Transactions of the Korean Society of Mechanical Engineers A
/
v.20
no.1
/
pp.14-23
/
1996
Scheduling jobs effectively under consideration of actual loads on machines is one of the most complicated tasks in production control. The complexity of the finite capacity scheduling often makes the conventional methods of industrial engineering fail. As an alternative, Knowledge-based approaches to job-shop scheduling have been evolved recently. This paper presents a blackboard- based scheduling expert system which combines knowledge-based scheduling with interactive scheduling. It is shown to be possible to generate the feasible schedule within a reasonable time. Flexible reaction management is also possible while keeping the changes in the generated schedule to the minimal and adjusting the schedule to tardy operations or working environmental changes. The system is equipped with a rule base with heuristics for handling conflicted event. A case study applying the implemented system is described.
Journal of the Korean Institute of Landscape Architecture
/
v.50
no.1
/
pp.78-90
/
2022
This research analyzed the status and problems of civilian expert programs for landscape architects to suggest alternatives to improve the current system. Literature research focused on the issues of the legal definition of civilian experts, the background of the program, and related regulations. Based on the understanding of the legal system, the research analyzed the operation status, structure, roles of the civilian expert program of local governments where landscape architects were delegated as civilian experts. Currently, 50 local governments are running the civilian expert program, and landscape architects are working as civilian experts in 11 institutions. The majority of landscape architects are working as MA or general architects. Only SMG runs an independent general landscape architect program. Based on the literature research and interviews with 16 experts, the research examined four main issues related to the program. First, the legal system issues of the civilian expert programs are related to the regulations assuming architects as experts. Revising the current legal system is a better alternative than promulgating a new law for landscape architects. Second, the compensation issue was a main problem related to operation. Securing a sufficient budget and more effective administration is required to solve the problem. Third, related to the role, the tasks being limited to consultation were regarded as the main problem. Although landscape architects wanted more opportunities to directly participate in the project's design, the fairness of the public project contracting system needed to be considered. Fourth, the competence issue is related to the number of available landscape architects. This issue can be solved by expanding the pool of civilian experts to adjacent disciplines, such as public design or landscape management.
Journal of the Korea Institute of Building Construction
/
v.19
no.3
/
pp.263-272
/
2019
Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.
Proceedings of the Korean Operations and Management Science Society Conference
/
1992.04b
/
pp.581-591
/
1992
