A Study on Simplified Payment Method by Progress Measurement for Specified Activity - Focusing on Construction of Eco-River (대표공종의 선정을 통한 약식 기성 산정 방법에 관한 연구 - 자연형 하천공사를 중심으로)

  • Lee, Jeong-Yoon;Woo, Sung-Kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.160-169
    • /
    • 2010
  • In domestic public works, there are several problems in the measurement of payments based on the bill of quantity, which doesn't match with the activity progress rate, heavy paper works and complicated procedures. It can be classified formal and simplified method. By using the simplified method, it can be solved many problems by summarizing the procedure, but is not generally used. This paper proposes a payment method by progress measurement for specified activity based on WBS(Work Breakdown Structure) verifying efficiency which reduced cost account and advanced work on payment compare to method of domestic public works using the data about construction of eco-river. This method will be an important contribution on being a base for cost-schedule integrated management which were verified and also improving efficiency on measuring payment.

New Construction Accident Index Based on Number of Accident and Progress Payments (건설기성과 재해자수에 기반한 건설재해지표 산정방식)

  • Yi, Kyoo-Jin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.3
    • /
    • pp.293-303
    • /
    • 2022
  • In construction work, it can be difficult to know the exact number of full-time workers, so the accident rate is calculated using the approximate number of full-time workers. In addition, as the accident rate calculation is performed based on the assumption that the number of accidents is proportional to the approximate number of workers, the reliability of the calculation result may be questionable. This study proposed a new indicator for accident level based on the progress payment and the number of injuries. The accident-progress ratio, which can be calculated by simply dividing the number of injuries by progress payment, can replace the existing accident rate index or be used as an auxiliary indicator of the accident level. The correlation coefficient between the number of injuries and the progress payment was higher than that between the number of injuries and the number of construction workers. In addition, over the past 10 years, the accident rate has been increasing, whereas the accident-progress ratio has showed a decreasing tendency. This might leave room for different interpretations of the annual variation in the accident level in the construction industry.

A Study on the Process Improvement of Budgeted Cost of Earned Value Management in Multiple Apartment Project (공정-공사비 통합 프로세스 개선을 통한 대단지 아파트 건설공사의 계획기성 산출 및 관리)

  • Yang Yong-Cheol;Kim Sang-Hee;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.123-136
    • /
    • 2003
  • In multiple apartment construction project, BCWS is a critical management factor and has a great influence on the success of the project. Due to the many apartment buildings & facilities which produce numerous activities, there are several problems in making out a time schedule of work as well as production and management of precise BCWS from the allocation of resources. In this study, actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of BCWS through the analysis of the problems and standard schedule & progress curves.

A Study on the Actual Condition and Development of BCWS Management In Large Apartment Complex Project (대단지 아파트 건설공사의 계획기성 관리실태에 관한 연구)

  • Kim Sang-Hee;Yang Yong-Cheol;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.434-437
    • /
    • 2003
  • In apartment project, BCWS is a critical management factor and has a great influence on the success of the project. But due to the characteristics of large apartment complex, there are several problems in making out a time schedule of work as well as production and management of precise bcws from the allocation of resources. In this study, Actual condition survey was executed in terms of the calculation and the management of BCWS. This study propose better solutions for efficient calculation of bcsw through the analysis of the problems and the origins relating to BCWS from a field area.

  • PDF

A Study on the Need for Separation of Software Completeness Appraisal and Software Ready-made Appraisal (소프트웨어 완성도 감정과 기성고 감정 분리 필요성에 대한 고찰)

  • Kim, DoWan
    • Journal of Software Assessment and Valuation
    • /
    • v.17 no.2
    • /
    • pp.11-17
    • /
    • 2021
  • In this study, problems of software completeness appraisal are pointed out and their solutions are presented by analyzing appraisal cases and judicial precedents. Completeness appraisal, ready-made appraisal, defect appraisal, and cost appraisal have been classified as and have been evaluated with extant software completeness appraisals. From a legal point of view, and in judicial precedents, however, there is a big difference between the definition of completeness and the completion rate. This is because the degree of completeness is evaluated under the premise that the software's development is complete, whereas the ready-made appraisal inspects the development progress of unfinished software. Often, in cases involving software completion rate, the total completion level is calculated by weighting each step of the software development process. However, completeness evaluations use the software's realization-operation as its sole criterion. In addition, another issue not addressed in existing software completeness appraisal cases is that there is no mention of who is responsible for software defects, whereas in case law, the responsible party is determined by finding who caused the dispute. In this paper, we systematically classify these problems, and present a novel evaluation method that separates software completeness evaluations from software completion evaluations.

