• 제목/요약/키워드: 관로공사

검색결과 89건 처리시간 0.025초

Realization of Telephony PCM channel Bank (PCM Channel Bank의 시작연구)

  • An, Su-Gil;Kim, Seok-Gi;Lee, Seong-Hui
    • Journal of the Korean Institute of Telematics and Electronics
    • /
    • 제17권5호
    • /
    • pp.28-35
    • /
    • 1980
  • The ever unsatisfied demand for more channel and bandwidth to the limited installalion of existing communication facilities, and explosively increasing expanses for the cable installation fee force us to revive once patented but unused idea of multlplexign in time, that is, PCM in telephony. The authors designed, artworked and prototyped PCM 24 since 1972 and tested the first PCM chaulel Hank between Noryang Jin and yang see stations to prove that the resust of their PCM 24 Channel Bank implementation is viable and promissing.

  • PDF

An optimum algorithm for the economical construction of underground pipe-lines (지중배전공사의 경제적 시공을 위한 관로배열 최적화 알고리즘)

  • Cho, Seong-Soo;Kim, Jae-Hoon;Lee, Won-Young;Han, Sang-Ok
    • Proceedings of the KIEE Conference
    • /
    • 대한전기학회 2004년도 춘계학술대회 논문집 전기설비전문위원
    • /
    • pp.183-185
    • /
    • 2004
  • Despite high cost, the underground power distribution system has been preferred by utilities and customers due to its stability and good living environment. Utilities, however, are burdened with the cost of installation as the service region of underground power system is getting enlarged. In this paper, a design method is proposed in order to reduce the construction cost of underground distribution system. That is an optimum algorithm, which can increase the total number of pipes in a limited space compared with a conventional design method. As a result, the proposed design method can reduce efficiently the construction cost of underground distribution system.

  • PDF

Current Control Device using TB-Equipped Circuit Equivalent Impedance Estimation and RF Relay (회로 등가임피던스 추정 및 RF 릴레이 장착한 TB를 이용한 방식전류제어장치)

  • Lee, Dong-Jun;Park, Seong-Mi;Park, Sung-Jun
    • Proceedings of the KIPE Conference
    • /
    • 전력전자학회 2019년도 전력전자학술대회
    • /
    • pp.358-359
    • /
    • 2019
  • 철교나 석유비축기지 탱크저판 및 각종 매설관로 등 대부분 철 성분 골조는 시간이 경과하면 주변의 환경에 따라 부식이 급격히 일어난다. 이러한 철강재가 부식되는 철강재가 시설물의 주요 구성물이 되고 있는 시설물의 수명을 크게 단축시키는 주요원인이 되고 있다. 이에 대한 대비책으로 방청도료나 코팅을 이용하는 방법과 달리, 전기적으로 전위차를 같게 하여 부식을 방지하는 전기방식법을 적용함에 있어 방식전류가 불균일한 경우 양극 소모가 불균일함에 따라 교체시기 문제를 극복하기 위해 회로 등가 임피던스 추정 및 RF 릴레이 장착한 TB를 이용한 방식전류제어장치를 개발하였다.

  • PDF

A Study on Improvement of Management Performance Evaluation System for the Local Public Corporations using Cluster Analysis (군집 분석을 이용한 지방상수도 공기업 경영평가체계 개선 방안 연구)