최근 급속한 사무자동화와 함께 컴퓨터의 사용이 보편화되어 가지고 있다. 이에 따라 컴퓨터등 VDT에 매달려 일하는 사무직 근로자들이 시력장해, 두통, 어깨결림, 요통, 스트레스성 장애등 새로운 질병에 시달리고 있다. 이것은 "VDT증후군"(Visual Display Terminal Syndrome) 또는 "VDT병"이란 신종 직업병이다. 컴퓨터 수상기 화면을 계속해서 들여다보면 화면에서 나오는 자외선과 강한 빛으로 눈에 무리가 와 충혈되고 침침해지며 두통 증세가 나타난다. 이런 초기증상이 6개월이상 계속되면 시력이 떨어지고 만성피로를 느끼는가 하면, 때때로 독감과 비슷한 증상이 나타나며, 심하면 탈모현상까지 경험하게 된다. 요즘 시행되고 있는 초등 고교 컴퓨터교육의 의무화와 2천년대의 1가구 1단말기 설치를 목표로한 컴퓨터 영상단말기의 급속한 보급으로, 앞으로는 사무실뿐만 아니라 일반 가정에까지 컴퓨터 이용이 일상화될 전망이고 보면 VDT작업에 따른 건강장해 문제는 더이상 가볍게 볼 수 없는 문제이다. 이에 대해 선진국에서는 작업시간 규제, 회사가 종업원의 정기적인 시력검진 및 시력교정에 필요한 비용을 보조하도록 하는가하면 실작업환경 개선등 다각적인 대책을 마련하고 있다. 미국, 유럽, 일본등 선진국에서는 VDT작업 여성들의 유산 및 기형아 출산등 임신이상에 관한 실태보고서까지 나오고 있어 여성들에게 커다란 충격을 던져주고 있다. 그러나 우리나라에서는 VDT병 증상을 호소하는 근로자들의 직업병예방 및 대책에 큰 어려움을 겪고있다. 그러므로, VDT작업으로 인한 건강상의 문제, 작업환경 및 작업자세등을 조사하여 문제점과 예방대책을 살펴보고, 작업장을 인간공학적으로 설계하고 평가하여 사용자의 건강을 보호하고 생산성의 향상에 도움이 되고자 한다.생산성의 향상에 도움이 되고자 한다.Action Code를 계산처리부로 넘겨준다. 입력처리부에서는 Mouse와 Keyboard 어느것으로나 입력이 가능하도록 해준다. 출력처리부에서는 Action Code에 따라 계산처리부에서 계산된 결과를 화면에 보여주기 위한 각종 2D/3D Graphic Routine들이 포함되어있어 계산처리부에서 불러쓰도록 되어있다.에서는 전문가시스템 기법을 도입해서 사출금형 공정계획전문가의 지식과 경험을 획득하여 지식베이스를 구축하고, 전문가시스템 셀(shell)중 CLIPS를 이용하여 자동공정계획시스템인 Mold CAPP을 개발하였다.PP을 개발하였다.며 이와 상이한 결과도 보여주고 있다. 이상으로 볼 때 1) 가정하수의 질을 높이기 위하여 분뇨정화조 의 효율증대 2) 산업폐수의 공정별 폐수량의 조절 및 폐수성 상에 따른 총량규제에 대비한 효율증대 3) 하천의 오염부하와 자정능력 최대한 부여 4) 폐수처리를 위한 미생물제개발 및 오염지표 종 연구와 오염내성 생물의 연구등이 종합적 으로 수행되어야 한다. 5) 이상의 모든 조사와 연구결과를 객관적으로 표기할 수 있도록 하천의 이정표가 정해져야 하겠다.7%)에 비해 유의하게 낮았고 정상군과는 유의한 차이를 보이지 않았다.상고나성이 있었다. 혈중 호모시스테인 농도는 질병의 위험요인으로서 뿐 아니라 대사적으로 밀접하게 연관된 비타민 영양상태의 biomarker로서도 그 영향력이 크다고 할 수 있다. 따라서 성별에 다른 다양한 연령집단에서 건강한 일반인과 심혈관계 질환자 등을 대상으로 호모시스테인과 비타민 영양상태에 대한 연구가 체계적으로 이루어 져야 할 것이다.태를 보다 효율적으로 증진시킬 수 있는 대안이 마련되어져야 한다고 사료된다.$\ulcorner$순응$\lrcorner$의 범위를 벗어나지 않는다. 그렇기 때문에도
Journal of the Korea Institute of Building Construction
/
v.11
no.6
/
pp.567-575
/
2011
With the development of construction information, a computerization tool for architectural process control is a necessary tool. However, the reality is that the conditions and understanding of users are not sufficient to fully utilize such a tool. In particular, it was analyzed that the reason for the negative feedback from hands-on workers regarding the current process control information system is that there is a difficulty in accessing the system for users that are not process and planning experts, due to a lack of information and technical contents at the phase of control and planning prior to the process plan. Therefore, the demands of users and a direction for the improvement of a system in terms of optimizing process control computerization were investigated, with the aim of addressing the disadvantages of the existing system and developing a professional system that is specialized in the construction industry. Therefore, it is necessary to construct an integrated WBS (IWBS) that combines WBS with CBS, and subsequently, it is judged that the most important aspect is the integrated technology of compatibility and operation of data that is linked with OBS. The process information must then deal with the changing information; in other words, the amount of construction, construction cost, and the required construction period etc., by coding data into a 4-unit index, such as a project unit (WBS Level 1), a project facility unit (WBS Level 2), a management department unit (OBS Level 1), and a control manager unit (OBS Level 2). After that, it was found that it is necessary to develop a computer system to consistently integrate process information into a management department.
