• Title/Summary/Keyword: 굴착 성능

Search Result 151, Processing Time 0.025 seconds

Controlled Low Strength Material for Emergency Restoration Using Bottom Ash and Gypsum (저회와 석고를 활용한 지반함몰 긴급복구용 고유동성 채움재 연구)

  • Lee, So-Yeon;Yoon, Hwan-Hee;Son, Min;Kong, Jin-Young;Jung, Hyuk-Sang
    • Journal of the Korean Geosynthetics Society
    • /
    • v.17 no.2
    • /
    • pp.19-31
    • /
    • 2018
  • Recently the ground subsidence which seriously weakens the safety of cities tends to increase. The purpose of this paper is to develop the materials by using industrial by-products for the application to emergency restoration process in case of ground subsidence. In this paper the laboratory tests including pH test, initial setting test, unconfined compressive strength test, and flow test were performed in order to evaluate the design properties of Controlled Low Strength Material (CLSM). The field test was carried out for evaluating the performance for the early strength of CLSM and the workability for emergency restoration. Test results showed that the strength will be too high to re-excavate the ground when the cement ratio is more than 4%. The optimum mixing ratio appears to be most effective when the mixing ratio of the bottom ash and the gypsum is approximately 50:50 and the cement content is 2%.

A Field Study on the Constructability and Performance Evaluation of Waveform Micropile (현장시험을 통한 파형 마이크로파일의 시공성 및 거동 평가)

  • Jang, Young-Eun;Han, Jin-Tae
    • Journal of the Korean Geotechnical Society
    • /
    • v.32 no.10
    • /
    • pp.67-79
    • /
    • 2016
  • Waveform micropile is an advanced construction method that combined the concept of conventional micropile with jet grouting method. This new form of micropile was developed to improve frictional resistance, which consequently leads to achieving higher bearing capacity and cost efficiency. Two field tests were conducted to examine the field applicability as well as to verify the effects of bearing capacity enhancement. In particular, waveform micropile construction using jet grouting method was performed to evaluate the viability of waveform micropile installation. After testing, the surrounding ground was excavated to check the accomplishment on the shape of waveform micropile. The result showed that waveform micropile can be installed by adjusting the grouting time and pressure. In the loading tests, waveform micropile's bearing capacity increased by 1.4 to 2.3 times depending on their shapes when compared with conventional micropile. Overall results clearly demonstrated that waveform micropile is an enhanced construction method that can improve bearing capacity.

A Study on the Technological Improvement of Strut as a Permanent Structure (구조물 겸용 흙막이 스트러트 공법의 개선 연구)

  • Kim, Sun-Kuk;Hong, Won-Kee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.5
    • /
    • pp.186-193
    • /
    • 2008
  • The SPS, Strut as a Permanent System, method is widely adopted for the main structural member in addition to temporary strut function for the shuttering of excavation work. Although the SPS method has contributed to cost saving, time reduction, enhancement of structural stability, improvement of construction environment and so on at the building construction site, it caused the problems of increase of basement height and additional work for fire protection of steel structure. The increase of basement height caused the increase of shuttering depth and excavation, and the fire protection caused the additional cost as well as the deterioration of construction environment. In order to improve the problems, this paper is to propose a modularized hybrid structural system(HSD). The detail of the system is introduced and the structural performance and constructibility are proved through the experiment and site application.

Development of the Automated Vertical Controllable Pilot-type Equipment for Improving Construction Performance of PHC Piles (PHC 파일 시공성능향상을 위한 연직 자동제어 파일롯타입의 개발)

  • Cho Chang-Yeon;Lee Junbok;Kim Han-Soo;Kim Jeoung-Tae;Cho Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.72-80
    • /
    • 2004
  • The objective of the research is to develop the automated vertical controllable pilot-type equipment for PHC piles. The motivation for the research is that inherent problems related to vertical control during pile driving. The paper explains the current vertical control methods and problems, design and manufacturing of the pilot-type automated equipment and its testing and discussions of the results.

A Development of the Automated Vertical Controllable Device for Improving Construction Performance of Pile Driver (파일드라이버 기계 시공성능 향상을 위한 연직 자동제어기의 개발)

  • Cho, Chang-Yeon;Lee, Jun-Bok;Son, Jae-Ho;Kim, Han-Soo;Cho, Moon-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.4 s.32
    • /
    • pp.78-90
    • /
    • 2006
  • There is no specific code and/or standard described in the specifications to check verticality for Pre-tensioned Spun High Strength Concrete pile installation process. The most commonly used method for the vertical PHC pile installation is a naked-eye measurement or water level measurement conducted by assistant crew in the construction sites. The main objective of the research is to develop the automated vertical controllable prototype equipment for PHC piles in order to achieve uniform construction qualify as well as improving safety and productivity. The paper explains the literature review on PHC pile and pile installation process, development of prototype, field test of the prototype and its performance evaluation in terms of quality and safety as well as productivity. The results of the research will lead the further researches on the automated pile installation system.

Study on key safety hazards and risk assessments for small section utility tunnel in urban areas (도심지 소단면 터널식 공동구의 핵심 안전 위험요소 및 위험성 평가 연구)

  • Seong, Joo-Hyun;Jung, Min-Hyung
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.931-946
    • /
    • 2018
  • In line with the increased usability of utility pipe conduits in urban areas, construction and R&D activities of utility tunnel, incorporated with the shield TBM method, are actively under way. The utility tunnels are installed through underground excavation, and thus are relatively weak in terms of construction safety. However, hazards associated with the utility tunnel construction have not been properly identified, despite the introduction of a policy to the 'Design for Safety' for the purpose of reducing accident rates in the construction industry. Therefore, in this study, following the derivation of hazards associated with utility tunnel, these hazards were then used as the basis to uncover key safety hazards requiring extensive management in a field, which were then used to conduct a risk assessment having applied the matrix method so that the results can be utilized in risk assessment during the stages of utility tunnel planning, design, and construction, while also serving as a data reference.

