• Title/Summary/Keyword: 공사실적정보

Search Result 72, Processing Time 0.023 seconds

Accuracy Improvement in Demand Forecast of District Heating by Accounting for Heat Sales Information (열판매 정보를 고려한 지역난방 수요 예측의 정확도 향상)

  • Shin, Yong-Gyun;Yoo, Hoseon
    • Plant Journal
    • /
    • v.15 no.1
    • /
    • pp.31-37
    • /
    • 2019
  • In this study, to improve the accuracy of forecast of heat demand in the district heating system, this study applied heat demand performance among the main factors of district heating demand forecast in Pankyo area as the heat sales information of the user facility instead of existing heat source facility heat supply information, and compared the existing method with the accuracy based on the actual value. As a result of comparing the difference of the forecasts values of the existing and changed methods based on the performance values over the one week (2018.01.08 ~ 01.14) during the hot water peak, the relative error decreased from 7% to 3% The relative error between the existing and revised forecasts was 9% and 4%, respectively, for the five-month cumulative heat demand from February to February 2018, Also, in case of the weekend where the demand of heat is differentiated, the relative error of the forecasts value is consistently reduced from 10% to 5%.

Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects (파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법)

  • Seong, Ki-Hoon;Park, Mun-Seo;Lee, Hyun-Su;Ji, Sae-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.207-211
    • /
    • 2008
  • The importance of cost management in early stage has been increasing due to market change and competition severence in construction industry. Because the adjustable budget is only 20% after finishing design stage, the critical decision is made in the early stage. However, in the early stage, the design information is not enough to make crucial decision. Therefore, this research suggests the predicting method on the purpose of accurate cost estimation. The parametric estimation is appropriate for the early stage, especially it has the strength of rapidity in cost estimation. This research analyzes 84 actual data of public apartment on the scale of $11{\sim}15$ stories, and then performs the correlation analysis between cost and influence factors. After eliminating the parameters which causes the problem of multicollinearity, this research derived the formula through the multi-regression analysis.

  • PDF

Study of the Improvement of Information Management System on Subcontracted Service Results (하도급 용역실적 정보관리체계 개선 연구)

  • Kim, SeongJin;Kim, NamGon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.15 no.11
    • /
    • pp.6870-6876
    • /
    • 2014
  • Construction subcontracted services are conducted without clear systems, but to establish a sound trading order between the contractors and subcontractors, the government recently complemented a relevant system to legalize and systematically manage subcontracted services. This study prepared a system for managing the subcontracted construction service result after providing the optimal alternative plan through a related persons' interview, such as the ordering agency and the service company. Towards this end, the management system is provided to integrate subcontracted services and contracted services based on the system managing Construction Technology Service Result. The study findings can be shortened by more than 90% of the performance certification issuing work, and used to formulate measures to protect subcontractors, such as the prevention of low-priced subcontracts, by managing an objective and reliable subcontracted service result.

Integrated Management Method of Compensation Data for Advanced Compensation Business (보상업무 선진화를 위한 범국가적인 보상자료 통합 관리방안)

  • Seo, Myoung-Bae;Kim, Nam-Gon
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2011.11a
    • /
    • pp.1507-1509
    • /
    • 2011
  • 공익사업 수행시 발생하는 용지보상은 매년 20조원에서 30조원에 이르는 막대한 예산이 투입되고 있는 반면 각종 규정과 업무절차가 복잡하여 업무처리에 많은 인력과 시간이 소요되고 있다. 이에 국토해양부와 같은 중앙부처, 지방자치단체, 도로공사 등 주요 공익사업 사업시행자들은 기관별로 별도의 보상시스템을 구축하고 있다. 하지만 교육과학부, 국방부 등 보상시스템을 사용하지 않는 중앙부처가 대부분이고 기 개발되어 있더라도 시스템 활용도가 낮아 보상시스템을 활용한 보상통계자료의 작성 등이 어려워 매년 국가가 취득하는 공공용지 취득실적 및 규모 등을 파악하기가 어려운 실정이다. 또한 회계시스템과 연계가 되어 있지 않은 시스템이 많아 정확한 보상비 집행실적 추적이 어려워 과세자료 누락으로 인한 세금 누수가 발생하고 있다. 더불어, 과다보상비 책정 및 지급시 이를 체계적으로 추적할 수 있는 전산자료 부재 등으로 보상비 집행의 투명성이 저하될 소지가 있다. 이에 중앙부처, 지방자치단체 및 공공기관별로 용지보상시스템 사용현황을 파악하고 이들을 근간으로 범국가적으로 보상업무를 선진화 할 수 있는 보상자료 통합 관리방안을 제시하고자 한다.