  • Choi, Hanju;Ryu, Sung Soo;Lee, Ho Jin;Ryu, Mun Hyun;Choi, Hyo Yeon
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 한국수자원학회 2018년도 학술발표회
    • /
    • pp.82-82
    • /
    • 2018
  • 지방공기업 경영평가는 지방공기업의 경영성과에 대해서 평가하는 것이므로 경영 성과를 균형있게 평가하는 것이 중요하다. 지방공기업의 평가 대상 유형은 상수도, 하수도, 도시철도공사, 도시개발공사, 특정공사 공단, 시설관리공단, 환경시설관리공단 등 7개로 구분된다. 이 가운데 2017년 상수도 분야의 평가 대상 공기업은 지방공기업법 제78조 및 동법 시행령 제68조에 의거하여 115개이다. 행안부에서 주관하는 8개 광역 직영 기업 그룹과 시 도에서 주관하는 107개 기초지자체 직영 기업 그룹를 구분하여 평가하고 있으며 지방상수도 경영성과 평가 지표은 크게 리더십/전략, 경영시스템, 경영성과, 정책 준수로 구분되며 총 21개의 세부지표로 구성된다. 경영 성과 지표 가운데 주요사업성과와 경영효율성과 지표에 해당하는 상수도관리, 상수도보급률, 요금부과율, 요금 현실화율은 해당 지자체의 인구규모에 따라 평가군을 설정하도록 하고 있다. 그러나 평가군을 설정하는 인구 기준에 대한 명확한 근거가 없고 동일한 평가군 내에서도 지자체 상수도 시설, 면적, 인구 밀도 등에 따라 관로길이나 상수도 원가 등이 크게 차이가 발생하고 있어 경영 평가 결과에 큰 영향을 미치고 있다. 따라서 본 연구에서는 단순 인구 규모가 아니라 지자체 지방상수도는 경영효율화에 영향을 미치는 변수를 선별하여 주요사업 활동 성과 지표 측정에 적용할 수 있는 성과 평가군을 군집분석을 통하여 분석하고자 한다.

  • PDF

Development of underground facility information collection technology based on 3D precision exploration (3차원 정밀탐사 지하시설물 정보 수집 기술 개발)

  • Jisong RYU;Yonggu JANG
    • Journal of the Korean Association of Geographic Information Studies
    • /
    • 제26권4호
    • /
    • pp.56-66
    • /
    • 2023
  • Safety accidents are increasing, such as changes in groundwater levels due to construction work or natural influences, or ground cave-ins caused by soil runoff from old water supply and sewage pipes. In addition, underground facility management agencies must make efforts to improve the accuracy of underground information through continuous investigation and exploration in accordance with the Special Act on Enhanced Underground Safety Management. Accordingly, in this study, we defined the configuration of equipment and data processing method to collect 3D precise exploration underground facility information and developed 3D underground facility information collection technology to ensure accuracy of underground facilities. As a result of verifying the developed technology, the horizontal accuracy improved by an average of 6cm compared to the existing method, making it possible to acquire 3D underground facility information within the error range of the public survey work regulations.

In-Situ Application of the Steel Pipe jacking with Grouting (그라우팅을 병행한 강관추진공법의 현장 적용성 연구)

  • Jung, Min-Hyung;Lim, Ho-Jung;Shin, Chang-Sub;Lee, Song
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • 제13권1호통권53호
    • /
    • pp.152-160
    • /
    • 2009
  • The pipe jacking method which is a non-excavation method is frequently used due to constructability and economical efficiency in a medium or small-sized pipeline construction. However, jacking process of the method still causes problems that the base ground is disturbed and loosen. These lead to surface settlement, strength decrease and leakage of water. Therefore, this study presents in-situ application of the steel pipe jacking with grouting, and it is that jacking and grouting are progressed simultaneously. To verify this, the steel pipe jacking with grouting and the existing steel pipe jacking have been constructed on the same ground condition. It has been proved that the steel pipe jacking with grouting is in-situ applicable according to results of monitoring surface settlement, in-situ density, GPR geophysical prospecting and large scale direct shear test.

Development of an Application System for Efficient Management of Underground Water Supply Facility - Pilot Study in Chonju City - (상수도 지하시설물의 효율적 관리를 위한 응용시스템 개발 -전주시를 대상으로-)

  • 오권호;진철하;이근상;정승현;조기성
    • Journal of the Korean Society of Surveying, Geodesy, Photogrammetry and Cartography
    • /
    • 제18권2호
    • /
    • pp.111-120
    • /
    • 2000
  • Water, waste, electric and gas facilities are urban based facilities that needed in our life and are often located in underground. Therefore, underground facilities are more difficult to manage efficiently than ground facilities. It is needed to carry out survey/probe into underground facilities and to build database in order to prevent city-misfortunes being occurred because of negligent management and in order to minimize budget-waste and a traffic jam according to repetition of road excavation constructions. Also, the development of application system is required to manage efficiently underground facility. Chonju city has launched underground water supply facility computerizing project as a part of National Geographic Information System project until December 1998 and executed survey/probe into 402.89 km water supply that is 80 mm up inside central town area 39.6 $km^2$. Also, chonju city built database into 537 km water supply that is 80 mm below based on water supply card without other survey/probe works. Also, existing work process each department is changed into GIS applied work process and underground water supply facility management system is developed by its work process basis. Water supply underground facility management system that is developed is composed of sub-system like base-map management, water supply inspect, water supply management and water supply inquiry, construction work management, administration management and map management. This research presents the procedure and method of underground water supply facility survey/probe and problem being occurred during survey/probe procedure and also show the functions of each sub-systems composing underground water supply facility management system.

