• Title/Summary/Keyword: 기술사업화 소요 비용

Search Result 33, Processing Time 0.037 seconds

Development of Systematic Process for Estimating Commercialization Duration and Cost of R&D Performance (기술가치 평가를 위한 기술사업화 기간 및 비용 추정체계 개발)

  • Jun, Seoung-Pyo;Choi, Daeheon;Park, Hyun-Woo;Seo, Bong-Goon;Park, Do-Hyung
    • Journal of Intelligence and Information Systems
    • /
    • v.23 no.2
    • /
    • pp.139-160
    • /
    • 2017
  • Technology commercialization creates effective economic value by linking the company's R & D processes and outputs to the market. This technology commercialization is important in that a company can retain and maintain a sustained competitive advantage. In order for a specific technology to be commercialized, it goes through the stage of technical planning, technology research and development, and commercialization. This process involves a lot of time and money. Therefore, the duration and cost of technology commercialization are important decision information for determining the market entry strategy. In addition, it is more important information for a technology investor to rationally evaluate the technology value. In this way, it is very important to scientifically estimate the duration and cost of the technology commercialization. However, research on technology commercialization is insufficient and related methodology are lacking. In this study, we propose an evaluation model that can estimate the duration and cost of R & D technology commercialization for small and medium-sized enterprises. To accomplish this, this study collected the public data of the National Science & Technology Information Service (NTIS) and the survey data provided by the Small and Medium Business Administration. Also this study will develop the estimation model of commercialization duration and cost of R&D performance on using these data based on the market approach, one of the technology valuation methods. Specifically, this study defined the process of commercialization as consisting of development planning, development progress, and commercialization. We collected the data from the NTIS database and the survey of SMEs technical statistics of the Small and Medium Business Administration. We derived the key variables such as stage-wise R&D costs and duration, the factors of the technology itself, the factors of the technology development, and the environmental factors. At first, given data, we estimates the costs and duration in each technology readiness level (basic research, applied research, development research, prototype production, commercialization), for each industry classification. Then, we developed and verified the research model of each industry classification. The results of this study can be summarized as follows. Firstly, it is reflected in the technology valuation model and can be used to estimate the objective economic value of technology. The duration and the cost from the technology development stage to the commercialization stage is a critical factor that has a great influence on the amount of money to discount the future sales from the technology. The results of this study can contribute to more reliable technology valuation because it estimates the commercialization duration and cost scientifically based on past data. Secondly, we have verified models of various fields such as statistical model and data mining model. The statistical model helps us to find the important factors to estimate the duration and cost of technology Commercialization, and the data mining model gives us the rules or algorithms to be applied to an advanced technology valuation system. Finally, this study reaffirms the importance of commercialization costs and durations, which has not been actively studied in previous studies. The results confirm the significant factors to affect the commercialization costs and duration, furthermore the factors are different depending on industry classification. Practically, the results of this study can be reflected in the technology valuation system, which can be provided by national research institutes and R & D staff to provide sophisticated technology valuation. The relevant logic or algorithm of the research result can be implemented independently so that it can be directly reflected in the system, so researchers can use it practically immediately. In conclusion, the results of this study can be a great contribution not only to the theoretical contributions but also to the practical ones.

