• Title/Summary/Keyword: 공종

Search Result 319, Processing Time 0.021 seconds

Analyzing the Market Structure of Asian Construction Contracts : A Perspective on Korean Construction Firms (국내 건설기업의 아시아 계약실적 구조 분석)

  • Lee, Kang-Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.39 no.5
    • /
    • pp.623-630
    • /
    • 2019
  • As the Asian region becomes strategically important in the international construction market, competition among construction firms has been more intense. While existing literature on the Asian construction market have mainly focused on qualitative approaches to market entry strategies and risk assessment, quantitative research to explain the dynamic competitive structure of the market has been rarely conducted. To address this issue, this study analyzes the structure of contract performance in the Asian region based on the data from 3,996 projects awarded to Korean construction firms from 2009 to 2017. In addition, this study applies a mathematical model using both static (market concentration) and dynamic (market mobility and instability) analyses. Consequently, the static analysis indicates that market concentration led by top-four firms tends to be increased, and on the dynamic aspect, the market position of Korean construction firms is recently weakened and fluctuated in most of the Asian regions and the construction sectors. The methodology and result of this paper would be meaningful not only to understand the underlying structure of industry-level performance but also to provide a useful reference for establishing competitive strategies towards the Asian market.

Falling Accident Case Analysis on Construction Working Platform and Working Passage (건설현장 작업발판 및 안전통로 관련 추락 및 전도재해 사고사례 분석)

  • Kim, Hyunsoo;Lee, Yong-Soo;Oh, Inhwan;Ahn, Hongseob
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.2 no.1
    • /
    • pp.9-15
    • /
    • 2019
  • Despite the efforts for enhancing the safety record, construction industry has been suffered from higher fatalities than other industries. The poor record of safety in construction industry means that there is a clear need for an effective countermeasure. As mentioned in previous studies, it is important to identify the type of activities or risks that are likely to cause accidents and to develop appropriate safety measures. Considering the large number of accident cases on the temporary installations including work platforms and work passages, the temporary installations should be managed first. To support it, this study aims to analyze falling accident cases on construction working platforms and passages which can lead to develop proper safety measures. Through the analysis of 1663 accident cases in the perspective of cost, progress, activity, and type of workers, this study identifies how the recent accidents occur and what is the cause of the accident occurrence. The identified causes of accident occurrence will help us to improve current construction safety.

A Comparative Analysis of Risk Assessment Depending on International Project Types (플랜트, 건축, 토목 공종별 해외건설 리스크평가 비교분석)

  • Baek, Seungwon;Han, Seung-Heon;Jung, Wooyong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.5
    • /
    • pp.125-136
    • /
    • 2019
  • This study investigated checked risk level before bid, actual risk level after award, contingency, and cost growth rate in the 124 international construction projects executed by Korean major companies. This study conducted comparative analysis by product type using rank analysis, ANOVA and correlation analysis. As a result, plant and civil projects have worse risk level than architecture projects not only in before bid but also in after award. Especially, country risk is the worst risk in both plant and civil projects, followed by project risk and capability risk. Also, although plant and civil projects reflect more contingency than architecture projects, contingency is not correlated with the checked risk level before bid. Lastly, the cost growth rate is correlated with the actual risk level in all product types. This study is expected to support in planning better practical risk management for international construction projects.

The Impacts of Reduced Labor Hours on the Construction Period and Cost of Tunnel Project (근로시간 단축에 따른 터널 공사의 표준 공기 및 공사비 영향 분석)

  • Park, Taeil;Kim, Kyunghoon;Shin, Eun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.37-43
    • /
    • 2019
  • After the new standards for labor hours has been released, various problems come up in construction field, such as income reduction of employees, extension of construction period and increased construction cost. Although it is expected that the impact of the new standard on the construction industry is more worse than other industries form the view of productivity, not much works have been done to identify those impacts. Thus, this research proposes the standard construction processes, excavation cycle, and unit construction period for NATM tunnel project based on 'Construction Standard Production Rates.'The study also investigated the impact of reduced labor hours on the management of work crews, construction periods and costs of tunnel projects. The results showed that under the 52 labor hour standard, the construction periods for the excavation work and whole project was increased by 20% and 8.9%, respectively, but the construction costs for the excavation work and whole project was decreased by 1.4% and 0.6%, respectively.

Variations of Building Methods and Costs of Modernized Hanok Test-bed Projects (실증구축을 통한 신한옥의 신공법 및 공사비 변화 요인 도출)

  • Seo, Nuri;Kang, Seunghee;Lee, Yunsub;Jin, Zhenhui;Jeong, Yeheun;Jung, Youngsoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.3
    • /
    • pp.86-96
    • /
    • 2019
  • The research efforts to modernize Hanok (Korean traditional housing) have been performed to improve the quality and cost-effectiveness through application of modern building methods and materials, and to disseminate it in various forms of sizes and facilities. In this study, in order to identify the variations of modernized Hanok, data from seven test-bed projects are analyzed based on the building work-section, element, method, and material. The data were standardized and managed through the modernized Hanok classification system (Hanclass) to facilitate systematic comparisons of the test-bed projects by the variation of building method and it's cost impact. Identified factors of the variation in terms of building methods were then itemized and quantified in terms of building cost. Findings of this study indicate that the timber structure is the most critical area for future variation for improving the quality and cost-effectiveness. The results of this study will be also used to systemize the Hanok database for further studies.