  • PDF

Behavior Characteristics of Underground Flexible Pipe Backfilled with Lightweight Foamed Soil (경량기포혼합토로 뒷채움된 연성매설관의 거동특성)

  • Lee, Yong-Jae;Yea, Geu-Guwen;Park, Sang-Won;Kim, Hong-Yeon
    • Journal of the Korean Geosynthetics Society
    • /
    • 제14권1호
    • /
    • pp.43-50
    • /
    • 2015
  • Lightweight Foamed Soil (LWFS) is a useful material for underground pipe backfill because of reusability of excavated soil and no compaction effect. In this research, a pilot test is carried out and monitoring results are analyzed to investigate behaviors of a flexible pipe, when LWFS is applied as a backfill material. Simultaneously, they are compared with another test case which is backfilled with Saemangeum dredged soil. As a result, the vertical earth pressure of the case backfilled with LWFS slurry presents that decreases as much as 25.6% in comparison with dredged soil and it is only within 10% after solidification. In case backfilled with dredged soil, the horizontal earth pressure is more than 3.6 times of the case used by LWFS and the vertical and horizontal deformation is more than 3.2 and 2.6 times of the case, respectively. It presents excellent effects on earth pressure and deformation reduction of LWFS. The stresses measured at the upper side of the pipe generally present compressive aspects in case backfilled with dredged soil. However, they present tensile aspects in case of LWFS. It is because of negative moment occurred at the center of the pipe due to the buoyancy from LWFS slurry. Conclusively, LWFS using Saemangeum dredged soil is very excellent material to use near the area in comparison with the dredged soil. However, the countermeasure to prevent the buoyancy is required.

A study on the establishment of domestic criteria through analysis of shield TBM requirements in overseas ITB (Invitation to Bid) (해외 쉴드TBM 입찰안내서 분석을 통한 국내 발주 기준 정립에 관한 연구)

  • Kim, Ki-Hwan;Kim, Hyouk;Mun, Cheol-Hwa;Kim, Young-Hyu;Kim, Dong-Ho;Lee, Jae-Yong
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • 제19권6호
    • /
    • pp.985-997
    • /
    • 2017
  • In many countries, most of the tunneling works have been ordered by the shield TBM, and also Korean companies are actively bidding and execute in this project. In case of Korea, refurbished machines are mainly using in power cable, gas pipelines, and water and sewage tunnel. Also in metro projects, shield TBM of over diameter 7m is required mainly by using brand new machine. Since the shield TBM is not easy to change once it is produced, it is necessary for the client to provide sufficient information on the production conditions so as to satisfy various characteristics of the construction. In this study, to manufacturing optimal shield TBM, the Client's TBM requirements of tunnel construction in Hong Kong and UK was analyzed and compared with the domestic requirements. The results are expected to provide as client's guidelines for bidding stage and manufacturing for shield TBM tunneling in Korea in the future.

Runoff Characteristics Change of a Basin under Urbanization (도시화 진행에 따른 유역 유출특성 변화에 관한 연구)

  • Son, Kwang-Ik;Kim, Min-Chol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • 제10권4호
    • /
    • pp.89-93
    • /
    • 2010
  • It is well known that the drastic change of hydrological characteristics of an urbanized basin causes severe runoff, sediment yield, and peak flow. High vulnerability of urban flood disasters is caused by land-use change and development of a basin. A typical site suffering urbanization was selected and the experimental site has being operated last three years. Hydrological and hydraulic characteristics of the urbanizing basin were examined by observation of runoff, sediment loads and precipitation with T/M. The effects of land-use change were analyzed by examination of the hydrological characteristics, such as run-off ratio (runoff volume/rainfall volume), sediment yields. Runoff coefficient of rational equation was increased as basin was urbanized. Suspended sediment yields due to a urban development activities were raised almost 10 times compare to undisturbed condition for small runoff less than 1 cms. Meanwhile, no big change could be detected for bed loads.