A Study on the Cost and Schedule Integration Model based on the Improvement of Work Packaging Mode (Work Packaging Model의 개선을 통한 공정 - 공사비 통합모델 구축)

  • Kim Yang-Taek;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.4 s.4
    • /
    • pp.82-90
    • /
    • 2000
  • An integrated cost and schedule control is a noteworthy alternative of the separate control method which is commonly used in the domestic construction industry. In Korea, some cost and schedule integration models have been applied partly by construction managers. But, these models have not been customized yet because they did not reflect the characteristics of the domestic construction industry. This study investigates the characteristics of domestic integration models analyzed through interviews with experts who have the experiences in applying cost-schedule integration models. Based on these surveys, this study suggests the strategy for the improvement of work packaging model in the domestic construction industry.

  • PDF

A Study on Schedule Management in Construction Project Using the Dependency Structure Matrix(DSM) (DSM을 이용한 건설사업 공정관리에 관한 연구)

  • Jang, Se-Hoon;Park, Moon-Seo;Lee, Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.682-686
    • /
    • 2007
  • Construction project has been more complex and bigger as various demands of the times. But current schedule management method in construction project uses only PERT or CPM made in 1950s without innovation. Also current schedule management focuses on not information flow between activities and variability of information exchanged but result. This paper suggest using the DSM(Dependency Structure Matrix) in schedule management of construction project to overcome limitations of current scheduling tools. DSM has been introduced as a new theory in construction industry in 1990s at the United States, but its application is still insufficient in domestic field due to the absence of systematic study.

  • PDF

Development of a Process Management System for Shock Absorber Piston Rod Manufacturing (쇽옵서버 피스톤로드 제조공정에 대한 공정관리 시스템 개발)

  • Chung, Ho-Yeon;Shin, Dong-Joo
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.32 no.4
    • /
    • pp.87-92
    • /
    • 2009
  • 쇽옵서버 피스톤로드(shock absorber piston rod)는 자동차의 충격과 진동의 흡수에 작용하는 자동차 현가장치(suspension equipment)부품의 일종이다. 피스톤로드는 자동차 충격흡수에 매우 밀접한 영향을 주기 때문에 제조에 있어서 고도의 정밀도와 표면 매끄러움이 요구된다. 피스톤로드의 제조공정은 선삭, 홈가공, 밀링, 전조 등 여러 공정으로 구성되는데, 여기서 품질불량에 가장 크게 영향을 주는 공정은 선삭공정(lathing process)이다. 이는 선삭공정의 가공공구(insert component)가 주원인으로서 반복되는 가공으로 인한 공구의 마모(abrasion)나 파손(breakage)이 주요 원인으로 지적되고 있다. 따라서 가공 데이터를 수집 분석하여 공구의 교체시기를 파악한다거나 가공 부품의 측정 데이터가 관리도 상하한선 내에 있는지 등 가공 공정 전반에 대한 체계적인 공정관리 시스템 개발이 요구된다. 본 연구에서는 자동차 쇽업서버 피스톤로드 제조공정의 가공 정보를 체계적으로 수집하여 관리하고 분석하는 자동차 쇽업서버 피스톤로드 제조공정에 대한 공정관리시스템을 개발하는 것이 목적이다. 개발결과 피스톤 로드의 측정 치수 변화 및 불량발생을 측정, 감지할 수 있었으며, 본 시스템을 통해 가공공구의 치수오차를 보정(compensation)하고 공정의 불량발생을 조기에 방지 함으로써 불량률은 1/5로 경감하고 작업자 수도 1/2로 감소시킬 수 있었다.