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

Evaluation of L-THIA Direct Runoff Estimation Effect with Slope-based Curve Number Calibration (경사도에 따른 CN보정으로 L-THIA 직접유출 모의 영향 평가)

  • Kim, Jong-Gun;Lim, Kyoung-Jae;Park, Youn-Shik;Heo, Sung-Gu;Park, Joon-Ho;Ahn, Jae-Hun;Kim, Ki-Sung;Choi, Joong-Dae
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.1558-1562
    • /
    • 2007
  • 우리나라 지형은 전체의 70%가 산지로 이루어져 있다. 특히 강원도 지역과 같이 산지가 대부분인 지역에서는 경사도에 따라 강우에 의한 유출특성이 크게 달라질 수 있으므로 지형의 경사가 고려된 유출량 산정방식이 필요하다. 현재 유출량 산정 방식에 많이 이용되고 있는 SCS의 CN값은 미국의 중서부 지역과 같이 경사도 5%미만인 지역에서의 유출량 산정에 적합한 유출곡선지수이다. 경사도 5%에서 유출량 산정에 적합한 CN값을 우리나라의 강원도 지형과 같이 복잡하고 경사도가 심한 지역에 적용하기에는 부적합하다. 따라서 본 연구에서는 연구대상지역인 도암댐 유역의 평균 25.8% 경사도를 고려한 직접유출량을 산정하여 기존 평균 경사도 5%일 때의 직접유출량과 비교분석하였다. 본 연구의 비교분석에 있어서 직접유출의 모의가 가능한 Long-Term Hydrologic Impact Assessment (L-THIA) ArcView GIS 모델을 사용하였고 모델의 적용성 평가를 위해 수문분석에 사용되고 있는 WHAT 모듈을 이용하여 분리된 직접유출과 비교하였다. 그 결과 유출량 산정을 위해 CN값 산정시 강원도 지형과 같이 지형이 복잡하고 경사가 심한 지형에 있어서는 유역의 경사도를 고려하여 유출을 모의해야 한다는 것을 알 수 있다.

  • PDF

A study on progress measurement method of a construction project (건설공사의 진도율 산정 방법에 관한 연구)

  • Park se-Jung;Kim Soo-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.450-453
    • /
    • 2003
  • It is very important to examine and compare initial plan with earned value repeatedly in construction. For this purpose, progress measurement, which reflects the actual progress correctly, is required and it is necessary that accurate field data should be offered. To measure the progress, the entire project mutt be divided into unit works that have an accurate scope of work, and required information must be distributed to the all parties. Under the circumstances of domestic construction industry which focus on the specifications, progress measurement needs to reflect the information of schedule as well as cost that includes the quantity of unit work and construction expenses. Therefore this research proposes weighted method of progress measurement based on the information of cost and schedule.

  • PDF

Establishment of Flood Analysis Method for the Inland and River Inundation Analysis (내.외수 침수해석을 위한 홍수해석 기법 확립)