실물옵션 기반 기술가치 평가모델 정교화와 변동성 연구

  • Seong, Tae-Eung;Lee, Jong-Taek;Kim, Byeong-Hun;Jeon, Seung-Pyo;Park, Hyeon-U
    • Proceedings of the Korea Technology Innovation Society Conference
    • /
    • 2017.05a
    • /
    • pp.161-174
    • /
    • 2017
  • 최근 들어 기술벤처기업에 대한 투자가 증가하고, 이를 위한 기술신용평가의 역할이 증대하였다. 그러나 금융권에서 바라보는 기술신용평가의 경우, 해당 기업의 신용등급이나 기술(력) 등급평가에 초점을 두어, 대상기술의 사업화 및 수익성 관점을 체계적으로 반영하지 못하는 한계를 지닌다. 따라서, 벤처캐피털(VC)이나 엔젤투자자를 비롯한 금융권에서 대상기술의 수익성 정보를 참조하거나 기술벤처기업 설립시 기술지분을 참고하는 등, 기존 기술이전거래 협상참조용이나 담보 보증용에 널리 이용되던 기술가치평가의 활용범위가 급격히 확대되고 있다. 제조 서비스 분야의 일반 기술 뿐만이 아니라, 바이오 제약 의료 분야 기술에서도 미래 투입되어야 하는 사업화 소요기간 및 비용을 고려하여 기술가치를 산정해야 할 때가 있다. 기존의 현금흐름할인법(DCF법)이 연속된 투자에 대한 고려를 못하거나 기술적용 제품의 상용화 투입비용에 대한 확률적인 속성을 반영하지 못하는 등 한계점을 지니고 있다. 그러나 기술과 투자의 가치는 기회가치로 보고 자원배분을 위한 의사결정 정보를 감안해야 하므로, 실물옵션의 개념을 적용하는 것이 바람직하다고 여겨진다. 흔히 기업가치를 평가할 때 주가의 변동성(volatility) 개념을 도입하여 전일종가 대비 익일시가의 분산값을 활용하기도 한다. 이러한 개념을 기술가치평가에 적용하기 위해서는 '주가의 연속성(상대적 미세한 변화)' 및 '양(+)의 조건'을 고려해야 하는데, 실제 기술가치평가 상의 현금흐름은 사업초기년도 음(-)의 값이 나타나거나 2~3년 내외의 짧은 수익예상기간 하에서는 주가와 같은 변동성을 도출하는데 무리가 있다. 따라서 많은 문헌에서 연구된 바와 같이, 실물옵션 기반의 기술가치 산정을 위한 블랙-숄즈 모형에서 변동성과 기초자산가치, 그리고 사업화비용 간의 관계를 살펴볼 필요가 있다. 아울러 옵션가격결정모형(Option Pricing Model)에서 불확실성을 반영한 기초자산의 현재가치와 사업화비용의 현재가치분이 특정 임계조건 하에서 '옵션행사 포기(NAT; no action taken)' 영역으로 구분되는 지를 수학적으로 도출하고 관찰변수(입력값)에 따른 옵션가치 산출표를 개발하여 제시한다.

  • PDF

Design of the intranet data center system using auto-scaling method based on virtualization environment (오토스케일링 방법을 적용한 가상화 기반 인트라넷 데이터센터 설계)

  • Keum, Nam-Ho
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2016.04a
    • /
    • pp.38-41
    • /
    • 2016
  • 최근 IT기술 및 웹기술의 발달로 웹서비스 소요의 폭발적인 증가는 신규 사업 및 사업 확장에 초기 투자비용 증가를 가지고 왔다. 이에 가상화 기술을 바탕으로 초기 투자비용 없이 사용한 만큼만 인프라를 빌려오는 AWS같은 IaaS가 제안되었지만 이는 인터넷이 연결되지 않은 인트라넷이나 이미 구축되어 있는 기존자원 활용이 불가능하다는 점, 그리고 사용량을 미리, 정확하게 예측해야 예산낭비를 줄일 수 있다는 점에서 제한사항이 있다. 본 논문에서는 인터넷이 연결되어 있지 않은 인트라넷에서 기존의 장비들을 모아 가상화 데이터 센터를 구축을 제안 및 오토 스케일링 기법을 적용한 데이터센터 운용 방안을 제시함으로 써 현재 자원의 효율 극대화 방안에 대해 논의한다.

전성기를 맞는 F-5 성능개량사업

  • Lee, Hui-U
    • Defense and Technology
    • /
    • no.8 s.174
    • /
    • pp.44-51
    • /
    • 1993
  • F-5 성능개량의 근본적인 배경은 경제성입니다. F-16 한대 도입할 가격이면 대략 10대의 F-5 성능개량이 가능하므로 비용 대 효과 측면에서 많은 국가들이 매력을 느끼고 있습니다 또한 선도 훈련기로서의 필요성이 전투기.성능이 급격히 높아짐에 따라, 성능개량되는 F-5 수준의 항공기로 예비훈련을 함으로써, 고성능 전투기의 비전력화 훈련소요를 상당부분 대체할수 있습니다

