• Title/Summary/Keyword: 기준 및 시방

Search Result 148, Processing Time 0.026 seconds

Development and Verification of Eco-hybrid Rolling Mat for Preventing Bank Erosion Based on Large-scale Experiments (실규모 하천 실험을 통한 하안침식 방지 Eco-hybrid 롤링매트 공법 개발 및 검증)

  • Ji, Un;Jang, Eun-Kyung;Ahn, Myeonghui;Kim, Won
    • Ecology and Resilient Infrastructure
    • /
    • v.6 no.4
    • /
    • pp.217-226
    • /
    • 2019
  • Optimum engineering methods for bank protection were classified based on steepness of bank slope and an existence of waterfront facility in the floodplain, and a new concept of eco-hybrid rolling mat method which could be applicable for the unfitted cases with previously developed countermeasures was suggested in this study. The eco-hybrid rolling mat method can be constructed while maintaining the river environment and ecosystem that does not interfere with the ground and slopes, when bank erosion occurs, it is an economical and efficient construction method that can protect the revetment and the bank slope immediately. The developed eco-hybrid rolling mat method was verified for the designed structure, system, function and effect based on large-scale river experiments including field exposure and decomposition test. As a result, the normal operation and effect of the rolling mat ted under low and high velocity conditions were confirmed with respect to bank protection. The effect of bank erosion prevention was quantitatively validated by sediment concentration monitoring and analysis, and the product specification of the eco-hybrid rolling mat was presented based on the standardized mat applied in real-scale tests.

Service Life Variation for RC Structure under Carbonation Considering Korean Design Standard and Design Cover Depth (국내설계기준과 피복두께를 고려한 RC 구조물의 탄산화 내구수명의 변동성)

  • Kim, Yun-Shik;Kwon, Seung-Jun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.25 no.5
    • /
    • pp.15-23
    • /
    • 2021
  • In this paper, service life for RC(Reinforced Concrete) substructure subjective to carbonation was evaluated through deterministic and probabilistic method considering field investigation data and Design Code(KDS 14 20 40). Furthermore changes in service life with increasing COV(Coefficient of Variation) and equivalent safety index meeting the same service life were studied. From the investigation, the mean and its COV of cover depth were evaluated to 70.0 ~ 90.0 mm and 0.2, respectively. With intended failure probability of 10.0 % and 70 mm of cover depth, service life decreased to 137 years, 123 years, and 91 years with increasing COV of 0.05, 0.1, and 0.2, respectively. In the case of 80 mm of cover depth, it changes to 179 years, 161 years, and 120 years with increasing COV. The equivalent safety index meeting the same service life from deterministic method showed 1.66 ~ 3.43 for 70 mm of cover depth and 1.61 ~ 3.24 for 80 mm of cover depth, respectively. The various design parameters covering local environment and quality condition in deterministic method yields a considerable difference of service life, so that determination of design parameters are required for exposure conditions and parameter variation.

An Experimental Study on the Effectiveness of Soil Compaction at Below-Freezing Temperatures (동결 온도에서 다짐효과에 관한 실험적 연구)

  • Hwang, BumSik;Chae, Deokho;Kim, Youngseok;Cho, Wanjei
    • Journal of the Korean GEO-environmental Society
    • /
    • v.16 no.1
    • /
    • pp.37-43
    • /
    • 2015
  • Korea has four distinct seasons, showing hot and humidity in summer and cold weather lasted in winter. Domestic research on earth work has been developed according to the seasonal characteristics, and most of research topics have focused on the effect of freezing-thawing on the performance of geo-materials. However, the previous research was performed on the ground compacted at room temperature and therefore, the effect of the sub-zero temperature at the time of construction was not fully investigated. The ground characteristics compacted at freezing temperature can be different from those at room temperature and show different characteristics of strength and deformation caused by freezing and thawing. Therefore, the compaction tests on sandy materials were conducted under various temperature at $-3^{\circ}C$ and $-8^{\circ}C$ with various fine contents of 0%, 5%, 10% and 15% in weight fraction. The effectiveness of soil compaction at below-freezing temperatures were compared with the compaction at room temperature at $18^{\circ}C$ in terms of the maximum dry unit weight and optimum water contents. Based on the test results, the maximum dry unit weight tends to decrease with the freezing temperature and the relative compaction at $-8^{\circ}C$ can not be satisfied with general specification standard.

