• Title/Summary/Keyword: 관리 기간

Search Result 3,970, Processing Time 0.03 seconds

A Shortened Common Criteria Evaluation Schedule using Project Management Techniques (프로젝트 관리 기법을 이용한 CC 평가 기간 단축)

  • Park, Soon-Tai;Lee, Hyung-Hyo;Noh, Bong-Nam
    • Journal of the Korea Institute of Information Security & Cryptology
    • /
    • v.20 no.2
    • /
    • pp.131-144
    • /
    • 2010
  • IT developed countries since the late 1980s are used to develop IT security evaluation criteria to ensure safety and reliability of information protection products. Currently a variety of products used for the evaluation based on CC and it takes a long period of product evaluation is required to reduce the developers and users. In this paper refer to the published standard evaluation schedule for the EAL4 calculation model offers a trial period. In addition, based on this commitment by adjusting the number of evaluaters to evaluate the applicant in the evaluation period to minimize the position offers.

Development of Archery Training Management System for Archer's Performance (양궁 수행력 향상을 위한 훈련관리 시스템 개발)

  • Jang, Young-Sool;Hong, Kil-Dong
    • The Journal of the Korea Contents Association
    • /
    • v.8 no.8
    • /
    • pp.213-222
    • /
    • 2008
  • The goal of this research was to search for an optimum training program that increases archery performance skills in order to develop a performance training and support. For this research, by examining the existing sports statistics program, information management system, and other related documents, we were able to derive an athlete management realm as well as find archer factors. Also through a council we categorized the factors that constituted the training general management. The archery training general management system consists of six realms. First is the log-in and main screen realm. Second is the athlete information category. Third, the point of impact information category. Fourth, the shift-in-frequency analysis realm. Fifth, in the detailed analysis realm. Thus, the developed archery training general management system allows for a more generalized and scientific athlete management and support system. and it has turned out to be an adequate system for archer's performance.

A Study on Analysis and Improvement of Furniture Work for Just-in-Time (적시생산방식을 이용한 가구공사 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Ahn Jae-Bong;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.4 s.20
    • /
    • pp.71-78
    • /
    • 2004
  • In this study, the concept of Just-In-Time, Lean Construction and Supply Chain Management have been applied to furniture works of high-rise residental building. For the purpose of systematic furniture work planning, it should be established to analyse furniture-work process from design phase through contract, and procurement to construction phase. The analysis of process and data for furniture-work provides the roles of conducting subjects and presents management items at each phase. This proposal will provide the systematic furniture-work managements and reduce construction time and cost, and also raise the quality of furniture works.

Service Life Prediction and Cost Estimation of Repaired Concrete Structures Under Marine Environment (염해 환경 하 보수된 콘크리트 구조물의 사용수명 예측 및 보수 비용 평가)

  • Shim, Hyun Bo;Ann, Ki Yong
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.1
    • /
    • pp.226-234
    • /
    • 2011
  • The service life of concrete structures exposed to a marine environment can be extended by controlling the amount of chloride in cover concrete. Patching is one of the appropriate maintenance techniques for chloride contamination. Chloride-contaminated cover concrete is removed and replaced with sound one. It can provide less risk of corrosion of steel, so that the structure can be maintained for required service life. In this study, a quantitative assessment of the service life subjected to the chloride attack is proposed to determine the effective repair options such as repair depth, repair material and timing of repair. The Crank-Nicolson based finite difference formulation from Fick's second law is proposed to predict the profiles of chloride ion in a repaired concrete structure, considering ingress of chloride from outer and redistribution of residual chloride from the substrate concrete. Therefore, the repair application times and maintenance cost for the target service life can be estimated. Finally, the numerical examples are presented to ensure its applicability.

A Study on Weather Information Utilization for The Development of Untact Construction Management (비대면 건설사업관리 웹 개발을 위한 날씨 정보 활용 연구)

  • Kim, Minjin;Kang, Sangchan;Jang, Myunghoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.78-83
    • /
    • 2022
  • Many domestic construction companies are continuously trying to utilize weather information for construction management. The effect of the weather is greatly reflected in the construction industry because there are many outdoor work. Therefore, weather information is clearly needed to predict the exact construction period. And the calculation of the number of non-working days considering the weather information is very important. However, many construction companies have difficulty calculating the exact construction period because it is difficult to predict the exact long-term weather. In this study, it is analyzed the past long-term weather information. Then the weather information by region and season is applied to the construction management system. Finally, it is confirmed the workable date, the field information and the weather information.

A Study on the Growth Models of Sedum takevimense as Affected by Difference of Soil Mixture Ratio in the Green Roof System (토양조성에 따른 옥상녹화용 섬기린초 생장모형 연구)

  • Kang, Tai-Ho;Li, Hong;Zhao, Hong-Xia
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.39 no.6
    • /
    • pp.110-117
    • /
    • 2011
  • In order to study the growth models between the growth of Sedum takevimense and growth rate in soil with three types of mix ratios, this experiment was carried out on April 3rd, 2011. A nonlinearity regression analysis was performed using the Logistic and Gompertz models by SPSS. According to the study of growth models of Sedum takevimense, the process of growth and management methods after over-wintering were explicitly determined. According to the measured values, the growth in the soil of $P_1P_2V_1$ and $P_2P_1V_1$ was better than that of $P_1$. Particularly, the average length of Sedum takevimense in the soil of $P_1P_2V_1$ was about twice as great as that in the $P_1$. The fitness test of the two growth models was: The predicted value and measured value were separately compared and analysed, the average fitting precision $R^2$ of the Logistic models was 0.995, but the average $R^2$ of the Gompertz models was below 0.978, which showed that the Logistic models were better than the Gompertz models. The growth models also showed that the growth time of Sedum takevimense was divided into three: rapid, most rapid and slow. When managed in the rapid and the most rapid time, it will grow better.

