• Title/Summary/Keyword: 공사인력관리

Search Result 161, Processing Time 0.026 seconds

A Study on Cognition Analysis for Effective Management of Suspended Construction Building (공사 중단 건축물의 효율적 관리를 위한 인식 분석 연구)

  • Suhr, Myong-Suk
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.7 no.2
    • /
    • pp.131-137
    • /
    • 2019
  • The purpose of this study is to investigate the perception of buildings suspended from construction and to analyze the problems that are inherent and effective in the management of public officials and residents in the area where construction is suspended. There are 63 buildings in the Gangwon area, 16% of which are occupied by the whole area. 31% of the apartment houses are occupied the most, and 10 years or more is suspended. 241 of them accounted for 62%. In order to efficiently manage buildings that are suspended from construction, protection measures should be taken to ensure safety and prevent crime through periodic and continuous management of facility grade management that conforms to the special act on safety and maintenance of facilities. Effective support for budget and personnel is required for efficient management of construction suspended.

Current Status and Improvement Plan for Foreign Construction Laborer (외국인 건설 근로자 현황 및 개선방안)

  • Park, Hee-Sung
    • The Journal of the Korea Contents Association
    • /
    • v.15 no.9
    • /
    • pp.555-561
    • /
    • 2015
  • The construction industry is a labor-oriented and quality, cost, and schedule performance is effected by technicians. However, the construction industry have faced a labor shortage problem. Therefore, technician graying and no new workers inflow cause labor shortage and decline of worker's skill level. The utilization of foreign technicians instead of domestic technicians has been increased in the construction industry. This paper performed questionnaire survey for 43 managers on 14 project fields to determine the current status and problems of construction technicians and to propose a improvement plan. As a result, most foreign technicians are carpenters and iron workers, but the skill levels are generally lower than domestics. The major problems for foreign technicians are communication and non-skilled. Then, labor productivity and accident rates of foreign technicians are higher than domestics. This paper proposes that skill training programs, language lessons, and multi-cultural programs are effective to improve foreign workers' problems.

우물통 기초 교량공사 안전교육의 효율성에 관한 연구

  • 이정우;손기상
    • Proceedings of the Korean Institute of Industrial Safety Conference
    • /
    • 2003.05a
    • /
    • pp.223-228
    • /
    • 2003
  • 교량공사에는 여러 가지 기초공사 방식이 적용될 수 있다. 국내에서는 특히, 한강을 통과하는 교량에는 거의 대부분 우물통 기초를 채택 시공하고 있다. 이들 교량공사들이 진행되는 과정에서 계속 사상자들이 발생해왔다. 2001년 현재 서울시 건설안전 관리본부 자료에서는 1995년부터 총 00명을 기록하고 있는 것으로 나타났다. 서울시 건설안전관리본부, 각 유명 대형 건설사들의 건설안전팀들이 부단히 노력하고 있음에도 계속 발생되는 것은 어디에 있는가? 하나로 확정지어 답해질 수는 없는 특성이 있다. 건설회사 조직구성, 작업인력구성, 공정, 장비구성들이 관련 사항들일 수도 있지만 안전교육 또한 영향을 미치는 핵심요소라 할 수 있기 때문에 이 안전교육의 유효성 효율성에 관한 정확한 측정은 사고예방 그리고 년간 교육계획 등 사전계획에도 큰 영향을 주는 요소일 수 있다.(중략)

  • PDF

The Development of Construction Industry : It's Requisites and Strategies (건설산업의 성장과 발전의 전제조건)

  • Kim Jae-Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.195-201
    • /
    • 2002
  • 이 논문은 ${\lceil}$제2차 건설산업 진흥 기본계획의 기본과제와 중점과제을 검토하는 것이다. 우선 외환위기 이후의 건설 산업환경과 여건을 살펴보았고 이를 기초로 2차 기본계획이 수립되는 기간의 건설산업정책의 기본방향과 중점과제를 도출하였다. 그결과 건설산업 정책은 과거의 온정주의에 근거하여 건설산업을 구성하는 업체들의 형평성을 제고하는 것에서부터 경쟁에 근거한 효율성을 제고하는 것으로 전환되어야 하며 건설업체에 대한 엄격한 평가와 무제한적인 경쟁과 그리고 건설공사의 품질에 대한 무한 책임을 담보하는 국제기준(Global standard)의 건설산업이 형성될 수 있는 기반을 조성하여야 하고 이를 고려한 건설산업의 정책과제는 첫째, 건설산업의 효율성의 제고, 둘째, 국제규범의 건설체계의 구축, 셋째, 건설산업의 세계화 기반의 조성하는 것이고 이를 달성하기 위해서는 건설기술개발(정보화 포함), 건설인력육성, 건설공사 안전${\cdot}$환경 및 품질확보, 중소건설업 및 중소건설 용역업의 육성, 건설공사의 생산성 향상, 건설자재의 품질향상 및 규격표준화, 건설사업관리제도의 발전 등이 이루어져야 한다.