Seismic Performance Evaluation of Full-Sized RC Bridge Piers with tap-Spliced longitudinal Steels according to Lateral Confinement (주철근 겹침이음된 실물교각의 횡구속 정도에 따른 내진성능 평가)

  • Park Chang-Kyu;Chung Young-Soo;Ko Seong-Hyun;Lee Jae-Hoon
    • Journal of the Korea Concrete Institute
    • /
    • v.16 no.5 s.83
    • /
    • pp.687-696
    • /
    • 2004
  • It has been known that practically unavoidable lap splices of longitudinal reinforcement in the plastic hinge region have a bad effect on the seismic performance of reinforced concrete bridge columns. Lap splices were usually located in the plastic hinge region of most bridge columns designed before the implementation of the new seismic design provisions of 1992 Korea Bridge Design specification. The objective of this research is to evaluate the seismic performance of full-sized reinforced concrete bridge piers with lap splice of longitudinal reinforcement in the plastic hinge region, and to develop an appropriate lateral confinement concept of RC bridge columns with lap-spliced longitudinal steels in low or moderate seismicity region. Eight test specimens in the aspect ratio of 4.0 were made with three types of lap splicing, two levels of confinement steel ratios and two types of tie configurations. It was confirmed from the Quasi-Static test that displacement ductility ratios were significantly reduced for nonseismic test columns with lap spliced longitudinal steels but were satisfied the seismic requirement for limited ductile design specimens. As a conclusion, pertinent lateral confinement content was proposed for the seismic. performance of RC bridge piers with $50\%$ lap-spliced longitudinal reinforcing steels in low or moderate seismicity region.

Evaluation on the Behavior of Slip Critical Joints with TS High Strength Bolts Subjected to a Size of Bolt Holes (볼트 구멍 크기에 따른 TS 고력볼트 접합부 거동 평가)

  • Lee, Hyeon Ju;Kim, Kang Seok;Nah, Hwan Seon;Lee, Kang Min;Kim, Hyun Chul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.2
    • /
    • pp.136-143
    • /
    • 2011
  • The oversized and slotted holes are frequently required for the built-up in construction sites. The foreign provisions specify the reduction of the slip load subjected to the size of bolt holes and the direction of load. There are no domestic building codes and researches on the bolt holes. Therefore, it is necessary to evaluate a change of joint strength quantitatively according to the bolt-hole size and surface condition by means of experiment. This study was conducted to evaluate the slip load subjected to the size of bolt holes, and measured on a change of clamping force of high strength bolts during 168 and 800 hours to analyze the trend of relaxation after fastening bolts. Torque shear bolts defined on KS B 2819 was used for the specimen. Test results exhibit that the variation on the slip load of the others was below 10% by contrast with the standard hole and the highest rate of relaxation was 2.66% of the initial clamping force at the case of the long-slotted hole of 2.5D.

Study on the Standardization of Management Form through Integrated Management of CCTV (CCTV 통합관리를 위한 관리대장 표준화 연구)

  • PARK, Jeong-Woo;LEE, Seong-Ho;NAM, Kwang-Woo
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • v.19 no.2
    • /
    • pp.63-72
    • /
    • 2016
  • Closed-circuit television(CCTV) is a facility that forms the backbone of the ubiquitous services provided by the Integrated Management Center of the Ministry of Land, Infrastructure and Transport and the Integrated Control Center of the Ministry of the Interior. However, it is installed and managed according to different laws, as it is operated and managed by each department. Moreover, because there are no regulatory grounds for unified management of CCTV, each municipality responsible for the actual management manages it based on the individual standards of each department. Thus, the purpose of this study is to develop a standardized management form to establish an integrated management plan. The author inspected the existing situation by examining the legal system and public data and through hands-on worker interviews, and discovered the managed element by reviewing the specifications of the bidding system. The management form for integrated management comprises the above requirements along with the management histories and linkage of intelligent facilities. A uniform management form for integrated management containing specifications of the CCTVs installed by various departments is created, and is easily searched for facilities to check requirements for joint use. The result of this study can contribute to building the database of facility management system for integrated management of facilities at the integrated management center as well as for a detailed simulation of the selection of location of CCTV depending on the CCTV's specifications.

A Study on the Filed application of Environmental Friendly Porous Concrete For Retaining Wall (환경친화 옹벽용 포러스콘크리트의 현장적용성에 관한 연구Ⅱ)

  • Kim, Jeong-Hwan;Lee, Nam-Ik;Lee, Jun;Park, Seung-Bum;Jang, Young-Il;Seo, Dae-Suck
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.817-820
    • /
    • 2008
  • The river environments of many streams in korea have been deteriorate through the rapid industrialization and urbanization since the 1960s. In korea, on the other hand, much efforts on the research and project have been made for the restoration of the deteriorated streams to close-to-nature. in order to restore the deteriorated streams, therefore, it is necessary to investigate such advanced technologies and materials. In view of this requirement, various research paths are being taken focusing on coarse aggregates to make multi-functional porous concrete having continuous voids so as to improve water and air permeability, acoustic absorption, water purification and applicability to vegetation. The Purpose of this study is to investigate the method for recovery of the environment in the streams area using porous concrete retaining wall block. the multi-P.O.C block applies for test in the Jangduri-cheon have been monitored planting, stability etc. after 6 months, plant grows flourishing and reconstructed in state such as nature rivers.

