An Empirical Analysis on the Presumption of Public Apartment's Construction Cost in Housing Land Development Project (택지개발사업의 공공주택건설공사비 추정의 실증적 분석)

  • Kim, Seong-Hee
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.81-88
    • /
    • 2011
  • Providers haven't recently had a flexible construction cost estimation system to meet various needs of consumers about public housing. So the subject of this study is to estimate construction cost reasonably in early project stage of public housing and then develop reliable means which is able to support construction cost management and establish a adequate funding investment plan as a provider. In this study, Regression analysis was performed by the case on 20 public apartment complex which were designed from the first half of 2007 to the first half of 2008. A total construction cost of construction, civil engineering, machinery, elevator, land scape, electricity and communication work was used as one sample for increasing explanation and representativeness of the case. In addition, The total construction cost which is devided into design, contract and completion cost was variously analysed for increasing relevance of model and actual utilization. The result of estimation model based on a total construction cost set up completion and design cost showed that error rate is within 2%, which is a excellent result. The estimation model of the construction cost developed by this study is expected to estimate approximate construction cost which is adjacent real construction cost in early stage of the project by using some data.

Automated Life-Cycle Management System Based on SCM for Super High-rise Buildings Construction (SCM기반 Automated Life-Cycle Management System 구축방안 - 초고층 빌딩 커튼월을 중심으로 -)

  • Yoon Jeong-Hwan;Kim Yea-Sang;Chin Sang-Yoon;Kim Chang-Duk;Choi Yoon-Ki;Chun Jae-Youl;Lim Hyung-Chul
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.430-433
    • /
    • 2003
  • Cost, schedule, quality are the essential parts of success of every construction project. It is especially true in high-rise building construction. Among the construction components in high-rise building construction, curtain walls are very important elements for the project success because they take large portion of cost and schedule. However, curtain wall construction process are very complicated, where many entities including designers, suppliers, contractors and even maintenance contractors are involved. Therefore, control and management of their relationships and production process are critical. It is suggested that this can be solved by the concept of Supply Chain Management which is supported by the automated information technology with Radio Frequency Identification. Such concept is defined as 'Automated Life-Cycle Management System Based On SCM' and this study suggests rode map to establish the system.

  • PDF

Development of a Cash Flow Forecasting Model for Housing Construction (공동주택 공사의 현금흐름 예측 모델 개발에 관한 연구)

  • Jang, Joo-Hwan;Kim, Ju-Hyung;Jee, Nam-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.3
    • /
    • pp.257-265
    • /
    • 2012
  • Many construction companies are simultaneously carrying out numerous projects in the housing construction industry. It is essential to accurately forecast the cash flow of a project through optimal process management and resource input in order to manage funds rationally and enhance the competitiveness of a company. Current cash flow forecasting methods offer lower accuracy due to a large gap between the revenue and expenditure element. Expenditure elements depends on the real-time changing actual cost for work performed. This research survey was conducted on the actual state of construction management of K company to investigate the problems of cash flow forecasting. To achieve this, the work process and construction management system were integrated to improve the cost management system of K company. To accurately forecast the cash flow of a project, revenue and expenditure elements were displayed in the total cash flow forecast window. This research is expected to assist in the implementation of a system of cash flow forecasting on housing construction by excluding negative elements of revenue and expenditure.

The State of Schedule Management and the Recognition of Duration Shortening (공정관리의 실태 및 공기 단축에 대한 인식정도)

  • Kim, Ja-Yeon;Kim, Eui-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.5
    • /
    • pp.87-94
    • /
    • 2010
  • Construction projects are based on the actual field, so if the construction schedule that is established in the construction plan is delayed or extended for various reasons, construction companies are vulnerable to claims, and thus strive to complete a building within the planned timeline by shortening the construction time. Therefore, this study surveyed technicians in apartment construction in Gwangju, and studied their perceptions of the actual conditions of process control, construction time needs, goals, and methods. The results showed that the organization of the process control department and professional employees was lacking compared to other regions. The need for construction time was perceived as high, while the reduction of the construction cost was perceived as low. Regarding the reduction goal, they perceived highly the preparation for the delay of construction time and various claims, and for the reduction method, they mentioned the extension of working hours and the increase in employees. Based on the results of this study, technicians should consider that a reduction of construction time not only can make up for a delay in construction, but is also closely related to improvements in production through reduction of cost, and increased international competitiveness.

EVMS Application Process based on Project Management Processes (Project Management Process를 바탕으로 한 EVMS 실무적용 프로세스)

  • Baek Sung-Min;Ahn Byung-Ju;Kim Jae-Jun;Kong Gun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.2 s.10
    • /
    • pp.59-66
    • /
    • 2002
  • EVMS(Earned Value Management System) came to the proper method for integrated cost-schedule control and Government announced EVMS application plan. After that, many studies related adaptability, activation, model, and process reflecting the characteristics of the domestic construction industry are proceeded in construction sites and schools. This thesis is a study of EVMS process. The purpose of this paper is to analyze the problems of previous researches for EVMS Process and to suggest the EVMS application Process based on Project Management Processes of PMBOK. In this kind of view, this thesis suggests the new direction to study EVMS process. And furthermore, this process is suggested for showing a framework of EVMS in Korean construction project are identified.

