• Title/Summary/Keyword: 교량관리체계

Search Result 110, Processing Time 0.027 seconds

Database Construction Plan of Infrastructure Safety Inspection and In-depth Inspection Results (사회기반 시설물의 안전점검 및 정밀안전진단결과 DB 구축방안 연구)

  • Ryu, Jong Mo;Shin, Eun Chul
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.4
    • /
    • pp.133-141
    • /
    • 2014
  • This study was carried out to establish the database system by using the safety inspection and in-depth inspection results for infrastructures such as bridges, tunnels, dams, and water supplies. A classification system of each facility was proposed by standardizing items for inspection & diagnosis in order to automatize work process. Also, it justifies data structure based on database from pre-investigation to field survey, evaluation of facilities, and report making. In addition to this, it suggests improvement plans of relative regulations and guidelines such as Facility Management System(FMS), operational regulation, and inspection detailed guideline to make inspection result database of infrastructures which can be used effectively.

POC : Establishing Dataset for Artificial Intelligence-based Crack Detection (POC : 인공지능 기반 균열 탐지를 위한 데이터셋 구축)

  • Kim, Ji-Ho;Kim, Gyeong-Yeong;Kim, Dong-Ju
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2022.07a
    • /
    • pp.45-48
    • /
    • 2022
  • 건축물 안전 점검은 대부분 전문가의 현장 방문을 통한 육안검사다. 그중 균열 검사는 건물 위험도를 나타내는 중요한 지표로써 발생 위치, 진행성, 크기를 조사하는데, 최근 균열 조사 방식에 대해 객관성과 체계성을 보완할 딥러닝 개발이 활발하다. 그러나 균열 이미지는 외부 현장에 모양, 규모도 많은 종류라 도메인이 다양해야 하는데 대부분 제한된 환경과 실제적인 균열 검사와는 무관한 데이터로 구성되어 실효적이지 않다. 본 연구에서는 균열 조사에 적합하고 Wild 환경에 적용 가능한 POC 데이터셋을 소개한다. 기존 균열 공인 데이터셋 4종의 특징과 한계점을 분석을 토대로 고해상도 이미지로써 균열의 세부 특징을 담았고 균열 유사 환경과 조건들을 추가 촬영해 균열 검출에 강인하게 학습되도록 지향하였다. 정제 및 라벨링 작업을 거친 POC 데이터 셋은 균열 검출모델인 YOLO-v5으로 성능을 실험하였고, mAP(mean Average Precision) 75.5%로 높은 검출률을 보였다. POC 데이터셋으로 더욱 도메인에 적응적(Domain-adapted)인 인공지능 모델을 개발하여 건물, 댐, 교량 등 각종 대형 건축물에 대한 안전하고 효과적인 안전 관리 도구로써 활용할 것을 기대한다.

  • PDF

The Analysis of the Important Problems on Designing and Constructing Earth Retaining Structures (지반굴착 흙막이 구조물 설계 및 시공시 중요문제점 분석)

  • Lee, Song;Kim, Ju-Hyun
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.6 no.2
    • /
    • pp.167-174
    • /
    • 2002
  • Earth retaining structure is constructed structure in order to construct a multistoried building, the subway, a subterranean downtown for effective use and obtainments of the limited ground. Recently, many kinds of research have been actively developed for a standardization and a database on designing and constructing of bridge, tunnel, road. With the works of database construction of that, many kinds of data with respect to statistics is cumulated. However, Database work of designed and constructed earth retaining structure in the construction field is wholly lacking and lagged behind in the works of database construction. This paper suggested classification system on indication data in connection with designing and constructing earth retaining structures a hundred fields. On the basis of that, code work with classification system was practised and DB program of indication data in connection with designing and constructing earth retaining structures was developed.

