• Title/Summary/Keyword: 공업화 건축 공사

Search Result 10, Processing Time 0.029 seconds

Building construction process improvement using prefabricated materia (공업화자재의 활용을 통한 공정합리화)

  • Yoon You-Sang;Lee Hyung-Soo;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.1 s.13
    • /
    • pp.90-96
    • /
    • 2003
  • The purpose of this study is to present an improvement building construction process by using prefabricated materials. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Non-value adding activities were found at existing slab form work process by current state mapping(CSM) 2) Future state mapping(FSM) suggest process Integration to slab form work. 3) Slab form work is analyzed reduction time-cost by prefabricated material. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction and application of prefabricated material should be increased.

Application of Tilt-Up Construction Method for Building Single-Family house (단독주택의 구조체 공사에 있어 Tilt-up 공법의 현장적용)

  • Jeon, Se Mi;KIm, Myeong Gil;An, Youn-soo;Sho, Kwang-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.05a
    • /
    • pp.136-137
    • /
    • 2015
  • Tilt-up construction is the method that the wall structures are fabricated horizontally on site and placed at specified location using heavy lifting equipment. Tilt-up method generally has several advantages, such as of productivity improvement, labor savings, shortened the construction period the and cost savings. In this study, Tilt-up method is used for wall construction of detached house. Result shores the substantial improvement on construction period. The use of Tilt-up method led construction period reduction of 20%.

  • PDF

A Study on Duration Calculation Method for Eco-Friendly Remodeling Demolition Work Using Productivity Analysis (생산성 분석에 기초한 친환경 리모델링 철거공사 기간 산출 방안)

  • Woo, Joong-Pyung;Cha, Hee-Sung;Kim, Kyung-Rai;Shin, Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.1
    • /
    • pp.124-132
    • /
    • 2013
  • An influx of the population to the city has soared due to industrialization. As times go by, cities become densely populated so Korean government started to construct a number of buildings including apartment housings. Because they have become functionally, structurally, esthetically deteriorated over the past two decades. some improvements are needed. There are mainly two ways to improve old buildings: remodeling and reconstruction. Between the two, the first one is more popular as it is less time-consuming and more eco-friendly. Demolition work comes first for both of them and it should not give negative effects since it is regarded as a CP(Critical path) in the overall process. For this reason, a thorough construction management must be done. The reality, however, demolition is managed by the construction manager's experiences and decisions. If the key factor of demolition which is the planning of manpower and machine equipment, is determined by unscientific and subjective judgments, its period and risk also will increase. In particular, eco-friendly demolition can be more risky because it's been rarely conducted. Therefore, scientific and objective ways of demolition management are needed. In this context, this paper aims at analyzing productivity in each process of demolition focusing on manpower and machinery equipment which are the main parts of demolition assuming that the demands of eco-friendly remodeling demolition projects will be increasing. At the same time, by estimating working period through the output, this paper would be helpful to set up the plans for overall project in earlier stage.

Analysis of BIM Utilization for On-site Construction Planning in Modular Construction Project (모듈러 건축공사의 현장시공계획수립을 위한 BIM 활용성 분석)

  • Lee, Myung-Do
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.3
    • /
    • pp.263-272
    • /
    • 2019
  • Building Information Modeling (BIM) and modular construction are regarded as important technologies that have contributed to advancements in the construction industry. However, the utilization of BIM in current modular construction projects is limited; moreover, there are no specific guidelines pertaining the applications of BIM in modular construction projects. Therefore, this study aims to analyze the utilization of BIM for onsite construction planning in modular construction projects. First, a realistic BIM application was selected through literature review and expert interviews. Then, the construction plan of the modular projects was analyzed to classify the BIM application items into five different categories. The utilization of BIM in each category was then analyzed in terms of necessity and efficiency using a questionnaire. Finally, the BIM Utilization Index (BIM UI) was suggested based on the findings of the survey. As a results, the BIM UI for module point details, lifting plan, other installation details, site layout plan, and schedule plan was 0.811, 0.787, 0.770, 0.729, and 0.699, in the descending order of usability. In addition, through the findings of the study and interviews with experts, a case study for implementation of BIM in modular construction plan was conducted. The results of this study can be used as application guidelines for BIM in future modular construction projects.

Development of a Modular Building System for the BOQ Using Six-sigma (식스-시그마를 이용한 군 독신자 숙소용 모듈러 건축 시스템 개발)

  • Cho, Bong-Ho;Lee, Jae-Sung;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.6
    • /
    • pp.89-99
    • /
    • 2010
  • Military Barracks and Bachelor Officer's Quarters are public buildings representing architectural characteristics with repeating the same room modules. These buildings require easy dismantling and reusing for the next generation' military re-organization. For these reasons, since 2005, the modular construction has been applied to military buildings. The most important factors required for modular military buildings are standardization, lowcost construction and reusable construction method. However, conventional modular building system have not been matched with these requirements. This study suggests a new modular system for Bachelor Officer's Quarters using Six-sigma design tool. To reflect the voices of customers, market study and surveys were carried out. Through the QFD, the voices of customers were converted into quality characteristics of building system for BOQ. The various design concepts meeting customer's requirement were derived by the QFD and Pugh matrix methodology. The proposed modular building system shows 80% increased factory production rate and 62% decreased weight of steel frame as compared with the conventional modular building system.