An Application of Safety Management for Tunnel Construction Using RTLS Technology (RTLS기술을 이용한 터널공사현장의 실시간 안전관리 적용방안)

  • Kim, Dae-Won;Moon, Sung-Mo;Cho, Hun-Hee;Kang, Kyung-In
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.2
    • /
    • pp.12-20
    • /
    • 2011
  • Recently, construction site scale has been growing larger along with the growth of national economy. As construction market requires time reduction, cost saving, and improving quality, a cutting-edge technology applied research has been gradually studied for more efficient project management. In particular, the Real Time Location System (RTLS) technology, a real-time location tracking system of construction resources, can be effectively used in safety management. This technology has been studied and applied in various industries including architectural, marine, urban, and other industries. However, although tunnel construction in civil engineering has a narrow space and many safety risks, there are not researched about this content. Therefore, this study proposes an advanced safety management model for tunnel construction using the RTLS technology and a measurement method of the feasibility of this model in the construction site.

Sustainable Development Plan for Domestic Forest Aggregate Development according to Transport Distance (운반거리에 따른 국내 산림골재 개발의 지속 개발 방안)

  • Lee, Dong-Kil;Lee, Jin-Young
    • Economic and Environmental Geology
    • /
    • v.54 no.5
    • /
    • pp.495-503
    • /
    • 2021
  • Aggregate is a major natural resource used in SOC construction, such as housing, roads, ports, etc., and is a fundamental material for national construction. Although aggregates account for only about 4% of the construction cost, aggregates occupy about 80% of the construction volume and are essential factors that determine the quantity and quality of buildings. For river, underwater, riverbed, sea, and land aggregates, it is difficult to rapidly increase the production of aggregates when there is difficulty in supply and demand due to environmental problems and limited resources during production, whereas forest aggregates are relatively easy to increase production. Forest aggregates are considered promising as alternative aggregate resources in the future when reducing other aggregates due to their abundance of natural resources, and are an effective aggregate source that can flexibly respond to aggregate demand in accordance with well-organized plans and policies. This study proposed the plan for activating the development of forest aggregates in the case of long and short transport distances, which is a factor that has a great influence on the development, and measures for the current difficulties in forest aggregate development

Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges (소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안)

  • Jang, Myung-Houn;Yi, Yong-Kyu
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.6 no.3
    • /
    • pp.413-422
    • /
    • 2016
  • A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

Design Improvement VE Case for Expansion of a Roadway over a Soft Soil (연약지반 도로확장공사 설계 개선에 따른 가치 평가 사례)

  • Kim, Tae-Hyung;Kim, Kook-Han;Choi, Young-Chu;Lee, Sa-Ik;Ruy, Ji-Hoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.13 no.1
    • /
    • pp.1-9
    • /
    • 2014
  • Expansion of a roadway on a soft ground can cause settlement of the existing road during embankment construction due to the consolidation characteristics of the soft soil. Many problems related to construction and maintenance, such as deterioration of the surface, decreased safety, and decreased structural stability, could affect the existing road. This scenario is especially true if the roadway foundation is a deep thick soft ground. Therefore, engineers should carefully select a proper design based on the characteristics of the soil layer. In this study, the expansion of the second branch of the Namhae Expressway was selected as the target site because this expressway has been constructing on a soft soil layer approximately 50 m thick. The original design was reviewed, problems were discussed and alternative was proposed through value engineering job plan phases: investigation, speculation, evaluation, development and presentation. In addition, the proposed alternative was evaluated on cost, function and value improvement. Compared to the original design, the proposed alternative saved cost and improved the function and overall value.

Improving the Design-phased VE Process of Public Clients in Relation to Using Critical Success Factors (핵심성공요인과 연계한 공공발주기관의 설계VE 프로세스 개선에 관한 연구)

  • Park, Heedae;Han, Seung Heon;Kim, Sung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.3D
    • /
    • pp.399-408
    • /
    • 2009
  • The major changes in construction environment are that construction project is bigger and more complicated and the power of construction market changes from the supplier to the client or the user. Especially public construction enterprises have advanced to introduce the value engineering (VE) which is one of the cost management based on the owner's leading at the design phase for economical efficiency and quality improvement. According to the these efforts, the implementation of VE was legislated in the revised Construction Technology Management Act in 2000, governmental agencies, local autonomies, and construction public enterprises universally has taken the VE into consideration. In this circumstance, the scope that VE construction applied at 50 billion won projects from 2003 has been extended to 10 billion won projects in 2006. Therefore, the VE construction will be activated in the future. The cost savings and function improvement, which are the purpose of VE are not only construction public enterprises, but also every public client supported from government's budget or owned by the government. Therefore, the purpose of this study is to propose the improved process and performance index of VE for governmental agencies, local autonomies, and construction public enterprises which want to introduce or improve the VE process. This research also suggested the To-be design-phased VE process model. In addition, it suggested the To-be model of design management reflected the To-be design-phased VE process model, which is eliminated two problems reflected for the performance improvement of the As-is model of design management.