• Title/Summary/Keyword: 공사정보분류체계

Search Result 95, Processing Time 0.032 seconds

Development of Cost Estimating Model Using Quantity Variation Analysis by Influence Variables for the Schematic Design Phase (영향변수에 따른 수량변화 분석을 이용한 기본설계단계의 개산견적 모델 개발)

  • Son, Bo-Sik;Lee, Hyun-Soo;Kim, Sung-Tae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.155-166
    • /
    • 2007
  • The purpose of this research is to develop a conceptual model and prototype that establishes a new approach for building cost estimating in the schematic design phage. This research use the method that analyzes quantity and unit price separately to enhance schematic cost estimating through conducting literature review andi analyzing existing schematic cost estimating methods. In addition, this study proposes tile concept of cost breakdown structure including two more classifications: building element and floor compared to existing one only classified by trade. Thus, a Quantity Based Active Schematic cost Estimating(Q-BASE) model is developed founded on those two concepts. By applying proposed schematic cost estimating model, historical structure cost of residential complex building project is analyzed, and then, based on this analysis, prototype is implemented.

A Study on Design of Metadata Management Demonstration System for damage prediction from storm and flood (풍수해 피해예측지도 메타데이터 관리 시범 시스템 설계에 대한 연구)

  • Lim, So Mang;Baeck, Seung Hyub;Hwang, Eui Ho
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2017.05a
    • /
    • pp.472-472
    • /
    • 2017
  • 재해로 인한 피해가 급증함에 따라 이를 예방하기 위한 풍수해 피해예측의 필요성이 증가하였고 관련된 다양한 연구가 진행되고 있다. 타 부처 및 각 지자체에서는 각종 재해지도들을 작성하여 만들어진 재해지도는 작성 유형과 방법 등에 따라 다양한 데이터와 서로 다른 정보를 포함하고 있어 데이터 정보를 표준화 시키고 필요한 정보를 효율적으로 찾아 연계 활용하기 위하여 본 연구를 수행하고자 한다. 메타데이터란 데이터에 대한 정보를 의미하며 데이터 변화의 근원과 변화의 흐름을 말한다. 메타데이터 관련 표준으로는 ISO19115(국제표준), KSXISO19115(국가표준), TTAS.KO-10.0139(유통목록 표준), TTAS.IS-19115(관리용 표준)이 있다. 본 연구에서는 국제표준을 준용하여 풍수해 피해 예측지도의 체계적 관리를 위한 메타데이터 설계 및 관리 시스템 구축 방안을 제시하고자 하였다. 풍수해 피해예측지도 메타데이터 관리 시범 시스템 구축을 위한 표준, 정보의 특성, 사용자 수준 등을 고려하여 설계 기본방향 설정하였으며, 풍수해 피해예측지도 정보 메타데이터 표준안 수립에 반영하였다. 그 결과, 메타데이터 패키지는 총 9개의 섹션(클래스)으로 구성하여 정의하였고 하위개체를 설정 및 연계하여 메타데이터 개체셋 정보를 구성하였다. 풍수해 피해예측지도 메타데이터 관리 시범 시스템 설계 제시를 위해 DB항목 조사 및 도출, 데이터 연계 활용 모델 구축, 프로토타입 개발순으로 연구를 수행하였다. 또한 표출 대상 데이터 항목별 분류, 방재활용 단계, 지역구분 등을 주제로 데이터 Mapping 자료를 작성하였고, 설계 기본 방향에 의하여 설정된 기준으로 데이터 항목별 메타데이터 DB를 작성하여 풍수해 피해예측지도 메타데이터 관리 시범 시스템을 설계하였다. 본 연구 결과는 추후 풍수해 피해예측지도 표준 데이터 및 풍수해 피해예측지도 표준 데이터 모델 구축에 활용 가능하며 표준화 연계활용을 위한 연구에 기여할 것으로 판단된다.