A Study on Development of Construction Standard Production Rates and Cost Analysis for Off-Site Construction (OSC)-Based PC Structure Construction Costs - Comparison with RC Method - (OSC기반 PC구조 공사비 산정을 위한 품셈개발 및 공사비 분석 - RC공법과 비교 -)

  • Lee, Hansoo;Lee, Chiho;Han, Heesu;Lee, Jeongwook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.2
    • /
    • pp.56-68
    • /
    • 2024
  • A construction standard production rates system for the factory built and on-site installation phases of OSC (Off-Site Construction)-based precast concrete (PC) structures in apartment buildings was recently proposed to establish an objective cost standard (Lee et al., 2021). In addition, the Korean government has taken steps to improve the institutional foundation for the systematic calculation of PC construction costs such as revising construction standard production rates for major components that can be applied to the on-site installation phase of PC method. In this study, we analyzed the results of a field survey of apartment building PC structures and collected expert opinions to develop factory-built and on-site installation standard production rates that can be applied to apartment building PC method. We also propose directions for improving the standard production rates so that they can be applied to the site and component of apartment buildings by comparing them with the current standard production rates. This study also derived the cost characteristics and cost reduction measures of PC construction by calculating the construction costs using the developed rates and comparing the construction costs with the RC methods of apartment buildings of the same scale. The construction standard production rates for PC construction derived in this study are expected to contribute to the spread of PC construction by ensuring the objectivity and consistency of the results of PC methods cost estimation.

A Study on Fire Facilities of Urbane Buildings (도시건축물의 소방시설에 관한 연구(I))

  • 김소수
    • Fire Science and Engineering
    • /
    • v.6 no.2
    • /
    • pp.15-24
    • /
    • 1992
  • 우리나라는 1960년대의 경제개발계획에 따른 공업화 시축의 추진으로 산업의 발달과 경제성장은 인구를 도시로 집중시키면서 도시건축물은 대형화, 고층화, 과밀화 현상을 가져왔다. 한편, 국민생활의 향상과 산업활동의 다양화로 화재발생의 주요원인이 되는 전기, 가스, 유류등의 사용량이 해마다 늘어나고 있어 화재의 위험을 가중시키고 있다. 최근 10연간('81~'90) 전국에서 발생한 화재사고는 9만 5,154건이 발생하여 인명피해 1만1,117명, 재산피해 1,859억 2,200만원의 많은 손실을 가져 왔으며, 이 중에는 서울에서 발생한 화재가 3만6,089건으로 전체의 37.9%을 차지하고 있다. 화재가 발생할 경우 대형 참사를 방지하고 귀중한 인명피해는 물론 경제적 손실을 최저로 줄일 수 있는 소방시설을 도시건축물에 설치하여 이에 대비하는 것이 무엇보다 귀중한 일이다. 이는 화재예방 또는 발생 초기에 이를 감지, 통보하고 피난하며 소화활동에 이르는 모든 방재 및 소화를 위한 소방시설의 유용성을 최대로 발휘할 수 있기 때문이다. 본 논문에서는 서울특별시를 중심으로 도시건축물에 설치된 소방시설의 유지 관리 실태와 화재시 소방시설의 이용실태를 분석하여 문제점을 도출하고 이에 대한 개선방향을 제시하므로서 예방소방행정의 발전을 기하고저 하였으며, 그 내용을 요약하면 다음과 같다. 제1장에서는 서론부분으로서 연구의 목적과 범위및 접근 방법을 서술하였고, 제2장에서는 도시소방행정의 특성 및 소방환경의 변화로 먼저 소방행정의 의의와 도시소방행정의 유형으로 예방소방과 진압소방 그리고 구급.구조업무등을 살피고. 도시소방환경변화에 따른 화재발생추세를 살펴 보았다. 제3장에서는 도시건축물에 설치하는 소방시설의 설치.유지 및 이용실태를 검사.분석하였다. '90년도 서울시내 소방서에서 실시한 소방대상물에 대한 소방검사와 방화관리자에 대한 설문조사를 실시하여 소방시설의 유지관리실태를 통계.분석한 결과, 소방시설이 양호한 소방대상물은 전체의 75.9%이며, 불량소방대상물은 24.1%로 나타났다. 그리고 화재가 발생한 소방검사대상물에 대한 화재현장 조사결과 화재시 소방시설을 사용한 소방대상물은 전체의 72.1%를 차지하고 있다. 제4장에서 는 소방시설의 문제점으로 \circled1 소방설비부실공사, \circled2 소방시설 유지관리능력부족, \circled3 소방검사제도 불합리등이며, 이에 대한 개선방향으로 \circled1 소방설비 시공자의 지도. 감독강화, \circled2 자체시설관리능력향상, \circled3 예방소방행정제도의 개선을 제시하였다. 제5장은 결론으로, 우리나라가 최근 경제성장과 산업의 발달로 도시건축물의 화재발생 위험이 가중되면서 이에 대한 소방안전대비책이 요구된다. 이에는 도시건축물에 방화시설과 소방시설을 완비하고, 그리고 자격있고 유능한 방화관리자 선임하여 자체 소방계획을 수립하여 시설점검, 정비와 유지관리를 철저히 한다면 어떠한 화재도 예방 또는 초기에 진압할 수 있고, 또한 입주검자에 대한 소방교육 및 훈련을 지속적으로 수행하여 나간다면 여하한 도시건축물의 소방안전도 그 목적을 달성하리라고 생각한다.

