• Title/Summary/Keyword: 공종

Search Result 319, Processing Time 0.028 seconds

Characteristics of the influence of defect types and period of occurrence according to the type of tile work in an apartment house (공동주택 내 타일 공종에 따른 하자 유형과 발생기간의 영향 특성)

  • Pyeon, Su-Jeong;Kim, Gyu-Yong;Choi, Byung-Cheol;Kim, Moon-Gyu;Gill, Min-Woo;Nam, Jeong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.67-68
    • /
    • 2022
  • The area inside the apartment building where tiles are installed is applied as a finishing material for walls and floors, including exterior walls, balconies, hallways, bathrooms, and kitchens. As it is constructed in various spaces, differences in the type and period of occurrence of tile defects may appear, which is caused by heterogeneous characteristics between materials and external causes. Therefore, in this study, two-way ANOVA was used to figure out the relationship between the defect occurrence type and the period depending on the type of tile construction in the apartment building.

  • PDF

A Case Study on the Demolition of Power Plant with Blasting Method for the First Time in Korea (국내 최초 발파공법 적용 발전소 해체 사례)

  • Oh, Ki-Taek
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2023.11a
    • /
    • pp.87-88
    • /
    • 2023
  • 서해안 최고의 동백정해수욕장과 마량리 동백나무숲은 1970년대 오일쇼크 이후 에너지 자립을 위해 발전소를 건설하면서 사라졌다. 그 당시 준공된 화력발전소는 전력공급 이라는 소임을 완수하고 2021년 부터 동백정의 아름다운 옛 모습 그대로 지역주민에게 돌려 주기위한 친환경 사업으로 발전소 철거공사를 시작, 동백정 복원공사를 추진 하기로 했다. 고층 및 중량물의 건축물 및 구조물을 안전하게 해체하기 위해서는 국내 최초 발전소 철골구조물에 대한 발파·전도공법을 채택 하였다. 철거작업은 고위험 공종으로 참여 주체인 발주자, 설계자, 감리자, 시공자 및 근로자 전 계층의 참여로 사전 위험성평가를 통해 근원의 위험요인 발굴 및 안전대책 수립, 수립된 안전대책 100% 이행을 통해 무재해 준공 달성 하기를 기대한다.

  • PDF

A Study on the Utilization of Safety Management in the Construction Site of Smart Construction Safety Monitoring System (스마트 건설안전 모니터링 시스템 건설현장 안전관리 활용화 방안에 관한 연구)

  • Ahn, Hyeoung-Do
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.197-198
    • /
    • 2022
  • 건설현장 안전관리를 인적 역량 중심에서 첨단기술인 AloT와 Mobile기술을 활용한 시스템 중심의 관리체계로의 전환을 위한 건설현장 안전관리 활성화 방안을 마련하고자 한다. AloT와 Mobile기술을 활용한 건설현장 안전관리 모니터링 시스템 이 건설현장의 유효성에 대하여 공동주택현장의 골조공종에 종사하고 있는 작업자를 대상으로 가상휀스, 화재감시, 안전모 미착용 인식 3개의 알고리즘을 적용하여 실험을 실시하였다. 연구결과 AloT와 Mobile기술을 활용한 건설현장 안전관리 모니터링 시스템이 건설현장에 유효한 영향을 미치는 것으로 나타났다.

  • PDF

Efficient Application Way of Six Sigma at Railway Construction Project (철도건설사업의 6시그마의 효율적 적용방안)

  • Hong, Sung-Heui;Jung, Sung-Bong
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.1251-1262
    • /
    • 2011
  • K-company, being in charge of domestic railway construction and facilities management, got a success rate of 41% with the implement of a improvement scheme by prosecuting of 6 Sigma and the achievement of CTQ (Success criteria : more than 0.5 in achievement of CTQ). It is clear that the factors having an effect on achievement of CTQ are the level of project when pushing forward the project(Big Y and small y according to the scope of the work), the degree of interest of an officer in charge like sponsors, and the continuous feedback toward the implement of a improvement scheme. For improvement CTQ achievement, firstly redefine about a type of project. Secondly, derive small y by Big Y and derives a unit work by small y. Then grouping the unit works and achieve Big Y by performing of every unit work as an executive subject. Thirdly organize a committee of subject selection which is supervised by the general manager. Therefore exhibit staff's leadership, for example motivation, by strong incentives. Lastly, provide ongoing learning and enhance system monitoring about a result management of an betterment execution department.

  • PDF

A Multi-agent based Cooperation System for an Intelligent Earthwork (지능형 토공을 위한 멀티에이전트 기반 협업시스템)

  • Kim, Sung-Keun
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.5
    • /
    • pp.1609-1623
    • /
    • 2014
  • A number of studies have been conducted recently regarding the development of automation systems for the construction sector. Much of this attention has focused on earthwork because it is highly dependent on construction machines and is regarded as being basic for the construction of buildings and civil works. For example, technologies are being developed in order to enable earthwork planning based on construction site models that are constructed by automatic systems and to enable construction equipment to perform the work based on the plan and the environment. There are many problems that need to be solved in order to enable the use of automatic earthwork systems in construction sites. For example, technologies are needed for enabling collaborations between similar and different kinds of construction equipment. This study aims to develop a construction system that imitates collaborative systems and decision-making methods that are used by humans. The proposed system relies on the multi-agent concept from the field of artificial intelligence. In order to develop a multi-agent-based system, configurations and functions are proposed for the agents and a framework for collaboration and arbitration between agents is presented. Furthermore, methods are introduced for preventing duplicate work and minimizing interference effects during the collaboration process. Methods are also presented for performing advance planning for the excavators and compactors that are involved in the construction. The current study suggests a theoretical framework and evaluates the results using virtual simulations. However, in the future, an empirical study will be conducted in order to apply these concepts to actual construction sites through the development of a physical system.

