 위한 유도배수시스템의 장기 성능 평가)

  • Kim, Dong-Gyou
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1177-1192
    • /
    • 2018
  • The objective of this study is to develop the existing drainage system for catching the partial leakage of tunnel structures operating in cold region. The drainage system consists of drainage board, Hotty-gel as a waterproofing material, cover for preventing protrusion of Hotty-gel, air nailer, fixed nail, pipe for collecting ground leak, pipe for conveying ground leak, wire-mesh, and sprayed cement mortar. The drainage systems were installed in conventional concrete lining tunnels to evaluate the site applicability and constructability. The performances of waterproof and the drainage in the drainage system were evaluated by injecting 1,000 ml of red water in the back of the drainage system at 7 days, 14 days, 21 days, 28 days, 2 months, 3 months, 4 months, 5 months, 6 months, 7 months and 8 months. During 8 months of field test, the average daily temperature of the tunnel site was measured from $-16.0^{\circ}C$ to $25.6^{\circ}C$. The daily minimum temperature was $-21.3^{\circ}C$ and the daily maximum temperature was $30.8^{\circ}C$. There was no problem in waterproof and drainage performance of the drainage board in the drainage system. However, the pipe for conveying ground leak had the leakage problem from 14 days. It is considered that the leakage of the pipe for conveying ground leak was caused by the deformation of the pipe of the flexible plastic material having a thickness of 0.2 cm by using the high pressure air nailer and the fixing pin and the insufficient thickness and width of the hotty-gel for preventing the leakage.

Development of TDR-based Water Leak Detection Sensor for Seawater Pipeline of Ship (시간영역반사계를 이용한 해수배관시스템의 누수 탐지용 센서 개발 연구)

  • Hwang, Hyun-Kyu;Shin, Dong-Ho;Kim, Heon-Hui;Lee, Jung-Hyung
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.6
    • /
    • pp.1044-1053
    • /
    • 2022
  • Time domain reflectometry (TDR) is a diagnostic technique to evaluate the physical integrity of cable and finds application in leak detection and localization of piping system. In this study, a cable-shaped leak detection sensor was proposed using the TDR technique for monitoring leakage detection of ship's engine room seawater piping system. The cable sensor was developed using a twisted pair arrangement and wound by an absorbent material. The availability and performance of the sensor for leak detection and localization were evaluated on a lab-scale pipeline set up. The developed sensor was installed onto the pipes and flanges of the lab-scale set up and various TDR waveforms were acquired and analyzed according to the dif erent variables including the number of twists and sheath thickness. The result indicated that the twisted cable sensor was able to produce clear and smooth signal as compared to the TDR sensor with a parallel arrangement. The optimal number of twist was determined to be above 10 per the unit length. The optimal diameter of sheath thickness that results in the desired sensitivity was determined to be ranging from 80% up to 120% of the diameter of the conductor. The linear regression analysis for estimation of leak localization was carried out to estimate the location of the leakage, and the result was a determination coefficient of 0.9998, indicating a positive relationship with the actual leakage point. The proposed TDR based leak detection method appears to be an effective method for monitoring leakage of ship's seawater piping system.

Evaluation of Permeability Characteristics of Yangsan Clay by Laboratory Tests (실내시험을 통한 양산점토의 투수특성 평가)

  • 김동휘;김진원;임형덕;김대규;이우진
    • Journal of the Korean Geotechnical Society
    • /
    • v.17 no.4
    • /
    • pp.249-257
    • /
    • 2001
  • 본 논문에서는 경남 양산지역의 퇴적층에서 채취한 불교란 시료를 이용하여 표준압밀시험($IL_{CON}$)과 일정변형률(CRS, Constant Rates of Strain) 압밀시험을 수행한 후 각각의 시험결과를 분석하여 양산점토의 투수특성을 고찰하였다. 이를 위하여 투수계수와 간극비의 관계를 Kozeny(1927)와 Carman(1956) 이후 제안된 많은 연구결과와 비교, 검토하였으며, 시료를 연직방향으로 성형하여 CRS 시험을 수행한 후 횡방향투수계수를 산정하여 양산점토의 투수계수의 이방성을 살펴보았다. CRS시험 결과, 직접적으로 정상류를 발생시켜 누수계수를 측정하는 Rowe cell 시험에 비하여 상대적으로 투수계수의 이방성이 과소평가되는 경향을 보였다. 또한 현장 투수계수에 영향을 미치는 요소들을 살펴보고, 깊이에 따른 투수계수를 고찰하였다.다.