  • PDF

A Study on the Improvement of NCS for Cadastral Field (지적분야 NCS 개선에 관한 연구)

  • Seo, Yong-Su;Lee, Young-Jae;Choi, Seung-Young
    • Journal of Cadastre & Land InformatiX
    • /
    • v.45 no.1
    • /
    • pp.45-58
    • /
    • 2015
  • The Korean government strives to transform the society from one that stresses academic and qualification to one that stresses individual competencies. National Competency Standards(NCS) has been adopted to this end. However, NCS classifies cadastre into a group with survey and spatial information collection. Such classification limits cadastre to encompass cadastral administration, cadastral survey, geospatial survey, etc. This study reviews current status and implications of NCS, and proposes few solutions: improvement of classification system, introduction of cadastral industry cooperation model, curriculum development based on competency level, unification between NCS developer and learning module writing group, etc.

Prototype-based Cost Estimating Model for Building Interior Construction in Design Development Stage (프로토타입기반 기본설계단계 건축마감공사비 산정 모델)

  • Kim, Hae-Gon;Park, Sung-Chul;Hong, Tae-Hoon;Hyun, Chang-Taek;Koo, Kyo-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.110-118
    • /
    • 2007
  • For deciding the owner's budget of the building construction in the predesign stage, the probabilistic methodologies for estimating the cost are often studied, however these parameter-based conceptual estimating methodology has limitation of applying it to the practical business because it hardly can link the design decision-making and the cost estimating and control. Besides if the result of detail estimating after detail design is over the budget, locally and arbitrarily control the level of interior design and fix the design. This research proposed the prototype-based cost estimating model for building interior construction which leads to estimate the interior cost easily linking with design decision-making and supports to evaluate the design alternatives in the schematic design and the design development stage for office buildings. The model divides the building on the design process by Element Breakdown Structure and presents the design alternative by selecting the elements of each room from the database accumulated the historical office buildings' prototypes and estimates the cost. The 2 case studies presented to validate the effectiveness of as the linking tool integrating the design and construction data and applicability to the practical design on the presented prototype-based model.

The Implementation of Web-based Defect Information Feed-Back System for Construction Management in the Construction Process -Focused on Apartment Houses- (시공단계의 효율적 공사관리를 위한 Web기반 하자정보 Feed-Back시스템 구현방안 - 공동주택을 중심으로 -)

  • Cho Yong-Min;Park Tae-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.482-485
    • /
    • 2002
  • The boom of housing market lead to build a lot of apartment houses concentrated on the metropolitan area and developing new city in 1980's made 2,000,000 houses. In this time, quality standards could not be satisfied with consumers' desire due to the policy about excessive supply and come from unexpected defects in the complected buildings. In $1980's\~1990's$, It would be performed on the study for defect prevention in apartment houses. It has contributed in no way to the reduction at the rate of the defect outbreak and the solution of consumers' dissatisfaction by flaws. The reason is that the study related defects is not linked and applied by the managing and controlling system, Therefore, the study will be analyzed out defect information occurred on apartment houses of domestic construction and classified by type features. As a result, it will suggest web-based feed-back system for getting systematic information and the practical use.

  • PDF

Development of 4D System based on New Methodology for Visualizing Construction Schedule Data for Civil Engineering Projects (토목시설물 공사관리 시각화를 취한 4D시스템 적용방안)

  • Kang, Leen Seok;Jee, Sang Bok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.95-103
    • /
    • 2006
  • One of the main functions of the 4D system includes visualizing numerical schedule data in construction. The existing 4D tools have an excellent function for simulating building projects that all activities are progressed according to vertical work zone. However, it is not easy to implement all of it in the civil engineering project because the construction activities of highway and railway projects are progressed on the horizontal work zone and the 4D simulation for those projects should include earthwork objects that depend on the natural ground condition. This study suggests a new methodology for improving those limitations of 4D system for the civil engineering project and develops a new system by the suggested methodology. To verify the developed system, this study attempts to simulate 4D object for horizontal elements such as earthwork, paving work and tunneling work. The morphing and multi-texturing techniques developed in the study can be new approaches to simulate 4D object for the earthwork such as cutting and banking whose activities are progressed on the natural ground condition. The research results can be expected as a draft function for improving the application of 4D system in civil engineering projects.