Static Aanlysis of Curved box Girder Bridge with Variable Cross Section by Transfer Matrix Method (전달행렬법에 의한 변단면 곡선 상자형 거더교의 정적해석)

  • Kim, Yong-Hee;Lee, Yoon-Young
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.7 no.4
    • /
    • pp.109-120
    • /
    • 2003
  • The state-of-art of curved box girder bridge with cross section design has advanced in various area. In these days, several analytical techniques for behaviors of curved box girder bridges cross section are available to engineers. The transfer matrix method is extensively used for the structural analysis because its merit in the theoretical background and applicability. The technique is attractive for implementation on a numerical solution by means of a computer program coded in Fortran language with a few elements. To demonstrate this fact, it gives good results which compare well with finite element method. Therefore, this paper proposed the static analysis method of curved box bridge with cross section by transfer matrix method based on pure-torsional theory and the optimal span ratio/variable cross section ratio of 3 span continuous curved box girder bridge.

A Study on The Implementation of Ubiquitous-Police Service - focusing the perception of police and citizen - (유비쿼터스 경찰서비스 구현방안에 관한 연구 - 경찰공무원과 시민인식을 중심으로 -)

  • Park, Seong-Su
    • The Journal of the Korea Contents Association
    • /
    • v.9 no.6
    • /
    • pp.325-335
    • /
    • 2009
  • The effects of the U-Police Service is expected to go much beyond present police service. Scientific police service using the UIT will enable the police to confront rapidly to the crimes which has been in the blind spot of law enforcement in the result of insufficient police forces and maintenance of law and order by putting police manpower first. Cetizens' feeling of safety from crimes is also expected to be much improved and this will bring about noticeabe effect on crime prevention by suppressing the crime impulse in advance. This thesis have come up with various research results by interviewing police officers and citizen of the City of Seoul under the circumstances that there has been no positive and analytical studies on the areas that the UIT could apply to or the possibility of utilizing the UIT. As we apply the UIT to the police service, how we solve the problem occurring by adopting the UIT and how much we can protect private information is much more important than what kind of service we can provide. Especially, embodiment of U-Police service is a necessary precondition for constructing ubiquitous city in near future. Following studies to draw relevant research results by expanding the objects of the study are much needed including the study on the measurement of efficiency of U-Police service in each service sectors which the UIT applies to.

Application of Linear Schedule Chart for Schedule Management of Linear Construction Project (선형시설물 공정관리 활용을 위한 선형공정표 활용 시스템 구축 방안)

  • Lee, Jaehee;Kang, Hyojeong;Kang, Leenseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.24 no.2
    • /
    • pp.13-23
    • /
    • 2023
  • Unlike building construction projects, where the activity is repeatedly carried out in a limited area, civil engineering projects such as roads and railroads are carried out in a linear type in a horizontal working space over several tens of kilometers. Each activity is managed with a station number that has a unit of distance from the starting point to the end point. For this reason, since the work location information of the activity is a major management factor, the Gantt chart system that expresses only schedule information may have limitations. In this study, authors propose a method for constructing a linear schedule chart that can simultaneously express schedule information indicating the start and finish dates and location information indicating the start and end positions of each activity, and develop a system for generating a linear schedule chart. In the study, the coordinate axes of the linear schedule chart consisted of distance and date values on the X and Y axes, respectively, and each activity was expressed as a symbol that can infer the type of work to increase the visibility of the linear schedule chart compared to the simple bar chart method. The linear schedule chart generation system was reviewed for practical applicability by utilizing the actual schedule data of bridge structures in a railroad project.

Risk Assessment of the Accident Place Types Considering the Coastal Activity Time (연안활동시간을 고려한 장소유형별 위험도 평가)