  • PDF

Application Effect Analysis of The Modular Construction Method in The Extension Works (저층 교육시설 증축공사에서 모듈러 공법의 적용효과 분석)

  • Kim, Hakcheol;Shin, Dongwoo;Cha, Heesung;Kim, Kyungrai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.6
    • /
    • pp.101-111
    • /
    • 2015
  • The modular construction method has been getting more attention followed by global eco-friendly trend as the domestic construction industry has focused more on remodeling and extension work. The modular construction method is an industrialized construction system which is not likely as the existing construction method it manufactures more than 70% modules at the factory then assembling can be completed in a short amount of time on site. The modular construction method has various strengths; shortening of construction period by on-site work decrease, weight pressure reduction by usage of light steel frames and cost saving by repetitive manufacturing. However, it is currently not expanded due to the existing commercialized construction method. Therefore, this research is in order to help the related authorities make decisions to select the construction method and motivate expansion of modular construction method which can be utilized effectively in the extension works. The intention of this research is to stress differentiation from other construction methods in construction period, construction expenses, labor and forces by comparing and analyzing actual cases, to inform competitiveness of modular construction method by concrete effect analysis and to support adoption of the modular construction method into the domestic industry.

Flexible Unit Floor Plan of Off-Site Construction Housing Considering Long-Lasting Housing Certification System (장수명주택 인증을 고려한 OSC공법 주택의 가변형 평면계획 연구)

  • Lee, Ji-Eun;Roh, Jeong-Yeol;Kwon, Soo-Hye;Kim, Seung-Mo
    • Land and Housing Review
    • /
    • v.12 no.4
    • /
    • pp.103-117
    • /
    • 2021
  • With the current rapid changes in population and technology, the long-lastig housing certification system is a means of prolonging the physical and functional lifespan of a building. The certification requires differentiation between the structure and infill elements to allow for variability and ease of repairs. This works well with prefabricated houses so this study investigated the possibility of applying the long-lastig housing certification requirements to apartment construction using off-site construction (OSC) methods focused on the installation of bathrooms (plumbing and toilet) that differ from the traditional wet method. This study examined three different sized floor plans at 22 m2, 46 m2, and a combined one resulting in 69 m2. The larger 69 m2 plan utilized a removeable non-load bearing wall to increase flexibility in the layout of the floorplan. The apartments are constructed of steel reinforced concrete composite columns on a 9 m × 10.5 m grid with integrated slabs. The exterior and interior infill walls are all non-load bearing with some containing plumbing. This separation of the structure and infill walls can help meet some of the criteria in the long-lastig housing certification, particularly with the ease of repairs. Technologies that facilitate the replacement of infill elements that contain plumbing and other building services can benefit the nation by reducing carbon emissions and therefore tax incentives should be introduced to increase the adoption of the proposed construction methods.

A Basic Study for the Integrated Managment of the Production Transportation, and Installation of Precast Concrete Panels (P.C.부재의 생산, 운송 및 시공부분의 일체화된 관리를 위한 기초연구)

  • 조건희;김재준
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1994.10a
    • /
    • pp.415-422
    • /
    • 1994
  • Recent new town construction project proouced large numbers of apartment houses using precast concrete (P. C.) panels. l'bst construction companies involved in this project put their management focus on to the individual control of P.C. panel producing plants and the job sites. Little attention was paid to the integrated management of the production. transportation. and im;tallation of P. C. panels. Numerous job site delays experienced in the new town project were largely based on the poor coordination between these three key disciplines of the P. C. apartment construction. This stlldy was initiated with an .intention to improve coordination between these disciplines. Activities of these disciplines were identified and related data were gathered. This was performed through the interv:iews with the personnel involved in P. C. constructlon and through the analy::;is of the related documents and publications. Based on this information. the authors are nolol developing a model IoIhich will provide a foundation for opt:iJnal.ly coorc.inated control of the proouction. transportation, and installation of P. C. panels for apartment construction. In this paper. the authors briefly present intermediate results of this study.

  • PDF