Apartment Housing 25 in the field of construction since 2000 collected by types of labor: reinforced concrete, plaster, internal, equipment, electrics communication, the other work. And the performance of labor input was collected in the amount of construction work performed on a monthly basis. After changing the construction period in the standardization work that is 100% of the construction period, the amount was converted into labor ratio by type. Analysis of the input flow rate and the amount of labor conclusions were as follows: (1) The size of the labor rate is reinforced concrete work (38.25%), plastering work (5.10%), internal work (5.67%), equipment work (9.10%), electrics communication (8.76%), the other works (33.12%) and the size of labor rate is the largest work in reinforced concrete work. (2) The peak of labor input ratio was from 52.5% month to 62.5% month. This was when the labor rate of 3.6%. (3) The period month of the largest labor ratio% is 35% month by reinforced concrete construction, and this time it was 2.12% per month labor rate, and reinforced concrete construction is finishing from 65% month to 80% month. This showed the greatest congestion of mutual interference between each works is being continue. The results of this study are the greatest congestion in apartment housing construction has informed the high period(%months), which is essential to a successful project.
2012년도 건설업 적용 각종 노무 요율이 고시됐다. 고용노동부는 최근 최저임금액을 비롯해 건설업 월평균 보수, 건설공사 노무비율, 산업재해보험요율, 장애인 고용 부담기초액 등을 발표했다. 2012년도에 적용될 최저임금액은 4,580원이며, 건설업 월평균 보수는 2,597,274원, 건설공사 노무비율은 일반 건설공사의 경우 28/100이며, 하도급 건설공사의 경우 32/100, 산업재해보험요율 37/1,000, 장애인 고용 부담기초액은 월 59만원이다.
Korean Journal of Construction Engineering and Management
/
v.2
no.2
s.6
/
pp.81-89
/
2001
Construction industry has particular properties of non-continuity of production, and non-stability of market comparing to other industries. Because of them, the practical construction cost is more difficultly recognized than in manufacturing industry, so, that is various according to many projects. Therefore, it is very hard work to standardize construction cost, and it is worthy of analyzing and measuring exactly construction cost. On this study, the trouble in producing expected construction cost with original cost calculation method is progressed by the data of cost items in complete works. On the basis of analyzing data, as expected cost of practical construction is measured, it can be referred to the method and the standard of indirect labor cost rate in construction.
Korean Journal of Construction Engineering and Management
/
v.16
no.1
/
pp.110-118
/
2015
The standard production unit system is the most basic element in our country construction. However, this standard production unit system shows a large difference in the actual amount of labor input for works at the Apartment housing construction, Therefore, it may be a reasonable alternative to estimate the cost of construction by historical cost data, works will be calculated the cost of labor must determine the exact amount and It is necessary to determine the exact amount of labor input for the construction progress management. This study examines the results of comparing the standard production unit system and the actual amount of labor counting in apartment housing construction was completed in the metropolitan area since 2000, the following results were obtained. the actual amount of labor input are looked for 1.184person/1000 of masonary, $0.084persons/m^2$ of plaster, $0.039persons/m^2$ of Waterproofing, $0.059persons/m^2$ of tile at the Apartment housing construction. in the actual amount of labor counting Compared with standard production unit system, masonry ratio of 59.8%, plaster ratio of 41.3%, waterproofing ratio of 31.5%, tile ratio of 34.3% and The labor rate in the works was the lowest in the plaster. was relatively high in the masonary. Therefore, the amount of labor country apartment housing construction is preferably calculated on historical cost data. But it seems that the amount of labor necessary complement ongoing close enough to the actual standard production unit system a major variable in construction management.
Korea's population change trend is the aging and feminization as Reduction in mortality, average life extension. and is further increased Reduction of birth rate and aging population. if Our country concluded FTA(Free Trade Agreement) with the United States, Europe and China etc. labor-intensive industries will be the decline. Then, the construction workers' jobs are continually reduced. This is critical to the nation's economic, social and environmental influences due to Shortage of construction workforce and increasing labor costs. Eventually this is a major factor in reduced construction productivity. Therefore, this study is presented as a construction productivity development prospects on the value-added analysis per Labour productivity employee from Construction market trends, industry-specific productivity index, industry trends Employed, age tiered workforce trends, women's workforce trends, labor time trend, foreign workers, workforce trends, analysis of trends in construction contract, awarded by Company Size trends, construction management analysis index.