  • Seo, Heui Jung;Park, Seon Jung;Park, Seol Hwa;Park, Seung Min
    • Journal of Korean Society of Coastal and Ocean Engineers
    • /
    • v.34 no.5
    • /
    • pp.144-155
    • /
    • 2022
  • The Korea Coast Guard evaluates the risk of major coastal activity places to prevent coastal accidents, and patrols and manages them based on that, but it is not responding properly to the continuously increasing number of coastal accidents. The reason for this is that, despite the gradual expansion of coastal activity places, there is a lack of manpower to manage and supervise them, resulting in blind spots in coastal accident safety management. Therefore, in order to solve this problem, it is necessary to prepare more efficient and effective measures that check and supplement the current coastal safety management system. Coastal accidents show different characteristics of accident causes and places due to differences in the activity characteristics of users according to time. As a result of analyzing coastal accident data (2017~2021), the frequency of daytime accidents is high in the case of sea rock, beach, and offshore, where family leisure activities are frequent. In the case of wharf, tidal flat and bridge, where accidents due to drinking, disorientation, and suicide mainly occur, the frequency of accidents at night is high. In addition, there were more accidents on weekends when the number of users increased compared to weekdays. This trend indicates that the user's temporal activity characteristics must be reflected in the risk assessment of coastal activity places. Therefore, in this study, based on the case of coastal accidents, the characteristics of accidents at coastal activity places according to time were identified, and the criteria were presented for risk evaluation by grading them. It is expected that it will be possible to lay the foundation for reducing coastal accidents by efficiently managing and supervising coastal activity places over time using the presented evaluation criteria.

Life Cycle Cost Analysis at Design Stage of Cable Stayed Bridges based on the Performance Degradation Models (성능저하모델에 기초한 사장교의 설계단계 생애주기비용 분석)

  • Koo, Bon Sung;Han, Sang Hoon;Cho, Choong Yuen
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.5
    • /
    • pp.2081-2091
    • /
    • 2013
  • Recently, the demand on the practical application of life-cycle cost effectiveness for design and rehabilitation of civil infrastructure is rapidly growing unprecedently in civil engineering practice. Accordingly, in the 21st century, it is almost obvious that life-cycle cost together with value engineering will become a new paradigm for all engineering decision problems in practice. However, in spite of impressive progress in the researches on the LCC, the most researches have only focused on the Deterministic or Probabilistic LCC analysis approach and general bridge at design stage. Thus, the goal of this study is to develop a practical and realistic methodology for the Life-Cycle Cost LCC-effective optimum decision-making based on reliability analysis of bridges at design stage. The proposed updated methodology is based on the concept of Life Cycle Performance(LCP) which is expressed as the sum of present value of expected direct/indirect maintenance costs with expected optimal maintenance scenario. The updated LCC methodology proposed in this study is applied to the optimum design problem of an actual highway bridge with Cable Stayed Bridges. In conclusion, based on the application of the proposed methods to an actual example bridge, it is demonstrated that a updated methodology for performance-based LCC analysis proposed in this thesis, shown applicably in practice as a efficient, practical, process LCC analysis method at design stage.

A Study on Normal Project Duration for Water Resource Project (수자원시설 건설공사 표준공기 산정을 위한 기초연구)

  • Lee, Bongsu;Kim, Kinam;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.

Development of E-PAD based condition evaluation system for facility safety inspection (시설물 안전점검을 위한 E-PAD 기반 상태평가 시스템 개발)

  • Jung, Hae-Yong;Lee, Heung-Su;Yi, Jong-Hwa;Kim, Young-Seok;Park, Chul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.23 no.4
    • /
    • pp.1-7
    • /
    • 2019
  • As a unify operational processes of the safety inspection for major national facilities, it is expected that the efficiency and professionalism of the project will be enhanced. Also it is being emphasized that the importance of visual inspection that initially find physical and functional defects in facilities. In this study, we developed an E-PAD-based condition evaluation system to check the safety of the facility to overcome the problems and limitations of the existing inspection method. This system consists of introduction, work list, visual inspection, defect table and so on. It is possible to download the inspection drawings at the site and input the damage information to the drawings and check the evaluation grade. In order to verify the E-PAD based condition evaluation system, the inspection data of 10 sample bridges were inputted into the system and the evaluation results were compared. As a result, it was confirmed that the safety grade calculated from the system and the existing safety grade are the same. The feasibility analysis of the AHP method also showed that the function increased by 10%, cost by 36%, and value by 30% compared to the existing method. Therefore, it is expected to contribute to systematic data and information analysis system for improvement of facility management.