• Title/Summary/Keyword: 공사실적

Search Result 285, Processing Time 0.027 seconds

Identifying Factors Affecting Labor Productivity for Residential Fire Protection System Installation (공동주택 소방설비공사의 노무생산성 영향요인 분석)

  • Oh, Jae-Hoon;Kim, Dae Young;Kim, Jae Sik;Huh, Young-Ki
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.4
    • /
    • pp.377-384
    • /
    • 2017
  • It is generally acknowledged that subcontractors mostly allocate their resources to project relying on their previous experiences, instead of data-based judgement. Installing residential fire protection systems, typically performed by subcontractors, is labor-intensive job and its schedule is frequently changed as the contractor master schedule is often revised. Nevertheless, it is still important for subcontractors to make much effort to improve labor productivity through a thorough planning for scheduling and resource allocation. The purpose of this study is to identify significant factors that affect labor productivity for residential fire protection system installation. For this purpose, 50 potential factors that may affect productivity were identified based on literature reviews and expert interviews. These factors were further explored using correlation analysis and ANOVA test. The results showed that the labor productivity is significant impacted by various project characteristics.

The Analysis and Forecasting Model for Maintenance Costs Considering Elapsed Years of Old Long-Term Public Rental Housing (노후 장기공공임대주택의 경과 연수별 유지관리비 분석 및 예측 모형)

  • Jung, Yong-Chan;Jin, Zheng-Xun;Hyun, Chang-Taek;Lee, Sanghoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.83-94
    • /
    • 2022
  • The number of public rental housing has increased according to the government's 「Housing Welfare Roadmap (2017)」, and facility maintenance costs for the demand of improvement of performance and residential standards due to the aging of long-term public housing are significantly increasing. Consequently, the financial burden of public housing rental business for maintaining stocked housing is aggravated. However, there is a lack of objective data to analyze the size of the maintenance costs that are executed by the type of repair work, and the elapsed years of the aged long-term public rental housing. This study analyzes the execution status of 33 long-term public rental housing complexes located in Seoul for 14 to 28 years of elapsed years based on the data of maintenance costs. In addition, this study proposes a model to predict the maintenance costs by elapsed years by dividing 'Long-term Repair Plan Work and Government-Funded Project [Y1]', 'Planned Repair Work and General & Unplanned Repair Work [Y2]', and 'Total maintenance costs [Y3]'. It is intended to be used as basic data for the establishment of the maintenance plan at the stage of setting up the budget and the establishment of the sustainable operation plan for public rental housing

A Study on the Simplification of Quantity Calculation of Reinforcing Bar (철근 수량산출 간소화 방안)

  • Jo, Yeong-Ho;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.6
    • /
    • pp.521-527
    • /
    • 2019
  • Quantity takeoff and cost estimates in Korea are carried out in practice without any clear standards or standards. Especially, quantity takeoff of Reinforcing bar and BoQ documentation process is very complex using 2D drawings. In this study, 10 case sites were analyzed for the status of inefficient quantity takeoff and how the statement was prepared. In order to solve this problem, this study presented a method for calculating the quantity of rebars through the ratio of concrete volume for schools, offices, and apartment buildings, and analyzed the accuracy of results. In the future, it is expected that the error range can be reduced by defining the factors affecting the results and calculating the correction value for them.

Experimental Study on Reduced Amount of Rebound in Wet Process Shotcrete Works by Upon Accelerator Contents (급결제 함유량에 따른 습식 Shotcrete 리바운드 감소량에 대한 실험적 연구)

  • Jeon, Jun Tai;Park, Hong Tae;Lee, Yang Kyu
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.6D
    • /
    • pp.615-622
    • /
    • 2012
  • The aim of shotcrete is to increase the bearing capacity and to protect the excavated surface from erosion by preventing falling of rock mass. Shotcreting method is divided into two types as dry process and wet process. Since 1997, wet process method has been used more frequently than dry process method in field works. The failure to bond, so called rebound, occurs in many case during shotcrete works. The excess amount of rebound has a significant effect on the total construction cost. For example, material and craft-man cost increases, the shooting time delays due to deceleration of work execution stage, work efficiency of craft-man decreases and additional cost to remove the muck generates. In this study, therefore, the experimental analysis of rebound amount and strength was conducted by analyzing the actual construction data for wet process type of shotcreting method upon accelerator contents. Also, the effective and rational method was suggested, which can be actually implemented in the Korea construction sites.

Development of Approximate Cost Estimate Model for Aqueduct Bridges Restoration - Focusing on Comparison between Regression Analysis and Case-Based Reasoning - (수로교 개보수를 위한 개략공사비 산정 모델 개발 - 회귀분석과 사례기반추론의 비교를 중심으로 -)

  • Jeon, Geon Yeong;Cho, Jae Yong;Huh, Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.4
    • /
    • pp.1693-1705
    • /
    • 2013
  • To restore old aqueduct in Korea which is a irrigation bridge to supply water in paddy field area, it is needed to estimate approximate costs of restoration because the basic design for estimation of construction costs is often ruled out in current system. In this paper, estimating models of construction costs were developed on the basis of performance data for restoration of RC aqueduct bridges since 2003. The regression analysis (RA) model and case-based reasoning (CBR) model for the estimation of construction costs were developed respectively. Error rate of simple RA model was lower than that of multiple RA model. CBR model using genetic algorithm (GA) has been applied in the estimation of construction costs. In the model three factors like attribute weight, attribute deviation and rank of case similarity were optimized. Especially, error rate of estimated construction costs decreased since limit ranges of the attribute weights were applied. The results showed that error rates between RA model and CBR models were inconsiderable statistically. It is expected that the proposed estimating method of approximate costs of aqueduct restoration will be utilized to support quick decision making in phased rehabilitation project.