Problems and Improvement Directions of Fire Protection Designing and Supervising Jobs (소방 설계·감리업의 문제점 및 개선방향에 관한 연구)

  • Cha, Jong-Ho
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.12
    • /
    • pp.8745-8752
    • /
    • 2015
  • Since many accidents have occurred in Korea in these days, many people have lost their health and have been damaged. The damages caused by fires which occur to many buildings where many people always reside takes a substantial share of the total damages. And since the proportions of the domestic fire protection designing/supervising industries are relatively much disregarded compared to other kinds of work, it is in the situation that there are many cases of serious damages because the fire protection equipment didn't exert the proper functions on fire after a building is constructed since the supervision against the poor construction along with the inadequate design. In order to improve such situations, in case of the design industry, the criteria on registration and workforce placement, the scope of operation, the design documents required when requesting the agreement to the construction permits, the responsibilities and authorities about the jobs of the fire protection facility designers must be improved and, in case of supervising industry, the registration criteria, the operation scope and the kinds, methods, targets and criteria of supervision, the criteria on the additional placement of assistant supervisors, the contents and scope of work must be improved, the PQ system and Public Supervision System must be reviewed and the systems for preventing any poor supervision must be improved in order to pursue the security of the people and their properties at the same level as the other kinds of work by preparing for the firm position and foundation of the fire protection design and supervision.

A Study on the Change of Work and Improvement in the Private Forest Road of Chungcheongnam Province (충청남도 민유임도에 적용된 공종의 변화 및 개선방안에 관한 연구)

  • Lee, Joon Woo;Kim, Ju Baek;Choi, Yeon Ho;Kim, Myeong Jun;Park, Bum Jin;Park, Jong-Min
    • Journal of Forest and Environmental Science
    • /
    • v.23 no.1
    • /
    • pp.21-28
    • /
    • 2007
  • In my study, I analysed and criticised the change of applied works based on a design drawing of a private forest road in Chungchengnam province from 1990 to 2003. The aim of this study is to obtain the fundamental resources for establishment the green forest road which is environment friendly. Working expenses of forest road was gradually increased by a business year. In particular, the working expenses dramatically increased in 1999-2000. In change rate of cost of construction by works, earth work rate of the cost of constructions was declined: from 25.4% in 1990-1999, to 18.5% in 2000-2003. However, the total cost of the construction of slope protection work and structural work increased. Nevertheless the rate of the cost of constructions are not increased where as the earth work rate of the cost of constructions were reduced. The rate of the price construction materials and the cost of construction was the main causes which was led by the extension of the standard requirement of applied work and the increase of the materials of applied work. In other word, materials of structural work and slope protection work increased. If the increase of the cost of construction has seem through the increase of contractual materials and extension of the standard requirement would led to weak competitiveness of forest road. Therefore, diverse method of constructions need to apply and a new method should be developed.

  • PDF

Analyzing Environmental Impacts in Construction Project at Different Ownership - Focus on Express Road Pavement Process - (공공발주자와 민간기업 측면의 건설공사 온실가스 환경비용 영향분석 - 고속도로 포장공종을 중심으로 -)

  • Jang, Woo Sik;Park, Heedae;Han, Seung Heon;Jeon, Jong Seo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.31 no.1D
    • /
    • pp.111-117
    • /
    • 2011
  • In the wake of increased concerns on reduction of greenhouse emission which started with United Nation's Framework Convention on Climate Change (UNFCCC) and Kyoto protocol, Korean government is making various efforts under the represented slogan "Low Carbon, Green Growth". Therefore, it is inevitable that construction industry also follow the Korea government's slogan and the international trend in environmental problems. This study identified several main construction materials and equipments of civil construction projects and suggested a environmental cost estimation method and related estimation standards (Public and private owners are distinguished). A case analysis of a real road construction project is also performed and characteristics according to the owner type is compared. This study analyzed the environmental impact to total construction cost variations. In the result, public owner required 11~16% of extra budget and private owner required 19~22% of extra costs. This study is limited in consideration of environmental factors and carbon trading prices.

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

Empirical Assessment of International Entry Strategy for Large Construction Companies (주요 전략지수별로 살펴 본 국내 대형건설업체의 해외건설 진출전략 효과에 대한 실증적 연구)

  • Jung, Woo-Yong;Han, Seung-Heon;Jang, Woo-Sik;Koo, Bon-Sang
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.1
    • /
    • pp.59-69
    • /
    • 2010
  • Although international construction market gradually takes a important position among the export industries, the previous studies about international construction entry strategy have just focussed on trend investigation or suggestion for revitalization. Moreover, in order to prepare the market uncertainty such as world financial crisis and to plan the long term strategy, specific strategy studies based on corporate level are required. Therefore, this study estimates the nine strategic index and four financial index of 31 companies that performed 1920 international projects from 1993 to 2007 and evaluate the performance as three periods by multi-regression analysis. Also, this study analyze dynamic correlation between these index and the performance considering times. this study verifies that market diversification, product diversification, localization and decrease of debt to asset ratio make a good effect on the international order as long term strategy and shows that collaborated entry with domestic corporations, alliance entry with host country's company, alliance entry with third country's company, portion of labor cost and portion of management expense differently make a influence on the performance as times. these results will be helpful for the construction companies to plan the international entry strategy reasonably and specifically.