A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

A Comparative Analysis for the Awareness of the Integration of Korea's Port Authorities (우리나라 항만공사 조직구성원들의 통합의도에 관한 비교연구)

  • Ha, Myungshin
    • Journal of Korea Port Economic Association
    • /
    • v.28 no.3
    • /
    • pp.1-25
    • /
    • 2012
  • In order to solve the current problems and inefficiencies within the Port Authorities (PA) in Korea, this study introduces the concept of the integration of PA and analyses the awareness of intention of integration. This study is based on analysing the surveys conducted by the members of PA. This research shows that there were different perceptions on the autonomy, business strategy intension, information sharing efficiency, competition, environment and technique change, capital finance, easy finance risk, curtailment of expenditure, personnel management efficiency in PA. Results of the study indicate that YGPA has more clear understanding on the awareness of integration of PA than other PAs. The results of this research will serve as a basic literature for further studies on the integration of PA in Korea. Moreover, the problems that have been identified and analysed in this study will contribute to establishing the strategy for further development of PA in Korea.

건설공사 추락재해의 공정별.피재자별 원인분석

  • 이규진
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2000.11a
    • /
    • pp.399-404
    • /
    • 2000
  • 건설업은 제조업에 비해 재해로 인한 사망률이 높은 산업이다. 대부분의 건설공사는 제조업과는 달리 고정된 생산현장이 아닌 단품수주에 의한 1회성 현장생산에 의존하고 있으므로 안전관리가 체계적으로 이루어지지 못하고 상황에 따른 임기응변적인 경우가 많다 또한 안전시설물의 설치도 매회 공사시마다 새로이 설치해야하므로 시간적ㆍ경제적 이유로 인해 소홀히 취급되기 쉽다. 건설재해에 대한 책임은 일차적으로 건설업자에게 부가되지만 건설공사 작업자의 안전에 설계자도 중요한 영향을 미친다./sup (4)/ 따라서 설계시에는 건설공사의 안전을 고려하여야하며, 공사계획시에는 공사안전관리의 대상을 명확히 해야 한다.(중략)

  • PDF

안내-"공사대장 통보 잊지 마세요"

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.6 s.203
    • /
    • pp.44-48
    • /
    • 2007
  • 건설공사 도급계약을 체결한 건설업체는 건설산업기본법 제22조 제3항에 의하여 건설공사에 관한 사항을 기재한 "건설공사대장"을 주된 영업소에 비치하도록 되어 있다. 건설공사를 도급받은 건설업자(수급인)은 건설산업지식정보시스템의 서브시스템인 건설공사정보시스템(Construction Work Information System)을 통하여 건설공사대장을 작성하고 발주자에게 그 내용을 통보할 수 있고 발주자는 그통보 내용을 확인할 수 있다. 자세한 내용은 다음과 같다.

  • PDF

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

A Study on the Efficiency of Earned Value Management System for Practical Application (공정${\cdot}$공사비 통합관리시스템의 실무적용 효율화 방안)

  • Lee Woo-Sik;Kang Leen-Seok
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.500-503
    • /
    • 2003
  • Considering that our construction market is recognizing the necessity of EVMS(Earned Value Management System) and that the EVMS will be applied to the construction projects with large scale. the suggested methodologies to link WBS(Work Breakdown Structure) with EVMS results and the developed web-based EVMS can be a tentative system for practical application.

  • PDF

정보통신공사비지수 개발에 관한 연구

  • Kim, Tae-Gyun;Jo, Hun-Hui;An, Cheol-Mo;Gwak, Jeong-Ho;Seo, Sun-Seok;Kim, Yeong-Sam;Kim, Seo-Gyeong;Kim, Jin-Ho
    • Information and Communications Magazine
    • /
    • v.29 no.7
    • /
    • pp.89-96
    • /
    • 2012
  • 정보통신공사의 공사비 산정은 그동안 원가계산 방식으로 이루어져 왔으나, 최근 들어 건설 및 전기분야에서와 같이 실적공사비를 활용할 수 있도록 제도 시행을 추진하고 있다. 그러나 실적공사비를 적용하기 위해서는 과거 공사비 실적자료를 현가화 할 수 있는 지수의 개발이 전제되어야 함에도, 그동안 정보통신공사는 한국건설기술연구원의 통신공사비지수(기타 특수건설의 최하위지수)나 한국은행의 생산지물가지수를 이용할 수밖에 없는 한계를 지니고 있었다. 이에 본 연구에서는 실적적산 데이터를 기반으로 정보통신공사의 특성을 고려한 정보통신공사비지수를 제시하고자 한다. 개발된 지수는 실적공사비 자료의 현가화 뿐 아니라, 물가변동에 따른 계약단가 조정(Escalation), 정보통신분야의 거시적인 동향을 파악할 수 있는 주요 지표로 정보통신공사의 사업비산정 및 관련 분야의 기초자료로 활용될 수 있다.

이슈 & 이슈 - 민간 건설공사 대금지급 공정성 확보 방안

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.274
    • /
    • pp.52-60
    • /
    • 2013
  • 종합건설업체 10곳 중 4곳은 민간건설공사를 완공하고도 대금을 받지 못한 경험이 있는 것으로 조사됐다. 한국건설산업연구원은 지난해 9~10월 종합건설업체 254개사를 대상으로 민간 건설공사 불공정시태를 조사한 결과 공사 완공 후 대금을 수령하지 못한 곳은 전체의 39%로 나타났다고 밝혔다. 공사대금 미지급 원인으로는 수급자의 57%가 발주자의 지급 의지 부족과 도덕적 해이를 꼽았다. 건설산업연구원은 이같은 내용을 지난 1월 발표한 '민간 건설공사 대금 지급 및 공정성 확보방안 보고서'를 통해 밝혔으며, 민간 건설공사 도급계약 수행 과정에서 발생하는 발주자의 불공정을 개선하고 수급인의 공사대금 확보를 위한 제도적 장치 마련과 함께 건설산업의 선진화 및 경제 민주화를 달성해야 한다고 주장했다. 본지는 대금지급 지연 등 불공정 행위가 만연한 가운데 우선 원도급의 실태를 알아보기 위하여 건산연이 발간한 '민간 건설공사 대급 지급 및 공정성 확보방안 보고서 내용을 간추려 게재한다.