최근 환경문제에 대한 일반인의 관심고조와 함께 3D 기피현상에 따른 철근공, 거푸집공 등의 기능노동자의 부족, 고령화, 외국인노동자 고용 현상과 낮은 노동생산성은 건설업계의 심각한 현안이다. 과거에는 재료비의 비중이 높았으므로 재료의 낭비를 줄이기 위한 합리화가 추진되었다. 그러나 현재는 노무비 비율의 급격한 증대로 인하여 공기단축이나 합리화, 시스템화를 통해서 경쟁에서 생존해 나가고 있다. 건축공사 중 특히 철근 콘크리트공사는 기술의 발전이 느리고, 시공 방법도 과거의 공법을 그대로 유지하고 있는 실정이다. 건축공사비 중 구체공사의 비율은 30% 정도이고, 그 비용 중 인건비가 50% 정도를 차지하고 있기 때문에 철근 콘크리트 공사는 아직도 기술 집약적인 산업이 아닌 노동 집약적 산업으로 간주되는 결과를 초래하고 있다.(중략)
Proceedings of the Korean Radioactive Waste Society Conference
/
2003.11a
/
pp.636-641
/
2003
The purpose of this study is to analyse the ratio of cost object in terms of the disposal cost estimation. According to the results, the ratio of operating cost is the most significant object in total cost. There are a lot of differences between the disposal costs and product costs in view of their constituents. While the product costs may be classified by the direct materials cost, direct manufacturing labor cost, and factory overhead, the disposal cost factors should be constituted by the technical factors and the non-technical factors.
본 논문에서는 국가 경제성장률과 국내 전기공사실적 증가률에 대한 상관관계를 비교분석하였으며, 연간 전기공사 실적에 대한 항목별 구성비율 중 노무비가 차지하는 비율을 분석하였다. "국가를 당사자로 하는 계약에 관한 법률 시행령 및 시행규칙"과 회계예규인 "예정가격 작성기준"에 근거하여 원가계산에 의한 전기공사 예정가격 산정의 기초자료로 활용되는 전기부문 표준품셈 체계개편이 전기공사업에 미치는 영향을 최근 발주된 대형공사에 체계개편 전과 체계개편 후 공사금액을 비교하여 종합적으로 분석하였다.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.579-583
/
2004
A new and extendable highway should be planned and budgeted by estimating the total construction cost on the basis of the precise cost data. However, the demolition or disjointing cost could not reflect construction site condition sufficiently because it was simply estimated by multiplying the highway structure installation cost by the regular ratio($10\~70\%$) specified in the Korea Standard Estimate. The regular ratio for estimating of demolition and disjointing cost was calculated by not actual construction cost data but subjective experiences of field manager. Therefore, the reliance of the estimated demolition or disjointing cost has been declined. The primary objective of this study is to purpose the standard for estimating proper demolition or disjointing cost of relevant items through various site analysis and survey, and to investigate on the propriety of ratio-unit price method for estimating demolition and disjointing cost.
Journal of the Korea Institute of Building Construction
/
v.21
no.2
/
pp.157-163
/
2021
The accident rate is obtained by dividing the number of accidents by the number of regular workers. In the case off construction work, however, the accident rates are not accurately figured out, because they use the approximate number of regular workers, which is estimated based on the amount of construction work and the labor ratio. In addition, the current accident rate estimation method does not reflect the characteristics of construction types, such as building, civil, plant, etc. This study is conducted with the aim of presenting a supplementary method of accident rate assessment that incorporates the characteristics of type of construction. For the purpose of this, correlation and regression analysis are executed to verify the relationships between number of accidents and the amount of construction contract, and several equations are derived which shows the relationship between the number of accidents by accident types and amount of constract by construction types. The result shows that the non-residential work amount and the number of accidents showed a proportional relationship, while the civil work amount and the number of accidents showed an inversely proportional relationship. The results of this research are expected to calibrate the construction accident rates and to be used as an auxiliary indicator to determine the trend of annual accident rates by comparing the values with usual years.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.