Korea Mechanical Construction Contractors Association
월간 기계설비
/
no.7
s.192
/
pp.44-49
/
2006
시공을 하다가 손해를 보았는데도 발주자 혹은 원도급업체에서 인정을 안해준다면 어떻게 해야 할까? “소송을 할까?”, “다음 공사는 어떻게 해. 그냥 손해보고 말지 뭐”, “아니야 그냥 넘어가기에는 너무 억울해” 설비건설업을 하다보면 누구나 한번쯤 이런 경험이 있었을 것이다. 이럴 경우 공정거래위원회에 문의 하거나 건설하도급분쟁조정협의회에 문의하다가 정 안될 경우 소송에 돌입한다. 소송의 경우 대법원의 최종 판결이 나기까지 2~3년은 고스란히 걸림은 물론 소송비용도 만만치 않다. 이렇게 기간이 길지 않고 가격도 저렴하면서 해결가능한 방법은 없을까? 물론 있다. 바로 대한상사중재원(원장 박삼규)이다. 올해로 창립 40주년을 맞은 대한상사중재원은 상거래 상의 분쟁이 일어날 경우 중재(仲裁)를 함으로써 법률적인 효력을 갖는다. 또한 전문가에 의한 정확한 판결과 함께 약 6개월 정도의 기간으로 신속한 처리를 장점으로 꼽는다. 중재판결(仲裁判決)은 법원의 확정판결과 동일한 효력을 가진다. 또한 이를 이행하지 않을 경우 법원의 집행판결로 강제집행이 가 능하다. 그러나 계약서 체결시“중재조항”을 삽입해 두어야 중재에 의한 해결을 하 수 있다. 따라서 설비건설업계도 앞으로 원∙하도급 계약체결 시 중재조항을 넣어두는 것을 명심해야 한다. 본지는 이번 호에 대한상사중재원의 중재에 대하여 게재하고, 8월호에는 건설하도급분쟁조정협의회를, 9월호에는 공정거래위원회를 게재할 계획이다.
This paper is concerned about applying the AHP(Analytic Hierarchy Process) for a priority analysis of equipment operation plan to improve productivity of the container terminal in Gwangyang port. In this study, main elements of container terminal are assumed as into yard equipment area, transport equipment area, berth equipment area and C/Center area. A questionnaire is used to collect the opinions of equipment operating department and operational planning department. On the whole, the result of the analyses reveals that the most important area is yard equipment area. Examining each department is responses, equipment operating department preferred the C/Center area to other areas, on the other hand, operational planning department preferred yard equipment area. The result of this study suggests some guidelines for deciding priority of operation plan in the container terminal.
Kang, Sang Hyeok;Baek, Kyeong Geun;Baek, Hyeon Gi;Seo, Jong Won
KSCE Journal of Civil and Environmental Engineering Research
/
v.30
no.6D
/
pp.631-639
/
2010
The layout of haul routes within a construction site of large complex projects needs to be carefully determined as the productivity of earthwork activity heavily depends on the efficiency of the layout and the routes are not likely to change once they are settled. This paper aims to provide a construction planner with a reliable framework to create an efficient layout of haul routes within a large complex construction site. To construct the framework, five factors affecting haul route layout and the productivity of earthwork activity are described along with the associated rules of thumb recommended by design and field experts. In addition, a methodology based on spatial analysis using raster format in GIS is proposed to further increase haul route efficiency. The proposed planning framework enables a construction planner to easily find a more reliable route layout by thoroughly considering the key factors prior to setting up an earthmoving plan.