A Study on the Promotion of Safety Management at Construction Sites Using AIoT and Mobile Technology (AIoT와 Mobile기술을 활용한 건설현장 안전관리 활성화 방안에 관한 연구)

  • Ahn, Hyeongdo
    • Journal of the Society of Disaster Information
    • /
    • v.18 no.1
    • /
    • pp.154-162
    • /
    • 2022
  • Purpose: The government intends to come up with measures to revitalize safety management at construction sites to shift safety management at construction sites from human capabilities to system-oriented management systems using advanced technologies AIoT and Mobile technologies. Method: The construction site safety management monitoring system using AIoT and Mobile technology conducted an experiment on the effectiveness of the construction site by applying three algorithms: virtual fence, fire monitoring, and recognition of not wearing a safety helmet. Result: The number of workers in the experiment was 215 and 7.61 virtual fence intrusion was 3.5% compared to the number of subjects and 0.16 fire detection were 0.07% compared to the subjects, and the average monthly rate of not wearing a safety helmet was 8.79, 4.05% compared to the subjects. Conclusion: It was found that the construction site safety management monitoring system using AIoT and Mobile technology has a valid effect on the construction site.

A Suggestion on the Improvement of the Business Classification System Considering the Specialty of the Painting Work, Landscaping Construction Industry (전문건설업 대업종화 적용에 있어 도장, 조경공사의 특수성을 고려한 업종분류체계의 제안)

  • Kim, Jeong-wook;Kim, Gyu-yong;Choi, Min-soo;Nam, Jeong-soo;Lee, Sang-soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.497-506
    • /
    • 2022
  • In recent years, the specialized construction industry has undergone major construction and major industries, and without considering the technical expertise of construction works, the construction industry is promoting the integration and establishment of specialized construction industries according to convenience and abolition of their own industries. As the reorganization plan causes confusion in the production structure and lacks persuasive power by aiming only for industry simplification, it is judged to be desirable to review it according to the detailed characteristics of the specialized construction industry. In this study, -to review the reorganization of a rational classification system that considers the specific nature of the specialization of specialized construction projects, the classification of construction works, major work contents and characteristics, technical expertise, and problems of largescale industry in the case of painting construction and landscaping construction was analyzed. Based on this, aspects to be considered when reorganizing the current professional construction industry classification system are identified and reasonable improvement plans for each industry are suggested.

Study to Secure the Safety of Tower Cranes through Disaster Case Analysis at Construction Sites (건설현장의 재해사례 분석을 통한 타워크레인 안전성 확보 방안 연구)

  • Son, Seunghyun;Kim, Ji-Myung;Ahn, Sungjin;Na, Youngju;Kim, Taehui
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.1
    • /
    • pp.57-67
    • /
    • 2022
  • Tower cranes have an unstable superstructure, which means that there is a very high risk of accidents. It is necessary to establish preventive measures to ensure the safety of tower cranes at a time when active efforts are being made to reduce safety accidents involving tower cranes. As such, the purpose of this study is to analyze disaster cases to ensure the safety of tower cranes. For this study, 260 cases of tower crane disasters filed with the Korea Occupational Safety and Health Agency from July 2012 to July 2020 were analyzed. Through this analysis, it was found that lifting work was the most common of the work types, at 45.3%; while of the types of disasters, accidents caused by falls were the most common type, at 35.8%. In addition, with regard to the cause of accidents, work method defects was found to be the highest, at 38.8%. In the future, the findings of this study will be used as basic data to guide the establishment of policy to prevent tower crane accidents.

Development of Planning Method for Double-Tracking of Single Track Railroad based on the Intelligent Rail Alignment Planning Program (ei-Rail) (지능형철도선형계획 프로그램(ei-Rail) 기반의 단선철도 복선화 계획 기술개발)

  • Kim, Jeong Hyun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.6
    • /
    • pp.837-842
    • /
    • 2022
  • The "Intelligent Railroad Alignment Design Program (ei-Rail) developed in 2013 has been adopted in the planning and the evaluation/validation of design results of oversea railroad construction projects. Target countries of Korean railroad industries requires the operating speed increase with alignment improvement and the double tracking of prevailing single track railroads as well as new railroad construction. This study is to develop an additional module for double tracking project of prevailing single track railroads in the ei-Rail. The developed method is based on the geometrics of prevailing railroad, and the definition of planned project determines the project cost based on the unit cost by work type, and provides the draft design of double track. The module was validated with a oversea case. It is then expected for oversea railroad double tracking project more efficiently in planning and the evaluation of design results.

A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye (화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.641-652
    • /
    • 2021
  • Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.