1 |
Park, K. S.; Facilities Management in the period of Factory Automation, Youngji-munhwa Publishing, 1997
|
2 |
Kang, J. K., Lee, K. I., Cho, H. B., and Ryu, Y. C.; “An Automated Design System for Ball-joint Parts of Automobiles,” in Proc. the Fall KIIE Conf., 271-275, 2003
|
3 |
Lee, J. S.; “Development of an Educational Computer Integrated Manufacturing System for a Model Plant,” Ph.D. dissertation, Dept. Meche. Eng., Chonbuk Nat’nl University, Korea, 2005
|
4 |
Mok H. S., Moon, K. S., Shin, H. C., and Pyo, S. T.; “Automation of Assembly System in Make-To-Order,” Journal of KIIE, 27(1) : 103-110, 2001
|
5 |
So, K. C. and Tang, C. S.; Optimal operating policy for a bottleneck with random rework, Management Science, 41(4) : 620-636, 1995
DOI
ScienceOn
|
6 |
Lee, S. Y.; Reliability Engineering, Hyung-sul Publishing, 1996
|
7 |
Kwon, Y. K.; Industrial Ergonomics, Hyung-sul Publishing, 1996
|
8 |
Luo, J. and Wang, G. N.; “Estimated Time of Interlocks in PLC-Code Auto-Generation for Simulation Based Verifica- tion,” in Proc. the Fall KIIE Conf., 2006
|
9 |
Lada, E. E., Lu, J-C., and Wilson, J. R.; A Wavelet-Based Procedure for Process Fault, IEEE Transaction on Semiconductor Manufacturing, 15(1) : 79-90, 2002
DOI
ScienceOn
|
10 |
Charnes, Cooper and Rhodes; “Measuring the efficiency of decision making units,” European Journal of Operational Resarch, (2) : 429-444, 1978
DOI
ScienceOn
|
11 |
Sohn, S. Y., Moon, H. U., and Hong, C. K.; “Cost of Ownership Model for the Inspection Equipment of Multiple Quality Attributes,” Journal of KIIE, 27(3) : 297- 304, 2001
|
12 |
Kang, Y. H.; A scheduling scheme for parallel machines where jobs demand repetitive processing, a thesis for a master degree, Dept. of I.E., Korea Univ., 2003
|
13 |
Baek, J. G., Kim, C. O., and Kim, S. S.; Online learning of the cause-and-effect knowledge of a manufacturing process, International Journal of Production Research, 40(14) : 3275-3290, 2002
DOI
ScienceOn
|
14 |
Lee, S. Y.; A Bit Factory Automation : “Manufacturing Cost Estimation Using Group Technology,” Journal of KIIE, 15(2) : 77-86, 1989
|
15 |
Koo, L. J., Yeo, S. J., Lee, K. G., Hong, S. H., Park, C. M., Park, S. C., and Wang, G. N.; “The Process Analysis and Application Methods for PLC Code Programming,” Journal of IE Interface, 21(3) : 294-301, 2008
ScienceOn
|
16 |
Chang, Y. S. and Bae, D. S.; “Economic Component Screening Procedures for Two-Component Products Supplied with Warranty,” in Proc. the Spring KORM/KIIE Co-held Conf., 308-311, 2001
|
17 |
Park, B. G., Kim, Y. G., and Kang, I.S.; Quality Management, Sam-woo Publishing, 1996
|
18 |
Kim, J. B., Kim, W. J., and Cho, N. W.; “An Efficiency Evaluation among Manufacturing Process using Hybrid DEA/AHP Model,” Journal of IE Interface, 21(3) : 302-311, 2008
ScienceOn
|
19 |
Park, S. J., Ko, K. H., Lee, J. K., and Park, J. H.; “A study on the CAM automation by standardized machining process plan,” in Proc. the Fall KIIE Conf., 2006
|
20 |
Kang, Y. H., Kim, S. S., Park, J. H., and Shin, H. J.; “Scheduling Algorithm for Nonidentical Parallel Machines Problem with Rework,” Journal of KIIE, 33(3) : 329-338, 2007
|
21 |
Ramirez-Marquez, J. E. and Coit, D. W.; A heuristic for solving the redundancy allocation problem for multiple-state series-parallel systems, Reliability Engineering and System Safty, 83 : 341-349, 2004
DOI
ScienceOn
|
22 |
Kim, H. G., Bae, C. O., Kim, J. H., and Son, J. Y.; “Solution Method for Reliability Optimization of a Series System with Component Choices,” Journal of KIIE, 34(1) : 49-56, 2008
|
23 |
Kim, W. C., Kim, J. J., Park, B. W., Park, S. H., Park, H. R., Song, M. S., Chun, J. W., and Cho, S. S.; Introduction to Statistics, Youngji-munhwa Publishing, 1995
|
24 |
Wi, Y. R., Kim, M. H., and Jang, D.S.; “The Robust Pattern Recognition System for Flexible Manufacturing Automation,” Journal of KIIE, 24(2) : 223-240, 1998
|