Time Management Status of Small Contractors and Suggestions on Education for Time Management in Colleges

소규모 건설회사의 공정관리 현황과 대학의 공정관리 교육방안

  • Received : 2016.01.12
  • Accepted : 2016.02.02
  • Published : 2016.03.31

Abstract

A construction manager tries to complete a construction project within its duration and budget using available resources. Schedule networks such as Bar-chart and CPM(critical path method) are used to finish the project within the duration. A survey shows that small contractors prefer Microsoft Excel to commercial time management softwares to manage construction time in their fields, because the Excel is useful to control cost with schedule and few time management experts works in the small contractors. A college produces talented graduates who are able to manage time of a construction project. But the quality and quantity of college eduction for time management is insufficient. Another survey shows that majors in Architectural engineering of local national universities have the curriculum for time management, and teach mainly the theory of network scheduling and how to make the network schedule. The several majors have classes for the theory and exercise of commercial time management softwares in several majors. It is necessary to educate time management experts able to use Bar-chart and commercial time management softwares for the small contractors.

공사관리자는 가용자원을 최대한 합리적으로 사용하고 주어진 공사기간과 예산 범위 내에서 건설 프로젝트를 완료하기 위해 노력하며, 공사기간 내에 프로젝트를 끝내기 위해 바차트나 CPM과 같은 공정표를 활용한다. 제주지역의 소규모 건설회사나 현장에서는 건설공사를 수행하기 위한 도구로 공정관리 전문 소프트웨어보다는 엑셀을 많이 사용하는 것으로 조사되었다. 이는 엑셀이 원가와 연계하여 사용하기 편리하고 공정관리 소프트웨어를 활용할 전문가도 부족하기 때문이다. 대학은 지역의 중소규모 건설회사가 요구하는 공정관리 능력을 가진 인재를 배출하고 있지만 교육의 질적 및 양적 측면에서 다소 부족하다. 지방 국립대 건축공학의 교육과정 조사에 의하면 대부분의 학과는 공정관리과목이나 유사한 과목을 편성하고 있다. 주요 교육내용은 네트웍 공정관리기법에 대한 이해와 공정표 작성으로 이루어져 있다. 공정관리 소프트웨어에 대한 교육과 실습은 일부 대학에서만 이루어지고 있으므로 중소규모 건설현장의 공정관리 전문가를 양성하기 위해서는 바차트 활용과 전문 공정관리 소프트웨어 교육도 필요하다.

Keywords