  • Han, Kun-Yeun;Cho, Wan-Hee;Kim, Young-Joo;Ryu, Jong-Hyun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2009.05a
    • /
    • pp.245-249
    • /
    • 2009
  • 전 세계적인 지구 온난화로 인한 이상기후로 최근 10년간의 홍수 피해는 그 강도와 규모면에서 점차 증가하고 있는 실정이다. 1998년과 1999년 그리고 2002년의 전국적인 홍수로 많은 제방과 저수지가 붕괴되어 수많은 가옥과 농경지가 침수되었으며, 2002년 태풍 루사의 영향으로 낙동강 인근 지역과 강릉 지역은 엄청난 피해를 입었다. 본 연구에서는 태풍 루사로 인해 특히 피해가 심했던 지역 중 경북 김천지역에 위치한 감천유역에 대해서 강우관측소 자료를 이용하여 유역 내 홍수량을 산정하였고, 산정된 홍수량을 바탕으로 직지사천 내 하도 모의를 실시함으로써 하천내의 홍수위를 산정하였다. 또한 모의결과는 하천 내 실측홍수위 자료와 비교함으로서 본 연구에서 적용한 홍수해석 기법의 적용성을 입증하였다. 그리고 100년 및 200년 빈도의 확률강우량을 산정하여 빈도별 확률유출량 및 하도내에서의 유량 및 수위를 산정하여 기성제방고와 비교를 실시함으로써 홍수에 취약한 지역을 도출 할 수 있었다. 또한 국내의 홍수예경보체계와 연계하여 선행시간을 확보한 정확도 높은 홍수정보시스템 구축에 크게 기여할 것으로 판단된다.

  • PDF

A Study of the USLE C factor in USLE Equation using UAV (무인항공기를 활용한 C factor 산정방안 연구)

  • Sung, Yunsoo;Lee, Ji Min;Lim, Kyoung Jae;Kim, Ki-Sung;Kim, Jonggun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.278-278
    • /
    • 2017
  • 전 세계적인 기후변화로 인한 기상이변 현상으로 국지성 호우가 빈번하게 발생하는 시점에 강우로 인한 토양유실 문제가 심각하게 대두되고 있다. 또한 급격한 도시, 산업화의 진행으로 인해 강우로 인해 유실되는 토양의 양이 증가하여 생태계에 악영향을 미치고 있다. 따라서 국내에서는 토양유실문데를 해결하기 위해 많은 연구를 진행하고 있다. 토양유실문제를 해결하기 위해서는 토양유실현상의 원인을 파악하기 위한 모니터링 연구를 수행하여 현상을 분석하는 것이 가장 정확한 방법이지만 수반되는 인적, 경제적 한계가 발생하게 된다. 따라서 많은 연구자들은 토양유실량 산정 및 유사거동특성을 계산하는 모형을 활용한 연구가 수행되고 있다. 토양유실량을 산정하는 모형 중 전 세계적으로 가장 많이 사용되는 범용토양유실량산정공식(Universal Soil Loss Equation, USLE)은 5개의 인자를 사용하여 연평균 토양유실량을 산정한다. 국내의 경우 환경부에서 제정한 '표토의 침식 현황 조사에 관한 고시'에 표토침식현황을 조사하는 방법으로 USLE 공식을 사용한다. USLE 모형을 구성하는 인자 중 C facotr는 작물의 생육과정에 따른 변화를 고려하지 않고 작물에 대한 획일적인 값을 제시하고 있어 밭에서 발생되는 정확한 토양유실현황을 예측하는데 한계가 있다, 따라서 본 연구에서는 식생피복변화에 따른 C factor산정방안을 제시하기 위해 비점오염원관리지역으로 지정된 자운지구 내 고랭지밭을 대상으로 실측을 통한 C factor를 제안하였다. 식생피복변화에 따른 C factor를 제안하기 위해 우선적으로 제작되어야 하는 NDVI map을 제작하기 위해 본 연구에서는 무인항공기인 ebee와 Multi-spectral 센서를 사용하여 실측을 진행하여 NDVI map을 제작하였으며, C factor를 제안하기 위해 Jamil A.A.Anache et al의 연구결과에 명시된 C factor 산정식을 적용하여 식생피복 변화에 따른 C factor를 산정하였다. 산정결과, 획일적인 값을 제시하는 기존 C factor와 다르게 식생피복에 따라 변화하는 C factor가 산정되었다. 본 연구를 통해 제안된 무인항공기를 사용한 C factor 산정방안을 통해 정확한 토양유실량을 산정하는데 기여할 것으로 판단된다.