  • PDF

Instructor Fostering Program for Farmers' Water Saving Education (농민 물절약 교육을 위한 전문인력 양성교육 실시)

  • Lee, Seul Gi;Choi, Kyung Sook;Do, Jong Won;Lee, Gwang Ya
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2019.05a
    • /
    • pp.56-56
    • /
    • 2019
  • 우리나라는 최근 기후변화로 인하여 가뭄의 빈도와 강도가 점점 증가하고 있는 추세이며, 이에 따른 농업가뭄 현상은 매년 발생하고 있는 실정이다. 2000년 이후부터 무상으로 공급되고 있는 농업용수에 대해 농민 물이용 손실을 저감하고, 물부족에 대비한 선제적인 가뭄대응의 일환으로 물절약 교육 및 홍보를 통한 농민 물절약의 중요성 인식으로 2015년에 "농업농촌부문 가뭄대응 종합대책"에 농민 절수교육 및 홍보를 통한 물절약 추진 과제가 포함되었다. 농민 물절약 교육을 통한 농민의 가뭄에 대한 경각심과 물절약 실천의 중요성을 인식시키고, 농업인의 자발적인 물절약 실천을 통한 효율적 수자원 이용을 도모하는데 그 의의가 있다. 이에 따라 2016년 농민 물절약교육 모델이 개발되었으며, 2017년에는 물절약 교육 모델의 현장적용을 위한 시범교육이 실시되었다. 또한 "2018년 정부 가뭄종합대책" 중 가뭄대책 실천의 일환으로 물절약 교육 및 홍보실시 확대 추진을 위해 2018년도에는 2016년과 2017년에 실시한 농민 물절약 시범교육을 바탕으로 물절약 교육 모델의 실용화를 위한 농민 물절약 교육 전문인력 양성을 실시하였다. 본 연구에서 진행한 물절약 교육 전문인력 양성 프로그램은 농업용수의 물공급 및 관리기관인 한국농어촌공사 지사단위 유지관리 직원을 대상으로 하였으며, 전국적으로 경기 강원권, 충청권, 호남권, 경상 제주권의 4개 권역으로 나누어 상 하반기 교육을 실시하여 총 322명의 교육인력을 양성하였다. 전문인력양성 교육은 물절약 교육에 대한 전반적인 이해와 현장적용을 위해 농민 물절약 교육 이수단계별교육 내용 및 교육 방법을 이해하고, 각 단계별 교육을 직접 실습해 보는 시간으로 구성하였다. 교육 이수 후에는 교육생의 학습에 대한 이해도 및 교육 만족도를 조사하고 기타 교육에 대한 의견수렴을 위해 설문조사를 실시하였다. 그 결과, 교육생의 대부분이 농민 대상 물절약 교육의 필요성을 매우 공감하는 것으로 나타났으며, 물절약 교육의 지속적인 실천 및 전국적인 확대를 위해 별도의 예산 및 인력지원의 필요성을 강조하였다. 교육과정을 완료 후에는 수료증을 수여하였으며, 본 연구에서 개발한 물절약 교육의 현장적용을 위한 물절약 교육 강사용 교재를 배포함으로 본 교육을 이수한 전문인력의 농민 물절약 교육에 활용하도록 하였다.

  • PDF

Diligence and Indolence Management System for Specialty Contractor on Construction Site -Using GPS of Smart Phone- (스마트 폰의 위성항법시스템(GPS)를 활용한 전문건설업체 현장 근태관리 체계 구축)

  • Ahn, Chi-Sun;Yoon, Su-Won;Chin, Sang-Yoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.56-66
    • /
    • 2012
  • The Recent Specialty Contractor in construction of the reduced quantity due to the recession, but competitive in order to increase the number of companies that are increasingly competitive. The field work of one person to perform the work of employees and multiple sites, workforce supply flow that occurs at each stage of information transfer is not made a late staffing. Therefore this research has proposed a new alternative that can overcome them and the entire industry in recent issue smart phone features that take advantage of GPS(Global Positioning System). This paper presents a Diligence and Indolence Management System using GPS of smart phone. offering the advantage of Web-based PMIS(Project Management Information System) through integration with real-time information transfer and smart phone applications for query by building a prototype of a professional construction company as their own on-site management measures are proposed to contribute time and attendance.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