Waterproofing performance evaluation according to each waterproofing material due to segment construction error (세그먼트 시공오차에 따른 이음부 지수재별 방수성능 평가)

  • Heo, Seung-Mu;Jung, Hoon;Lee, Seok-Won
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.20 no.6
    • /
    • pp.1023-1037
    • /
    • 2018
  • The interest in the use of shield TBM (Tunnel Boring Machine) on the tunnel excavation has been increased rapidly in Korea. The shield TBM tunnel is generally designed as non-drainage tunnel. Consequently, if water leakage through the segment joints happens, big problems on the usage and stability of tunnel can be occurred. In this study, the variation of waterproof capacity of hydrophilic rubber waterstop and gasket, respectively by the construction error and excessive displacement of segment was studied. The test results show that hydrophilic rubber waterstop has favorable on the offset, however unfavorable on the gap. On the other hand, gasket has unfavorable on the offset, however favorable on the gap.

Application of Laboratory Pressurized Vane Shear Test and Discrete Element Method for Determination of Foam-conditioned Soil Properties (폼제에 의해 개선된 흙의 물성 도출을 위한 실내 가압 베인 전단시험 및 개별요소법의 적용)

  • Kang, Tae-Ho;Lee, Hyobum;Choi, Hangseok;Choi, Soon-Wook;Chang, Soo-Ho;Lee, Chulho
    • Journal of the Korean Geosynthetics Society
    • /
    • v.19 no.4
    • /
    • pp.65-74
    • /
    • 2020
  • In earth pressure balance (EPB) shield TBM tunnelling, the application of soil conditioning which improves properties of the excavated muck by additives injection, is generally used for enhancing the performance of TBM. Therefore it is important to apply the soil conditioning in the numerical model which simulates excavation performance of TBM equipment, but related studies on a method that simulates soil conditioning are insufficient to date. Accordingly, in this study, an laboratory pressurized vane test apparatus was devised to evaluate the characteristics of conditioned soil. Using the apparatus, the vane shear tests were performed on foam-conditioned soil with different shear rates, and the test was numerically simulated with discrete element method (DEM). Finally, the contact properties of particles in DEM were determined by comparing the results of test and analysis, and it indicates that the applicability of pressurized vane test and DEM model for reproducing soil conditioning in TBM excavation model with DEM.

Analysis of the Impact on Prediction Models Based on Data Scaling and Data Splitting Methods - For Retaining Walls with Ground Anchors Installed (데이터 스케일링과 분할 방식에 따른 예측모델의 영향 분석 - 그라운드 앵커가 설치된 흙막이 벽체 대상)

  • Jun Woo Shin;Heui Soo Han
    • The Journal of Engineering Geology
    • /
    • v.33 no.4
    • /
    • pp.639-655
    • /
    • 2023
  • Recently, there has been a growing demand for underground space, leading to the utilization of earth retaining walls for deep excavations. Earth retaining walls are structures that are susceptible to displacement, and their measurement and management are carried out in accordance with the standards established by the Ministry of Land, Infrastructure, and Transport. However, managing displacement through measurement can be considered similar to post-processing. Therefore, in this study, we not only predicted the horizontal displacement of a retaining wall with ground anchors installed using machine learning, but also analyzed the impact of the prediction model based on data scaling and data splitting methods while learning measurement data using machine learning. Custom splitting was the most suitable method for learning and outputting measurement data. Data scaling demonstrated excellent performance, with an error within 1 and an R-squared value of 0.77 when the anchor tensile force and water pressure were standardized. Additionally, it predicted a negative displacement compared to a model that without scaling.

Study on EPB TBM performance by conducting lab-scaled excavation tests with different foam injection for artificial sand (실내 굴진 시험을 통한 폼 주입 조건에 따른 인공 사질토 지반에서 EPB TBM 굴진성능에 대한 고찰)

  • Lee, Hyobum;Shin, Dahan;Kim, Dae-Young;Shin, Young Jin;Choi, Hangseok
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.21 no.4
    • /
    • pp.545-560
    • /
    • 2019
  • During EPB TBM tunnelling, an appropriate application of additives such as foam and polymer is an essential factor to secure the stability of TBM as well as tunnelling performance. From the '90s, there have been many studies on the optimal injection of additives worldwidely contrary to the domestic situation. Therefore, in this paper, the foam, which is widely adopted for soil conditioning, was selected as an additive in order to investigate the effect of foam injection on TBM performance through a series of laboratory excavation tests. The excavation experiments were carried out on artificial sandy soil specimens with consideration of the variance of FIR (Foam Injection Ratio), FER (Foam Expansion Ratio) and $C_f$ (Surfactant Concentration), which indicate the amount and quality of the foam. During the tests, torque values were measured, and the workability of conditioned soil was evaluated by comparing the slump values of muck after each experiment. In addition, a weight loss of the replaceable aluminum cutter bits installed on the blade was measured to estimate the degree of abrasion. Finally, the foam injection ratio for the optimal TBM excavation for the typical soil specimen was determined by comparing the measured torque, slump value and abrasion. Note that the foam injection conditions satisfying the appropriate level of machine load, mechanical wear and workability are essential in the EPB TBM operational design.