실시간 진단 솔루션/통합 관리 운영 SW Platform

  • Hong, Jang-Sik
    • Proceedings of the Korean Vacuum Society Conference
    • /
    • 2013.08a
    • /
    • pp.83.1-83.1
    • /
    • 2013
  • 반도체 미세화, Glass 대면적화에 따른 산포관리 및 불량방지 필요(공정이격관리), 설비 데이터만으로는 Sensitivity가 낮아 공정 관리 어려움에 따른 대안 필요, 향후 추가 센서에 대한 접목이 용이한 SW Frame 필요, 양산적용을 위한 설비 및 FAB Host의 자동화 연계 개발 필요, 이종데이터의 통합를 통한 최적의 진단 및 관리가 필요합니다(SCM:툴박스). 즉, 기존의 장비 Parameter가 아닌 실제 공정시 Chamber로부터 얻을 수 있는 물리, 전기, 화학적인 데이터를 적합한 이종(異種) 센서를 직접 부착하여 이들 데이터를 통합 관리 분석 및 실시간 Monitoring을 통한 공정 진단 및 실시간 진단을 실행하는 솔루션입니다. 실 공정 시 적용이 유리한 OES 데이터를 주요 인자로 이외의 기타 데이터를 추가로 통합하여 특화된 분석환경과 공정 모니터링을 통하여 TAT (Turn Around Time)를 줄이고, MTBC (Mean Time Between Clean)를 늘림으로써 궁극적으로 칩메이커의 제품의 가격 경쟁력을 확보 할 수 있는 기능이며, 설비사 입장에서는 자사설비의 지능형 시스템을 위한 제반 기술이기도 합니다.

  • PDF

A study on the control chart pattern for detecting shifts using neural network in start-up process (초기공정에서 공정변화에 대한 신경망을 이용한 관리도 형태 연구)

  • 이희춘
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.6 no.3
    • /
    • pp.65-70
    • /
    • 2001
  • This Paper Propose the control chart Pattern to provide a more comprehensive scheme for detecting process shifts using individual observations in start-up process. In this paper, which uses the backpropagation algorithm two samples are fed into the trained neural network to provide outputs ranging from 0 to 1. The main advantage of using neural networks approach with a control chart is that the neural network has almost no delay in detecting small shift. This paper illustrates how neural networks can provide a useful method for optimizing parameter(connection weights) that affect process control. Simulation results show that the performance of the proposed control chart using the neural network (NNCC) is quite promising.

  • PDF

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

Design and implementation of a project management system capable of process management by Activity using PERT/CPM (PERT/CPM을 이용한 Activity에 대한 연결 공정관리가 가능한 프로젝트 관리 시스템의 설계 및 구현)

  • Park, Sun-Yi;Park, Hee-Sook
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.26 no.5
    • /
    • pp.802-807
    • /
    • 2022
  • In projects where mufti-project management is required and processes for production activities are repeated and linked, it is very difficult to input processes for activity repeatedly or analyze loads by process in a method of managing processes step by step. In this paper, based on the definition of activity and project process, the connection process can be automatically created for activity, schedule and resource management for each process, schedule and resource plan can be established for each detailed process, and load analysis can be provided in real time. It presents a project management system that can significantly improve the time and cost of project progress management, predict various problems that may occur during the project, and effectively allocate the necessary amount of resources in the right place.

Procedure for monitoring special causes and readjustment in ARMA(1,1) noise model (자기회귀이동평균(1,1) 잡음모형에서 이상원인 탐지 및 재수정 절차)

  • Lee, Jae-Heon;Kim, Mi-Jung
    • Journal of the Korean Data and Information Science Society
    • /
    • v.21 no.5
    • /
    • pp.841-852
    • /
    • 2010
  • An integrated process control (IPC) procedure is a scheme which simultaneously applies the engineering control procedure (EPC) and statistical control procedure (SPC) techniques to reduce the variation of a process. In the IPC procedure, the observed deviations are monitored during the process where adjustments are repeatedly done by its controller. Because the effects of the noise, the special cause, and the adjustment are mixed, the use and properties of the SPC procedure for the out-of-control process are complicated. This paper considers efficiency of EWMA charts for detecting special causes in an ARMA(1,1) noise model with a minimum mean squared error adjustment policy. And we propose the readjustment procedure after having a true signal. This procedure can be considered when the elimination of the special cause is not practically possible.

A Readjustment Procedure after Signalling in the Integrated Process Control (통합공정관리에서 재수정 절차)

  • Park, Chang-Soon;Lee, Jae-Heon
    • Communications for Statistical Applications and Methods
    • /
    • v.16 no.3
    • /
    • pp.429-436
    • /
    • 2009
  • This paper considers the integrated process control procedure for detecting special causes in an IMA(1,1) process that is being adjusted automatically after each observation using a minimum mean squared error adjustment policy. When the control chart signals after the occurrence of a special cause, the special cause will be detected and eliminated from the process by the rectifying action. However, when the elimination of the special cause costs high or is not practically possible, an alternative action is to readjust the process with appropriately modified adjustment scheme. In this paper, we propose the readjustment procedure after having a true signal, and show that the use of the readjustment can reduce the deviation of a process from the target.