An Analysis Of Optimized Super Tall Building Tower Crane Selection Which Related With Project Construction Period (프로젝트 공사기간과 연계된 극 초고층 타워크레인 최적화 선정에 관한 연구)

  • Cho, Ji-Hun;Cho, Heung-Goo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.131-139
    • /
    • 2009
  • It is critical to select the appropriate type of tower cranes for the construction of super tall buildings. However the selection is often made based on subjective personal experiences due to the lack of historical and analytical data. As a result, planning mistakes and efficiency errors sometimes occur. This research is to develop a system of hoisting analysis for appropriate tower crane selection and to provide a flexible statistical model based on the Burj Dubai project. In addition, this system hassupporting functions that can estimate the target construction period per floor, and a decision-making construction period computation method which is based on the characteristic of the selected tower cranes.

Projection of Activity Duration Utilizing Historical Cost Data (자원투입 비용을 고려한 공정관리 작업기간 산정)

  • Moon, Sung-Woo;Kang, Sang-Rae
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.444-447
    • /
    • 2006
  • Construction managers need to pay a close attention to the resource utilization in order to deliver the construction project successfully. Construction scheduling is crucial for resource control in that it provides information when and how much to bring down work force to sites. In scheduling, activity duration is projected based on the productivity of historical data or the intuition of scheduler. This paper studies the opportunity of applying cost-based productivity for estimating activity duration. For cost-based productivity, the cost of resource is used as an input and the work quantities as an output. Out of historical data, regression model has been developed to understand the validity of applying cost-based productivity in projecting activity duration. The result of study will work as a prerequisite for implementing the environment of database-based construction scheduling.

  • PDF

BIM System Development for Conceptual Design and Pre-Feasibility Study of Cable-Stayed Bridge (BIM 기반 사장교의 개념설계 및 예가분석 시스템 개발)

  • Chun, Kyoung-Sik;Park, Won-Tae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.10
    • /
    • pp.7204-7210
    • /
    • 2015
  • This paper has developed the system for supporting the approximate construction cost and the quantity estimation based on 3D model information in the pre-project planning phase of 3-span continuous cable-bridge with 2-pylons. First of all, we'd analyzed the design information (structural design report, blueprint and quantity) of the existing cable-stayed bridges and derived the design variables of cable-stayed bridges. We developed the BIM wizard that generates a cable-stayed bridge model parametrically based on derived design variables. The principle material quantities of cable-stayed bridge are calculated directly from 3-dimensional bridge model built by using the BIM wizard. Then, we can estimate the construction cost in relation to its quantities and unit cost of cable-stayed bridge. In a result, we have established the system that the construction cost can be estimated more specific than the conventional method (construction estimates per meter or square meter). We hereby will be able to review various alternatives as soon as possible in bidding process.

The Estimation of Non-Working days for the Construction Project in Incheon Region (기후요소를 고려한 인천지역의 작업불가능일수 산정)

  • Shin Jong-Hyun;Lee Jin-Ah;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.58-64
    • /
    • 2005
  • We should consider climatic factors influencing construction works in order to estimate construction time correctly. This study is to analyze climate elements affecting construction duration and to calculate non-working days far Inchoen territorial region. Through surveying literatures and examining several existing criteria we suggest a Proper criteria for each climate elements which would be used for estimating non-working days. The criteria is made on the raw climate data of Meteorological Administration during the last 30 years(1974-2003) far Incheon region. In case of rainfall, it is estimated as non-working days when daily precipitation is expected more than 10mm, its number of days for Incheon is 29 days. In case of low temperature, the number of non-working days for the concrete works(its criteria be below $4^{\circ}C$ average) and the finishing works(below $0^{\circ}C$ average) is 97 days, 52 days, respectively. In case of high temperature, it is three days when daily highest temperature is expected going over $32^{\circ}C$

A Model for Predicting Management Costs of the Multiple Prime Contract (분리발주 방식의 관리비용 예측 모델)

  • Kim, Kihyun;Kim, Kyungrai;Park, Wansoo;Lee, Eunjae;Hwang, Youngkyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.2
    • /
    • pp.44-52
    • /
    • 2014
  • On March, 2013, the Government announced the Multiple Prime Contract method will be expanded in public building construction projects. The applying multiple prime contract method has been immersing issue among all stakeholders of construction project. The owner conducts the role of a general contactor as well as owner's original responsibility while construction works being executed by specialty contractors. If the owner has not experience of project management, it should be bring about increasing management cost due to the interface problems among prime contractors. With this reason, it is difficult to administrate the multiple prime contract. So far there has been no methodology of predicting management cost in the multiple prime contract. Therefore, this study aims to enable the operation of efficient multiple prime contracts by developing a model to predict their management costs.