A Study on the Improvement of Safety and Health Activities in the Construction Contractor (Public Institutions) (건설공사 발주처(공공기관) 안전보건활동 수준향상에 관한 연구)

  • Ji-Hwan Moon
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.3
    • /
    • pp.624-633
    • /
    • 2023
  • Purpose: It Vas intended to identify problems and derive improvement plans by grasping the current status of safety management of public institutions among construction Vork orders. Method: By comparing the disaster status of public institutions compared to the total construction Vork, the analysis Vas conducted based on the results of the evaluation of the level of safety activities of public institutions Vith a high disaster rate and the results of actual consulting. Result: As a result of comparing and analyzing the current status of safety management of public institutions, the current status and problems of safety management in public institutions Vith a high accident rate Vere similarly discovered. Safety management organizations, document management systems, safety management systems, and risk assessment activities are operated Vithout reflecting the size and characteristics of the organization, so improvement in the relevant field is needed. Conclusion: Safety-related professionals and organizations should be formed according to the size of construction orders, and responsibility and authority should be clearly assigned. Since risk assessment is conducted formally to prepare a safety and health ledger, it is necessary to derive risk factors to prevent safety accidents for the actual construction. It is expected that the level of safety activities can be improved if it is improved by reflecting the size and characteristics of public institutions.

A Modern Interpretation of the Resources Required for the Construction of Paldal-mun in the Joseon Dynasty through the Analysis of HwaSungSungYouk-EuGye (화성성역의궤 분석을 통한 조선시대 팔달문 건설 소요자원의 현대적 해석)

  • Kim, Kyoon-Tai
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.6
    • /
    • pp.641-652
    • /
    • 2021
  • Although detailed information on the construction of Hwasung was recorded in the Hwasungsungyouk-eugye, analysis and evaluation from the perspective of modern construction management were limited. Therefore, in this study, construction management related information such as time, cost, and manpower was analyzed for Paldal-mun. The main work involved in the construction of Paldal-mun was foundation work and masonry work, and the total construction period was 6 months, with the overall construction progressing very quickly. The total cost of the construction of Paldal-mun was about 52,423 Nyong, which can be divided into about 15,9332 Nyang for materials and 36,4901 Nyang for labor cost. Converting these to present value, the material cost is about 1.1 billion won and the labor cost is about 2.5 billion won, and the sum of these is about 3.6 billion won. In the future, we plan to conduct additional research in this area such as deriving detailed input manpower related to the work period for each type of work.

열정! 건설현장을 찾아서 - 자율안전관리의 새로운 기준!, 티이씨건설, 명지대 자연캠퍼스 산학협력관 및 제2예체능관 신축공사현장

  • Yeon, Seul-Gi
    • The Safety technology
    • /
    • no.185
    • /
    • pp.16-18
    • /
    • 2013
  • 그동안 우수한 안전관리로 이름을 떨치는 건설현장은 주로 대형건설사가 시공을 하는 현장이었다. 중소현장의 경우 인력 및 재무상태가 대기업에 뒤처지다보니 안전관리에 소홀하다는 인식이 지배적이었다. 헌데 최근 이런 인식이 한낱 편견에 불과함을 여실히 보여주는 현장이 있어 큰 주목을 받고 있다. 그 주인공은 바로 중견 건설사인 티이씨건설이 시공을 하고 있는 '명지대 자연캠퍼스 산학협력관 및 제2예체능관 신축공사현장'이다. 이곳 현장은 고용노동부가 지정한 자율안전컨설팅 대상현장으로 체계적인 안전활동과 책임 있는 자율안전관리가 펼쳐지고 있다. 특히 이곳은 현장소장을 필두로 모든 현장 구성원이 적극 재해예방활동에 참여함으로써 '공생 안전'의 모범도 보이고 있다. 이곳이 이처럼 안전에 총력을 기울이는 이유는 시공 현장이 학교이기 때문이다. 즉 안전사고가 발생해 근로자는 물론 우리나라의 미래인 학생들의 몸과 마음에 해가 가는 일이 없도록 안전에 각별한 주의를 기울이고 있는 것이다. 빈틈없는 안전관리로 중견건설사의 저력과 신념을 보여주고 있는 이곳 현장을 찾아가 봤다.

  • PDF