  • PDF

치면열구전색술(치아홈메우기) 건강보험 급여기준 개발

  • Lee, Sang-Ho;Lee, Gwang-Hui;Jang, Gi-Taek
    • Journal of the korean academy of Pediatric Dentistry
    • /
    • v.36 no.4
    • /
    • pp.654-666
    • /
    • 2009
  • 우식활성이 높은 어린이와 청소년 전체를 수용할 수 있는 치면열구전색(치아홈메우기) 사업의 확대 재생산을 위한 방안으로 건강보험 급여에 포함하는 정책이 2009년 12월부터 실시됨에 따라 본 연구는 급여화 기준 설정, 상대가치지수 개발 및 수가산정, 소요 재정추계 등, 급여화 운용을 위한 제반사항을 연구, 개발하는데 그 목적이 있다. 본 연구에서는 치면열구전색술의 적응증, 실시연령, 대상치아등에 대해 문헌고찰과 함께 상기 항목에 대한 정책적인 면에서의 검토를 시행하였으며, 치과의사를 대상으로 전국규모의 설문조사를 실시하여 치면열구전색술의 상대가치지수(RBRVS)와 연계한 의사업무량을 산출하고, 행위 기술서를 작성하였으며, 직접 및 간접비용의 세부내역 산출하였다. 도출된 상대가치지수를 바탕으로 예상수가를 산정하였으며 이를 근거로 대상 연령 및 대상치아, 의료 이용율 대비 재정추계 시행하였다. 이와함께 치면열구전색술의 급여화 순조로운 정착을 위한 외국사례 연구, 보험적용추진을 위해 치면열구전색의 유지율 및 비용효과, 예방적 레진수복과의 차등화문제, 재료적 고찰, 대국민 및 시술기관 대상 홍보 사항 등 급여화에 관련된 제반 사항을 검토, 제안하였다.

  • PDF

The Study on the Elaboration of Technology Valuation Model and the Adequacy of Volatility based on Real Options (실물옵션 기반 기술가치 평가모델 정교화와 변동성 유효구간에 관한 연구)

  • Sung, Tae-Eung;Lee, Jongtaik;Kim, Byunghoon;Jun, Seung-Pyo;Park, Hyun-Woo
    • Journal of Korea Technology Innovation Society
    • /
    • v.20 no.3
    • /
    • pp.732-753
    • /
    • 2017
  • Recently, when evaluating the technology values in the fields of biotechnology, pharmaceuticals and medicine, we have needed more to estimate those values in consideration of the period and cost for the commercialization to be put into in future. The existing discounted cash flow (DCF) method has limitations in that it can not consider consecutive investment or does not reflect the probabilistic property of commercialized input cost of technology-applied products. However, since the value of technology and investment should be considered as opportunity value and the information of decision-making for resource allocation should be taken into account, it is regarded desirable to apply the concept of real options, and in order to reflect the characteristics of business model for the target technology into the concept of volatility in terms of stock price which we usually apply to in evaluation of a firm's value, we need to consider 'the continuity of stock price (relatively minor change)' and 'positive condition'. Thus, as discussed in a lot of literature, it is necessary to investigate the relationship among volatility, underlying asset values, and cost of commercialization in the Black-Scholes model for estimating the technology value based on real options. This study is expected to provide more elaborated real options model, by mathematically deriving whether the ratio of the present value of the underlying asset to the present value of the commercialization cost, which reflects the uncertainty in the option pricing model (OPM), is divided into the "no action taken" (NAT) area under certain threshold conditions or not, and also presenting the estimation logic for option values according to the observation variables (or input values).

Development of Intelligent Planning and Analysis Method for Railroad Alignment Improvement (지능형 철도 선형개량 계획 및 분석 기술 개발)

  • Kim, Jeong Hyun;Lee, Jun;Oh, Jitaek;Lim, Joonbum
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.43 no.5
    • /
    • pp.651-657
    • /
    • 2023
  • Railroad alignment improvements and operating speed increase occupy considerable portion in recent railroad market. Developing countries have limitations to construction of new high speed railroads due to the burden of budgets and the lack of demands, and the projects of operating speed increase arepracticallyrecommended. Thisstudy developed the methodologyto provide the railroad alignment design alternatives and the costs by upgrading the "Intelligent Railroad Alignment Design Program (ei-Rail)" which has been used to obtain the alignment plans and construction costs for railroad construction projects. The program provides the cost for alignment improvement, design drafts and the effects of operating speed increase with the input of target improvement speed and the prevailing railroad alignment on the numerical map. It is then expected for the ei-Rail program to be used for the supporting tool for the railroad alignment improvement projects.

