Architectural Work Cost Rate Analysis of Elementary, Middle, and High School Delivered by BTL (초·중등학교 민간투자사업(BTL)의 건축공사비의 공종별 비율 분석)

  • Ryu, Hanguk;Kim, Hyungeun
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.14 no.1
    • /
    • pp.1-9
    • /
    • 2015
  • The accurate estimation of construction cost is critical for effective budgeting and financing of the project. Accurate estimates also allow for informed decisions when considering the responsiveness of bids or proposals and for a contractor to better monitor construction progress. However, current method for construction cost of the public educational facility uses a basic criteria in Korea, e.g, construction cost per unit floor area. Therefore, the purpose of this study is to examine present architectural work cost rate of elementary, middle, and high school delivered by BTL(Build-Transfer-Lease). We examined real construction cost of educational facility according to level of school, such as elementary, middle, and high school. The examination revealed that unit price of BTL educational construction cost are different to the level of school, but the composing rate of architectural work cost of the educational facility are very similar. As a result, it is recommended that future researches are initiated to create specific methods to support the accurate cost estimation of educational facility.

A Study on the Utilization Improvements by Function Analysis of the Construction CALS (건설 CALS 시스템의 기능분석을 통한 활용성 개선방안 연구)

  • Kang, LeenSeok;Han, DongHo;Park, NamJin;Moon, HyounSeok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.3D
    • /
    • pp.441-450
    • /
    • 2011
  • Recent construction projects consist of large and complex facilities, which project management information system (PMIS) is used for managing construction cost and schedule. The ministry of land, transport and maritime affairs (MLTM) is using a continuous acquisition and life-cycle support (CALS) system for managing the public construction projects. This study attempts to survey some problems of the CALS system in practical application, and then suggests the new functions to improve practical application of the CALS system. All functions in each menu were analyzed in the practical application aspect. All projects ordered from MLTM should use the CALS system as a PMIS, but the practical application is limited in partial functions and special working group. And the utilization of system is focused on simple tasks and report process. One of main reason is that the system is using numerical data rather than graphical data. This study suggests new functions and a visualized management method that can improve the practical applicability using a 4D object in each current functions.

A Study on the Work Breakdown Structure of Agricultural Facilities for Developing a Construction and Maintenance Information System -Focused on Vinyl house, Glass greenhouse, Cattle shed- (농촌시설물 시공 및 유지관리 정보화 시스템 구축을 위한 작업분류체계 구축에 관한 연구 -비닐하우스, 유리온실, 축사를 중심으로-)

  • Choi, Oh-Young;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee;Choi, Eung-Kyoo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.4
    • /
    • pp.147-155
    • /
    • 2009
  • Recently, the scale and technical complexity of agricultural production has been growing. Therefore, agricultural facilities are being gradually diversified, expanded, and made more complex. To furnish Korea's agricultural industry with international competitiveness, it is thus necessary to introduce new management techniques. The PCM (procurement-construction-maintenance) information management system for agricultural facilities is established by setting up its WBS (work breakdown structure). In this study, the WBS of a facility such as facility, space, element, works, and resources is analyzed. Following this analysts, a WBS of an agricultural facility that is appropriate for the PCM information system of an agricultural facility, is proposed by deriving it from actual WBS.

Weight Evaluation of Risk Factors for Early Construction Stage (초기 건설공사 리스크인자의 중요도 산정)

  • Hwang Ji-Sun;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.115-122
    • /
    • 2004
  • This study identifies various risk factors associated with activities of early construction stage, then establishes the Risk Breakdown Structure(RBS) by classifying the risks into the three groups; Common risks, risks for Earth works, and risks for Foundation works. The Common risks are identified and classified by considering various aspects of the early construction stage such as financial, political, constructional aspects, etc. The risks for Earth works and Foundation works are identified in detail by surveying technical specifications, relevant claim cases and interviewing with experts. These risks are classified based on the Wok Breakdown Structure(WBS) of the early construction stage. The WBS presented in this study classifies the works of early construction stage into four categories; excavation, sheeting works, foundation works, footing works. This study suggests a risk analysis method using fuzzy theory for construction projects. Construction risks are generally evaluated as vague linguistic value by subjective decision making. Fuzzy theory is a proper method to quantify vague conditions of construction activities. Therefore, this study utilizes fuzzy theory to analyse construction risks. The weight of risks is estimated by reflecting the interrelationship among risk factors from absolute weights obtained by fuzzy measure into the relative weights by Analytical Hierarchy Process(AHP). The interrelationship is estimated by Sugeno-fuzzy measure.