A Study on the Life Cycle Cost Analysis of Light Railroad Transit Bridges (경량전철 교량의 생애주기비용 분석에 관한 연구)

  • Lee, Du-Heon;Kim, Kyoon-Tai;An, Dong-Geun;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.384-389
    • /
    • 2006
  • The needs for Light Railroad Transit(LRT) have been increased due to the heavy traffic congestions in large cities like Seoul, Korea. Korean government is seeking the LRT system development (including planning, designing, construction, and maintenance and operations) in terms of public-private-partnership (PPP). At the private sector side, it is crucial to estimate the life cycle cost (LCC) to project the cash flow during the O&M period. Since the most construction and O&M cost of LRT project is at the bridge construction, a cost analysis model and a cost breakdown structures (CBS) on LRT bridges are discussed through in depth literature reviews. Construction and maintenance cost of bridges are collected and analyzed. LCC is analyzed by types of bridge superstructures and historical data of repair and rehabilitation (R&R) is investigated. There have been scarce number of LCC analysis on railway bridges. This research delivers a well-defined CBS and maintenance cost data, which will be a great benefit to the systematic maintenance strategy development for railroad bridges.

  • PDF

An Analysis of Critical Management Factors for Construction Failure on the Apartment Structural Framework using FMEA (FMEA 기법을 활용한 공동주택 골조공사의 건설실패 핵심관리요인 분석)

  • Oh, Chi-Don;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.78-88
    • /
    • 2012
  • Previous construction failure researches were focused on the utilization plan based on failure information and development of failure classification. However, it has limitation to set up the plan for prevention of construction failure due to the lack of the number of on-site staffs. In order to prevent effectively construction failure, a prevention plan should be established through quantitative evaluation of failure causes. The purpose of this study is to suggest the assessment method for selection Critical Management Factor(CMF) and to analyze the CMF on the apartment structural framework using FMEA(Failure Mode and Effective Analysis) which is one of the methods of quantitative evaluation. The element of risk evaluation separated degree of failure risk and prevention respectively. The assessment method for selection of CMF can be utilized for planning proactive solutions on the failure, and it can be also selected critical factors about each project phases, type of facility and construction work.

Selecting Optimum Management Practices according to Project Characteristics for Improving Project Performance (건설 프로젝트 특성에 따른 성과 제고가 가능한 최적 공사 관리기법 선정 방안)

  • Ko, Young-Jin;Cha, Hee-Sung;Shin, Dong-Woo;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.3-13
    • /
    • 2012
  • The importance of project performance management as an alternative for solving problems is rising, which are followed by the hardships of managing construction project in the construction industry. This research classifies and applies the improvements made by the operator's work, in order to apply factors of success on the construction project, as performance management factors. In addition, in order to predict the results reflecting the project characteristic of performance management factor un-improvable by the operator in the initial stage of construction, the effect of project characteristic to the performance was drawn by performance difficulty. Also, in order to improve the predicted performance, researches on setting valid best practices according to the performance territory through a correlation analysis between the best practices improvable through the operator's work, and the performance was made.

Procedure Development for Organizing Electronic Technical Manual of Construction Design Information and Applicability Analysis for Practical Project (건설공사 설계도서매뉴얼의 전자화 절차구성 및 실무 적용효과 분석)

  • Kang, Leen-Seok;Moon, Hyoun-Seok;Kwak, Joong-Min
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.2 s.39
    • /
    • pp.103-111
    • /
    • 2007
  • The existing design materials by document type are restricted in searching and acquiring necessary design information because the materials consist of huge information and various document types. This study suggests a methodology to develop an electronic technical manual that can manage construction design materials by XML-base integrated information system. Electronic technical manual for design materials can provide visualized information through various multimedia tools such as multi-link, virtual reality and animation. Using an integrated electronic manual for construction project can prevent to miss necessary design information. The results of this study includes a data flow diagram to develop an interactive electronic technical manual (IETM) for construction design information. Finally the study suggests some scenarios for practical use and quantitative analysis of application effect analysis by AHP method.