Watershed priority evaluation for water circulation management (물순환 관리를 위한 소권역 우선순위평가)

  • Kim, Seokhyeon;Kim, Sinae;Gwak, Jihye;Lee, Hyunji;Kim, Hakkwan;Kang, Moon-Seong
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.499-499
    • /
    • 2022
  • 급격한 도시화와 이로인한 불투수면의 증가는 유역의 물순환을 왜곡시키고 있다. 직접유출의 증가와 침투량 감소로 이어지며 이는 지하수 함유량의 감소와 하천건천화를 유발한다. 환경부는 더 이상의 물순환 왜곡을 막기위해 물환경보전법상의 물순환율을 정의하고 물순환 관리목표를 설정하였으며, 제3차 강우유출 비점오염원관리 종합대책에서 물순환 사업 추진을 위한 소권역 별 우선순위산정을 과제로써 제시하고 있다. 대표적인 물순환 사업은 저영향개발기법 설치이다. 저영향 개발기법은 토지 및 공간을 이용해야하기 때문에 설치비용이 높고 위치선정에 제약이 많으며 유지관리도 어렵다. 이에 물순환 사업에는 단순 불투수면 뿐만아니라 사회, 경제적 요소까지 고려하여야한다. 본 연구에서는 물순환 우선순위를 산정하기위해 불투수면뿐만 아니라 사회, 경제적 요소까지 고려한 종합적인 우선순위를 산정하였다. 유역 물순환 평가를 위해 PSR framework을 이용하였다. PSR framework는 OECD가 개발한 지속가능성 평가 개념이며, Pressure, State, Response 세 가지 요소로 구분해 평가하게된다. PSR framework의 기본 개념은 인간의 활동들이 환경에 압력 (P)를 주고, 이로 인해 자연의 질과 영향 (S)을 미치며, 이에대한 회복을 위해 인식과 행동을 통해 정책과 제도 등을 통해 반응 (R)한다는 것이다. 본 연구에서는 PSR framework의 평가요소 Pressure는 불투수면 및 강우, State는 물순환, 하수관거, 수질, 수생태계, Response는 협력, 인식, 재정, 토지로 구분하여 평가하였다. 최종적으로 불투수면적 감축 대상 소권역('30년 무대책 불투수면적률 25% 이상)소권역에 대하여 최종우선순위를 산정하였다.

  • PDF

Estimation of Production and Operation Cost of KSLV-II using TRANSCOST (TRANSCOST를 이용한 한국형발사체의 생산 및 운용 비용 추정)

  • Yoo, Dong-Seo;Kim, Hong-Rae;Choi, Jong-Kwon;Chang, Young-Keun
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.39 no.6
    • /
    • pp.567-575
    • /
    • 2011
  • The development of space launch vehicle is an important step to advance to developed countries in the space area. It is also so risky due to necessity of huge costs and longer development period. The accuracy of cost estimation is important to develop a space launch vehicle successfully and efficiently. It is also necessary to estimate production and operation cost in order to develop commercial space launch vehicle possessing competitiveness. In this paper, Korean factors to be able to reflect the current state of workforce, average working hours and technology readiness level in Korea were analyzed to estimate production and operation cost of space launch vehicles that are developed in Korea. Korean factors have been applied to production and operation cost estimation of KSLV-II based on TRANSCOST. We evaluated the competitiveness level of KSLV-II as the commercial launch vehicle in the commercial launch services market by comparing with cost per flight of foreign launch vehicles.

A Study on the Necessity of Verification about depot level maintenance plan through the Weapons System cases analysis (무기체계 사례 분석을 통한 창정비개발계획안 검증 필요성 연구)

  • Ahn, Jung-Jun;Kim, Su-Dong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.2
    • /
    • pp.76-82
    • /
    • 2019
  • This study has done to search for a solution to remove risk limitedly caused by separating weapon system acquisition from operation and maintenance at the view point of Logistic Commander who's responsible for stable operation and maintenance after acquiring weapon system. At the System development stage, unverified overhaul development plan may cause additional manpower and costs after the development, and furthermore it is likely to have risk to lower reliability of the military. Thus, research and development agency should write overhaul development plan at the System development stage, and it should be verified through evaluation and verification test. Secondly, during research and development, institutional supplementation is needed to calculate human and material resources writing overhaul development plan. Thirdly, it should be able to analyze proper operation & maintenance plan and cost for overhaul plan at the pre-investigation stage. Fourthly, the base which can develop overhaul concept and overhaul factors should be included in the need and need determination document. Lastly, for the weapon system which has small amount of high power figure, project management should be performed to be able to specify at the each acquisition level of weapon system to realize Article 28, clause 3 and 4 of Defense business law.