  • PDF

Computing Hydraulic Parameters of Fractured Aquifers Using Fractal Model of Groundwater Flow with Leakage (누수를 포함하는 지하수 유동의 프락탈 모델 적용에 의한 균열 암반 대수층의 수리상수 산출)

  • 함세영;임정웅
    • The Journal of Engineering Geology
    • /
    • v.4 no.2
    • /
    • pp.219-229
    • /
    • 1994
  • Since groundwater flow in fractured rocks is controlled by the distribution of fractures irregu1arly developed in space, it is not possible to understand the hydraulic characteristics of fractured aquifers using Theis equation which is applicable only to homogeneous isotropic confined aquifer. This study deals with the theoretical background of the fractal groundwater flow model with leakage, the methodology of calculation of the hydraulic parameters, and the application of the developed model to field data. From the result of the application of the fractal model to two field data in Hongcheon and Yusung areas, we obtained a good match between theoretical curves and observed curves, with the same hydraulic parameters at the pumping well and the observation well. In the two pumping test analyses, we have determined 1.9 of the fractal dimension. This means that the dimension of groundwater flow at these two sites is slightly smaller than radial flow.

  • PDF

Time-lapse Inversion of 2D Resistivity Monitoring Data (2차원 전기비저항 모니터링 자료의 시간경과 역산)

  • Kim, Ki-Ju;Cho, In-Ky;Jeoung, Jae-Hyeung
    • Geophysics and Geophysical Exploration
    • /
    • v.11 no.4
    • /
    • pp.326-334
    • /
    • 2008
  • The resistivity method has been used to image the electrical properties of the subsurface. Especially, this method has become suitable for monitoring since data could be rapidly and automatically acquired. In this study, we developed a time-lapse inversion algorithm for the interpretation of resistivity monitoring data. The developed inversion algorithm imposes a big penalty on the model parameter with small change, while a minimal penalty on the model parameter with large change compared to the reference model. Through the numerical experiments, we can ensure that the time-lapse inversion result shows more accurate and focused image where model parameters have changed. Also, applying the timelapse inversion method to the leakage detection of an embankment dam, we can confirm that there are three major leakage zones, but they have not changed over time.

The Effect of Remedial Works to Control the Leakage Problem in Earth Fill Dam by Compaction Grouting (콤팩션 그라우팅에 의한 흙댐의 누수복원 공사효과 분석)

  • Chun, Byung-Sik;Lee, Yong-Jae;Chung, Ha-Ik
    • Journal of the Korean Geotechnical Society
    • /
    • v.22 no.11
    • /
    • pp.13-23
    • /
    • 2006
  • The sinkhole and leakage in dam core were detected at one of earth fill dams in Korea. The damage areas in the core of the dam were repaired by compaction grouting method. This study is to evaluate compaction grouting activity by in-situ and laboratory experiments before, during and after the remedial work. The intensive site investigation and geophysical survey were conducted during and after the compaction grouting work. The compaction grouting work was carried out for the damaged dam core between June 16 and August 24, 2000. The leakage reduction generally occurred in the core of the dam after the remedial work. The use of compaction grouting was considered the proper countermeasures for repairing the damaged dam. It shows that the loose or voided zones have been properly filled and the leakage has been reduced by about 96% of that before the treatment of the remedial work performed at dam core by compaction grouting.

Effect of Leakage on Deterioration of Concrete Lining Structure (콘크리트 라이닝 구조물의 누수에 의한 열화특성)

  • Jung, Ho-Seop;Kim, Dong-Cyou;Kim, Seong-Soo;Park, Kwang-Pil
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2009.05a
    • /
    • pp.287-288
    • /
    • 2009
  • In this study, the degree of deterioration on the tunnel lining concrete due to crack and leakage was evaluated by field-investigating the conventional tunnels constructed a long time ago. By examining the exterior, conducting the non-destructive test and collecting cores for the tunnel concrete linings, this study evaluated the compressive strength and the permeability, and also performed instrumental analyses.

  • PDF

Ashpalt 2 Component Adhesive Leakage Repair Sealant Evaluation (아스팔트 2액형 점착재의 누수보수 평가에 관한 연구)

  • Cho, Il-Kyu;Kim, Keun-Hur;Oh, Sang-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.140-141
    • /
    • 2017
  • This study is based on the evaluation of a single component injection type adhesive repair material and a new 2 component type used in leakage of underground concrete structures. The studies showed that based on different mix ratio of the 2 component type adhesive sealant comprised of an asphalt main and latex mixture agent the viscosity of the material compound differed significantly. Based on a permeability testing, injection and economic efficiency, and performance, the appropriate ratio was determined to be 6:1 and was proceeded to the KS F 4935 evaluation method. The 2 component type adhesive sealant uses a static mixer and a cartridge type container for the injection procedure and was able to satisfy the evaluation criteria outlined in the KS F 4935 standard.

  • PDF

Behavior Analysis of High Pressure Valve Tester (고압용 밸브시험기의 거동해석)

  • Lee, Jong-sun
    • Journal of the Korea Convergence Society
    • /
    • v.10 no.1
    • /
    • pp.149-154
    • /
    • 2019
  • High pressure valve tester used in industrial fields precise measurement gives inconvenience in precise measurement due to manually regulated pressures. In order to improve this inconvenience, the high pressure valve tester was designed by using CATIA and structural analysis of the designed high pressure valve tester was conducted and water leaking, total deformation, strain and stress were obtained by applying ANSYS. These results will be provided to develop new concepts of high pressure valve tester as initial data.