A Development of Task Generator through an Analysis of Task Location Information Structure (작업위치 정보체계 분석을 통한 작업정보 생성기 개발)

  • Chin Sangyoon;Kang Woo-Young;Kim Yea-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.64-71
    • /
    • 2004
  • A daily report is one of the critical documents in construction projects, since it helps them keep track of various as-built information. Despite the important role in progress management, the daily reporting process is time-consuming, and the representation of task information on daily reports are not effective enough to accumulate daily as-built information for further use in project management. Task information is composed of a specific work type and a location where the task is performed, which means that the same type of work is repeated over the locations. However, in many cases the task locations are described differently depending on a reporter's preference or experience. Without representing task location information effectively, it is difficult to accumulate and to reuse as-built information. The objective of this research is to build a framework for generating task information which can be efficiently accumulated and reused for progress management. To do so, this research built a task information model with focusing on the representation of task location associated with a work type, and developed an information system that supports automated and interactive generation of task information.

A Study on the Application of Cost Risk Exposure methods by the Probabilistic Evaluation on the Construction Projects (확률적 평가에 의한 건설공사 비용 위험도 측정의 적용성에 관한 연구)

  • Cho Jea-Ho;Chun Jae-Youl
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.1 s.1
    • /
    • pp.63-71
    • /
    • 2000
  • The paper considers two non-deterministic methods of analysing the risk exposure in a cost estimate The fist method(referred to as the 'conventional statistical' method) analyses cost data directly, to describe a probability distribution for total cost. The second method(referred to as the 'Monte Carlo simulation' method) interprets cost data directly, to generate a probability distribution for total costs from the descriptions of elemental cost distribution. The common practice of allowing for risk through an all-embracing contingency sum or percentage addition is challenged. Rather than excluding conventional, non-deterministic methods, they are here presented as possibly the only of effective foundation on which to risk management in cost estimating.

  • PDF

An Approximate Cost Estimating Model for Eco-River Facility Construction Project at Planning Stage (자연형 하천공사 개략공사비 산정모델의 개발)

  • Choi, In-Wook;Lee, Si-Wook;Woo, Sung-kwon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.104-112
    • /
    • 2009
  • After the middle of 90's, the eco rivers maintenance enterprise was propelled about city rivers. The environmental function is more emphasized because of revising the rivers law enforced at 2008.4. Also, the field of application is being magnified. It is difficult to apply that the conceptual public work expense estimating model of the rivers which adjusts a focus at open channel rivers excepts the small-scale rivers maintenance public work. The research presents a eco rivers public work conceptual public work expense estimating model frame work. It suits the change of the rivers environmental renewal construction paradigm. It develops the conceptual public work expense estimating plan of the rivers at the planning phase using the collection and analysis of the data. As a result, riffle, spur dyke, stepping stones, fish way and etc are added. Consequently, it brings the hydrophilic function is considered seriously conceptual public work expense estimating model of the eco rivers.

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.

Development on Breakdown Structure of Construction Site centered Construction Temporary Technology Index (현장중심의 건설가설기술요소 분류체계 구축)

  • Park, Junmo;Kim, Okkyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.77-85
    • /
    • 2014
  • A construction temporary work is main process and importance trade section. It has many works and facilities such as temporary transfer equipments which tower crane, and lift, and architectural temporary facilities which temporary office, temporary warehouse, and site test laboratory, and construction temporary equipments which scaffoldings, work plates, construction supports, and forms to set and to use in under construction and to remove in the end. A technology system of construction temporary has very low availability of field works and needs improvements in Korea as construction site has a quick response about new requirements. This study is organized existing technology systems and new technologies for field works, and developed breakdown structure of construction temporary technologies to be a basic of temporary technologies as review with site managers. For this, it will improve to be a knowledge and information system as a research of a performance and an availability about a construction temporary technology index.

An Investigation of the Overseas Project Core Factors of Public New Town Development Company (신도시개발 공기업의 해외시장 진출을 위한 핵심경쟁요소 고찰)

  • Jeon, Ji-Ho;Choi, Seok-Jin;Park, Sang-Hyuk;Han, Seung-Heon;Kim, Hyoung-Kwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.626-631
    • /
    • 2007
  • New town development project which has manifold operations is usually on a large scale and its spin-off spreads widely. Although international new town development market is widely increasing, new town development market in Korea is now decreasing. Thus, Korean public new town development company which has a lot of business experiences in local new town development market is now facing the necessity of making a foray. This study had a Focus Group Interview with people who experienced in international construction market to set up the core factors of international new town development market. After that, Importance Performance Analysis and Content Analysis were performed with questionnaire to determine the present condition of Korean public new town development company.

  • PDF