A Study on Normal Project Duration for Water Resource Project (수자원시설 건설공사 표준공기 산정을 위한 기초연구)

  • Lee, Bongsu;Kim, Kinam;Lee, Minjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.1
    • /
    • pp.35-43
    • /
    • 2015
  • It is important to have enough design and construction duration for infrastructure projects. However, recent water resource project in Korea shows several problems caused by their fast-tract schedule. National Audit Committee report several water resource projects have quality problems caused by insufficient project duration. Especially, water resource projects such as dam and water pipeline construction should have proper time to secure their structure quality. Normal project duration for these projects should be estimated based on previous similar projects' historical data analysis. However there is no standard model which can estimate normal project duration for water resource projects in Korea. There are several normal project duration estimation models for building project developed by public(LH) and private construction companies. However, there is no proper model for water resource projects. So, this study developed normal project duration model for dam and water pipeline projects using historical data and show application of models.

A Software Estimating Model for Development Period (소프트웨어 개발기간 추정 모델)

  • 이상운
    • Journal of KIISE:Software and Applications
    • /
    • v.31 no.1
    • /
    • pp.20-28
    • /
    • 2004
  • Estimation of software project cost, effort, and duration in the early stage of software development cycle is a difficult and key problem in software engineering. Most of development effort and duration estimation models presented by regression model of simple relation function point vs. effort and effort vs. duration instead of considering developer's productivity. But different project have need for different effort according to developer's productivity if the projects are same software size. Also, different duration takes according to developer's productivity if the projects require the same effort. Therefore, models that take into account of productivity have a limited application in actual development project. This paper presents models that can be estimate the duration according to productivity in order to compensate a shortcoming of the previous models. Propose model that could presume development period by various methods based on productivity and compared models' performance. As a result of performance comparison, an estimating model of development period from software size got simple and most good result. The model gives decision-making information of development duration to project management in the early stage of software life cycle.

Proposal and Application of Water Deficit-Duration-Frequency Curve using Threshold Level Method (임계수준 방법을 이용한 물 부족량-지속기간-빈도 곡선의 제안 및 적용)

  • Sung, Jang Hyun;Chung, Eun-Sung
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.11
    • /
    • pp.997-1005
    • /
    • 2014
  • This study evaluated hydrological drought the using the annual minimum flow and the annual maximum deficit method and proposed the new concept of water deficit-duration-frequency curves similar to rainfall intensity-duration-frequency curves. The analysis results of the annual minimum flow, the return periods of hydrological drought in the most duration of 1989 and 1996yr were the longest. The analysis results of the annual maximum deficit, the return periods of 60-days and 90-day deficit which are relatively short duration were the longest in 1995yr, about 35-year, Hydrological drought lasted longer was in 1995, the return period was about 20-year. Though duration as well as magnitude is a key variable in drought analysis, it was found that the method using the annual minimum flow duration not distinguish duration.

Estimation of optimal dredging timing and period using environmental windows (환경창을 이용한 최적 준설시기 및 기간 산정)

  • Jeong, Anchul;Kim, Seongwon;Moon, Heyjin;Kim, Minseok;Jung, Kwansue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.30-30
    • /
    • 2016
  • 환경창(EWs; Environmental Windows)이란, 준설 및 준설토 처리에 대한 부정적인 영향이 최소가 되는 기간을 정하고, 그 기간에 준설 및 준설토 처리를 수행하게끔 지정된 기간을 의미한다. 1970년대부터 미국을 중심으로 개발되어, 2001년을 기준으로 미국의 모든 준설사업의 약 80% 이상을 관리하고 있다. 준설이 가능하도록 규정된 환경창과 준설이 가능하지 않은 계절적 제한(seasonal restrict)으로 구성되어 있으며, 계절적 제한 기간에 준설을 수행하고자 하는 경우에는 준설과 관련된 의사결정권자, 이해관계자 및 전문가들의 협의가 이루어져야 한다. 그러나 현재 환경창에서 제공하고 있는 정보는 준설 수행의 가능/불가능의 양자택일에 대한 정보만을 제시하고 있으며, 이러한 문제는 의사결정권자 및 이해관계자에게는 정량적인 정보를 주지 못해 의사결정이 어려워지는 단점이 있다. 이러한 단점을 극복하기 위해서 통계학적 기법을 이용하여 사회 환경적인 측면에서 준설의 부정적인 영향을 수치화하여 정량적인 정보를 제공할 수 있도록 환경창 지수를 개발하였다. 환경창 지수를 적용한 환경창의 검증을 위해 미국의 샌프란시스코 만에 적용하였으며, 적용결과와 현재 샌프란시스코 만에서 운영 중인 환경창과 비교 분석을 수행하였다. 본 연구에서 개발된 환경창은 샌프란시스코 만에서 운영하고 있는 환경창과 동일한 환경창 기간을 제공함은 물론, 정량적인 환경창 지수를 제공함으로써 보다 간편한 의사결정이 가능함을 보였다. 또한 낙동강에 위치한 다기능보 중, 강정고령보에 적용하여 환경창을 개발하고 최적 준설시기 및 기간을 산정하였다. 개발된 환경창에 의하면 3월에 환경창 지수가 가장 높은 수치를 보임에 따라 가장 준설의 부정적인 영향이 작은 환경창 기간이라고 할 수 있으며, 가장 부적절한 환경창 기간은 5월인 것으로 나타났다.

  • PDF