Journal of the Korea Institute of Building Construction
/
v.10
no.6
/
pp.27-38
/
2010
Considering the similarity in legislation and long-term industrial trend of Korea and Japan, continuous attention to the Japanese situation is useful for the development of a domestic construction strategy. In order to compare the current on-site construction management practice of the two countries and analyze the reasons for discrepancy, a literature review, expert interview, and site investigation were executed. A detailed survey of experts with experience in both countries revealed that overall, Korea's level of competitiveness is gaining on that of Japan. However, the Japanese construction industry was still evaluated as maintaining higher competitiveness, due mainly to comprehensive planning for operation, well-established design documents, and effective total quality safety environment management, all of which are combined with institutional support and a cooperative attitude by labor. Adjustments should be made for advanced technologies considering the attributes of a typical Japanese construction prior to establishing and implementing application strategies according to the suggestion of experts. Based on the results of this study, a benchmarking of Japanese strength should be conducted, and this is eventually expected to contribute to establishing green construction, enhancing safety, improving culture, and reinforcing the capabilities of participants.
Proceedings of the Korea Water Resources Association Conference
/
2011.05a
/
pp.195-195
/
2011
국가하천의 주변지역을 체계적이고 계획적으로 조성 이용하여 난개발을 방지하고 지속가능한 발전을 도모하며, 그에 따른 이익을 하천의 정비 및 관리 등에 활용함으로써 공공복리의 증진에 기여함을 목적으로 하는 친수구역활용에 관한 특별법이 곧 시행될 예정이다. 친수는 단순히 하천 보전과 상대되는 수변이용의 측면이 아니라 하천의 경관, 생태계, 물 등 전체적인 하천공간에서 이루어지는 인간의 활동과 심리적 만족감으로 해석할 수 있다. 이러한 친수활동 유형을 정립하기 위하여 전문가 및 실무자들의 도움으로 설문지를 작성하고, 조사하였다. 또한 평가 항목간의 중요도를 합리적으로 부여하고자 전문가 집단 활용을 통한 다기준의사결정 기법 중 계층분석과정 AHP(Analytic Hierarchy Process)와 이의 일반적인 형태인 ANP(Analytic Network Process) 기법을 이용하여 비교 분석하여 보았다. AHP는 의사결정의 목표 또는 평가기준이 다수이며 복합적인 경우, 다수의 속성들을 계층적으로 분류하여 각 속성의 중요도를 파악함으로써 최적 대안을 선정하는 기법으로 다수의 목표, 다수의 평가기준, 다수의 의사결정주체가 포함되어 있는 의사결정 문제를 계층화하여 해결한다. 그러나 의사결정 문제는 대부분 요소들 간의 수평적 상호작용과 수직종속성이 존재하기 때문에 단순히 계층적 구조만으로는 설명할 수 없는 경우가 있다. ANP는 AHP 분석을 확장한 개념으로 평가 요소가 계층구조를 가지고 있으면서 각 평가 요소간 네트워크 구조를 가지는 경우에 해당한다. 즉, 시스템 분석, 통합 및 조정을 위한 방법으로 요소들 간의 비선형 관계를 모델화하는 복잡한 의사결정에 적용이 가능하다. ANP는 AHP의 기본 공리인 독립성이 유지되지 않을 때도 적용할 수 있는 의사결정 방법이기 때문이다. AHP와 ANP 분석을 위해 평가기준은 하천특성, 생태환경특성, 인문환경특성, 경관, 유지관리 등으로 분류하였으며, 세부평가항목은 하천의 물리 생태학적 특성, 개발여건과 관련된 특성, 경관의 이용가치, 유지관리 용이성 등 20여 개로 나누었다. AHP와 ANP를 이용하여 친수공간 이용지수 가중치를 산정한 결과, 두 기법은 큰 차이를 보이지 않았다. 그러나 ANP를 이용하여 가중치를 결정하는 방법은 최종 결정의 공정성이나 신뢰성을 확보하는데 기여를 하는 것으로 나타났다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.