Reengineering of TACT Process Management Analyzed on Task Information (업무정보 분석을 통한 TACT공정관리 프로세스 재설계)

  • Kim, Ok-Kyue;Park, Jun-Mo;Kim, Beop-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.5
    • /
    • pp.113-124
    • /
    • 2012
  • TACT process reengineering is applied to the finish work of apartment buildings and extra tall buildings to conduct efficient process control in Korea. Non-systemized information on the performances, however, causes difficulties in building a database for such records and it takes long time to find the relevant information. In order to solve such problems, scientific and quantitative understanding on the construction information and data is required to perform TACT process reengineering satisfactorily and also proper management plan should be provided for the working level staff to understand the required information and data more easily. In this regard, this paper reorganizes the TACT process reengineering based on the general process control and classifies the items of required information to redesign. Redesigned process was verified by specialists making use of work-information matrix. As a result, paper contributed to increasing comprehension level of the working level people and when the persons in charge are transferred to other duty, it makes them understand all the working procedure faster, which enables the departments involved to carry out their cooperation and adjustment more efficiently.

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Suh Sang-Wook;Kim Jae-Ho;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.4 s.16
    • /
    • pp.145-154
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

Development and Application of TACT Management System (TACT 공정관리 시스템 개발 및 적용 사례)

  • Kim Jea-Ho;Suh Sang-Wook;Kim Sun-Kuk;Kim Chang-Duk;Lee Hyun-Soo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.126-134
    • /
    • 2003
  • The change in environment of construction industry and the advancement of information technology require the improvement of construction project efficiency. However, construction industry still lacks performance-measuring tools that are the requirements of efficient project management system. In case of the schedule management system, schedule is usually being managed by result-oriented measurements such as completion time, spent cost, and progress rate, which are not good enough to control the overall continuity of work-flow. This research aimed to systemize the overall construction process and to develop the indicators for measuring performance of TACT activities during finishing work period that can contribute to the systemization of TACT management.

  • PDF

Forecasting of Heat Demand in Winter Using Linear Regresson Models for Korea District Heating Corporation (한국지역난방공사의 겨울철 열수요 예측을 위한 선형회귀모형 개발)

  • Baek, Jong-Kwan;Han, Jung-Hee
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.3
    • /
    • pp.1488-1494
    • /
    • 2011
  • In this paper, we propose an algorithm using linear regression model that forecasts the demand of heated water in winter. To supply heated water to apartments, stores and office buildings, Korea District Heating Corp.(KDHC) operates boilers including electric power generators. In order to operate facilities generating heated water economically, it is essential to forecast daily demand of heated water with accuracy. Analysis of history data of Kangnam Branch of KDHC in 2006 and 2007 reveals that heated water supply on previous day as well as temperature are the most important factors to forecast the daily demand of heated water. When calculated by the proposed regression model, mean absolute percentage error for the demand of heated water in winter of the year 2006 through 2009 does not exceed 3.87%.

Construction Information Management Using Information Technology (IT기술을 이용한 건설 정보관리 효율화 방안)

  • Ha Yong-Ho;Yu Seung-Hoon;Youn Hak-Joong;Lee Se-Jun;Kim Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.513-518
    • /
    • 2001
  • In recent years, construction information management systems using Information Technology(IT) have been developed in the construction industry. Construction information management plays a significant role in successful project implementation and completion. However, there have been a number of problems in current practice that manually collects and utilizes construction information generated in site. This paper mainly describes a new approach which is able to gather, manage, and accumulate the construction information in real-time using IT tools such as PDA, barcode, RFID, biometrics identification and digital camera. It first reviews the existing applications and their limitations, and potential IT tools for construction data collection and management. It then proposes a utilization method of IT tools for an effective information management in domestic construction site. Conclusions and future research works are also made in this paper,

  • PDF

Object & Parameter based Schematic Estimation Model for Predicting Cost of Building Interior finishings (오브젝트-파라미터기반 건축마감공사비 개산견적 모델)

  • Koo, Kyo-Jin;Park, Sung-Ho;Park, Sung-Chul;Song, Jong-Kwan
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.6
    • /
    • pp.175-184
    • /
    • 2008
  • For deciding the profitability and feasibility of the construction project, the schematic estimation has to not only link the design decision-making but also estimate the cost with reliability. The prototype-based schematic estimation system was developed for easily linking with design-making and supports to evaluate the design alternatives in the design development stage but didn't consider the cost estimated by parameter and additional work items by users. This research presents the object-parameter based schematic estimation model in the design development stage that can lead to accurately estimate the cost by using historical data from the high-storied office buildings. For the development of the proposed model for schematic estimation, after analyzing and classifying the work items from the Bills of Quantities(BOQs) and drawings of historical data, this research proposed the methods of estimating cost in accordance with attributes of each work item. In addition, a case study is performed for the effectiveness as comparing the previous estimating method with the proposed model.