  • PDF

Instrumentation Management of the Deep Soft Ground with Dredged Clay Reclaimed in the Upper (준설점토가 상부에 매립된 대심도 연약지반 계측관리)

  • Jung, Na-Young;Kang, Seung-Chan;Kim, Tae-Hyung
    • Journal of the Korean Geotechnical Society
    • /
    • v.38 no.12
    • /
    • pp.67-78
    • /
    • 2022
  • In this study, the measurement results of the coastal deep soft ground buried in the upper part of the dredged clay were analyzed and compared with the current specification standards. Based on the results, a suitable proposal was suggested for the selection, installation, data arrangement, and analysis of each instrument used in the deep soft ground improvement construction. The pore water pressure meter has a range of 1.5 times or more of the expected measurement range, considering the field conditions of the soft ground. The groundwater level meter installed in the horizontal drainage layer checks the change in the groundwater level during the embanking as well as the performance of the catchment well and the horizontal drainage layer. Therefore, it is important to manage so that the groundwater level exists inside the horizontal drainage layer during embanking. It is enough to install the inclinometer in the gravel layer below the soft ground or weathered rock with an N value of 40 or more for the deep soft ground. It seems desirable to install a screw type for differential settlement meter. However, the screw type should not settle due to its own weight. Considering that it is a dredged landfill where subsidence occurs significantly, it is sufficient to manage the tolerance of leveling at about 10 mm (L is the one-way distance (km)).

Landscape Object Classification and Attribute Information System for Standardizing Landscape BIM Library (조경 BIM 라이브러리 표준화를 위한 조경객체 및 속성정보 분류체계)

  • Kim, Bok-Young
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.51 no.2
    • /
    • pp.103-119
    • /
    • 2023
  • Since the Korean government has decided to apply the policy of BIM (Building Information Modeling) to the entire construction industry, it has experienced a positive trend in adoption and utilization. BIM can reduce workloads by building model objects into libraries that conform to standards and enable consistent quality, data integrity, and compatibility. In the domestic architecture, civil engineering, and the overseas landscape architecture sectors, many BIM library standardization studies have been conducted, and guidelines have been established based on them. Currently, basic research and attempts to introduce BIM are being made in Korean landscape architecture field, but the diffusion has been delayed due to difficulties in application. This can be addressed by enhancing the efficiency of BIM work using standardized libraries. Therefore, this study aims to provide a starting point for discussions and present a classification system for objects and attribute information that can be referred to when creating landscape libraries in practice. The standardization of landscape BIM library was explored from two directions: object classification and attribute information items. First, the Korean construction information classification system, product inventory classification system, landscape design and construction standards, and BIM object classification of the NLA (Norwegian Association of Landscape Architects) were referred to classify landscape objects. As a result, the objects were divided into 12 subcategories, including 'trees', 'shrubs', 'ground cover and others', 'outdoor installation', 'outdoor lighting facility', 'stairs and ramp', 'outdoor wall', 'outdoor structure', 'pavement', 'curb', 'irrigation', and 'drainage' under five major categories: 'landscape plant', 'landscape facility', 'landscape structure', 'landscape pavement', and 'irrigation and drainage'. Next, the attribute information for the objects was extracted and structured. To do this, the common attribute information items of the KBIMS (Korean BIM Standard) were included, and the object attribute information items that vary according to the type of objects were included by referring to the PDT (Product Data Template) of the LI (UK Landscape Institute). As a result, the common attributes included information on 'identification', 'distribution', 'classification', and 'manufacture and supply' information, while the object attributes included information on 'naming', 'specifications', 'installation or construction', 'performance', 'sustainability', and 'operations and maintenance'. The significance of this study lies in establishing the foundation for the introduction of landscape BIM through the standardization of library objects, which will enhance the efficiency of modeling tasks and improve the data consistency of BIM models across various disciplines in the construction industry.

Development of the Construction Procedures Prototype and Analysis of Construction Period for the HPC Method (HPC공법의 공사절차 프로토타입 개발 및 공사기간 분석)

  • Kim, Jae-Yeob
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.6
    • /
    • pp.577-585
    • /
    • 2017
  • HPC method is developing to improve the constructability and structural performance of the existing PC method. The objective of this study is to develop construction procedures and to analysis of construction period for HPC method. In order to develop construction procedures, the building construction data of the existing half-slab method was analyzed. Analyzing design drawings and specifications of nine construction cases, a prototype of half-slab method, was drawn. Applying the core technology of HPC method to the drawn prototype of half-slab method, a prototype of HPC method, was developed. The differences of both methods were 'installing PC column' and 'placing topping concrete'. To analysis the differences of both methods, seven construction cases were analyzed. According to the analysis for HPC method, cases1 and 2 had columns divided for construction shortened about 16% of a construction period. The schedule of column assembly work was analyzed to be shortened much. That is judged to be because the use of a hollow PC column leads to a decrease in the number of columns. In particular, if HPC method is applied to a building construction site using large columns, it is analyzed to shorten a construction period more than the existing Half-slab method.