The Application of Actual Database for building construction - Focusing on Commercial building - (건축공사 공사실적자료 데이터베이스 활용방안 - 상업시설물을 중심으로 -)

  • Lee Sung-Ho;Kim Tae-Hui;Han Choong-Hee;Kim Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.428-433
    • /
    • 2001
  • Commercial buildings are the mostly common ones to be constructed along with residential buildings. After economic inflation, So-called 'IMF era', construction market has been running low because of stagnancy of business activities and cost escalation, Thus the construction industry needs a study of higher productivity by means of using information infrastructure. To deliver a database of commercial buildings construction record, their major management has carried out analysis for database components, in an attempt to meet users' needs. The scheme study of application presented cost and resource in construction lifecycle.

  • PDF

An Application Plan of Cost Information through Actual Date Information DB Construction (공사실적정보 DB구축을 통한 원가정보 활용방안)

  • Kim, Soung-Jik;Kim, Tae-Hui;Min, Kyung-Seok;Kim, Ok-Gyu;Kim, Chan-Kyu
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.495-498
    • /
    • 2007
  • The latest parceling-out price upper limit ancestor memorial service enforcement, Sale in lots circle is elated interest of society each floor for construction working expenses by open etc. but private investment law for society basis facilities, because circle that is presenting in parceling-out price upper limit ancestor memorial service back is different system (configuration item), cross is expected. A lot of study results connected with cost control expense arbor in the mountains etc. were presented until present, but persistent DB expulsion prohibition. Cost information is standardization unpreparedness of system. It is real condition that is hoarded since research and development by practical use plan presentation unpreparedness etc. Therefore, in this study, desire does actual date use plan presentation by purpose through DB construction after process by information form of good quality so that can collects efficiently and manages and utilizes at construction production step flag firm' s results data which is achieved. Can utilize to data of tool development that maximize ultimately comprehension about employer' s business and business order ability through persuasion, and diverts in cost control business hereafter.

  • PDF

The Development of a Construction Productivity Prediction Model Based on Data Mining (데이터 마이닝 기반의 건설 생산성 예측 모델 개발)

  • Woo, Gi-Beom;Ahn, Jy-Sung;Oh, Se-Wook;Kim, Young-Suk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.813-818
    • /
    • 2007
  • Construction productivity is a key factor for efficiency evaluation of construction work process, project performance measurement, and basic data of work plan in construction industry. However, although construction productivity is important in construction industry, gathering methodology and analyzing methodology of productivity data are not well-organized therefore productivity data is not utilized in the construction industry The purpose of this study is to develop productivity prediction system using data mining technology based on activities and to suggest frameworks about productivity data collection, accumulation.

  • PDF

The Common Temporary Work Management System Using Historical Database (실적 데이터베이스를 활용한 공통가설공사 관리 시스템 개발)

  • Park Kyoung-Ho;Lee Hoon-ku;Baik Jong-Keon;Kim Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.367-370
    • /
    • 2002
  • The Elements of common temporary work in Construction Project have ambiguous work scope between client and builder. Also problems of non-breakdown, non-standardization in common temporary work are obstructive when contract. Finally they will be reached claim factors on the construction project. Because the common temporary work information management system is not built, We have to develop common temporary work information management system based on historical cost database for Construction Management. This system will successively accomplish the project in pre-construction step to standardize work items and to forecast the cost of common temporary work. Therefore feasibility study will be possible with historical database in new project.

  • PDF

A Study on the Improvement of Processes of Verification for Construction Firm's Records of Performance (건설공사 실적증명 프로세스 개선에 관한 연구)

  • Lee Hong-Jae;Cheon Bong-Gi;Kim Yea-Sang
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.369-372
    • /
    • 2001
  • The processes for verification of performance records in construction have many problems according to construction firm's participating in some of the processes. This study analyzed about current processes and provided improved processes with IDEF method. As the result of this study, it was found that 'As-Is' model has many repetition of activities and 'To-Be' model has three times more effective than 'As-Is' model has. The data modeling which is available for 'To-Be' model was also suggested.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

Construction Progress Measurement System by tracking the Work-done Performance (내역물량 측정에 의한 건설공사진도율 산정시스템)

  • Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.3 s.15
    • /
    • pp.137-145
    • /
    • 2003
  • The project control system based on the actual values of three objects shall be operated continuously in a timely manner. For collecting/tracking accurate actual performance data, a reasonable basis of measuring work performance and its related measuring methods are needed. Therefore, this research proposes a method of developing and operating the construction progress measurement system. The problem of the conventional method is the difficulty to construct control accounts and to define the basis of measuring the performance of each control account. Therefore, this research proposes the preferable, formal methodology that produces the progress value of the smallest work unit by surveying the installed quantities and estimates percent complete of groups of works or entire project by earned value concept. This research in connection with the hereafter research of the weight value of control accounts will contribute to apply in practice and to develop the scientific construction management technique in the construction industry. Further researches how to trend and forecast the project using the measured progress value are recommended for putting the prosed system of this research to practical use.

A study on Standardization of Monthly Work Process Report Information (월간공정보고정보 표준화에 관한 연구)

  • Jeong, Seong-Yun
    • Proceedings of the Korea Information Processing Society Conference
    • /
    • 2008.05a
    • /
    • pp.417-418
    • /
    • 2008
  • 월간공정보고는 건설공사를 수행하는 동안 공종별로 매월 공사의 진척사항과 집행금액을 계획대비실적으로 파악하는데 필요한 정보를 포함하고 있는 문서이다. 본 연구는 정해진 구성항목과 속성에 따라 공정보고 내용을 디지털화할 수 있도록 월간공정보고에 대한 정보표준안을 마련하였다. 공정보고 업무의 효율화를 위해 정보표준안을 기초로 한 공정보고시스템 개발과 함께 현장 적용성 검토를 위한 시범 적용과 사용자 만족도를 실시하였다.

The Development of a Schedule Management Support System Using Productivity Information of Construction Activities (단위작업 생산성 정보를 활용한 공정관리 지원시스템 개발)

  • Oh, Se-Wook;Park, Sang-Gyu;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.181-192
    • /
    • 2005
  • Labor work information can be converted into the useful construction information in an effort to analyze project status, measure performance, and design a new similar project plan. The labor work information can also be used to make productivity data, which can be used to analyze the relationship between 'as planned' and 'as built' in scheduling management of a project, and to calculate 'percent completion' as well as analyzing delay cause. It is require to effectively collect the labor work information base on the activities. In general, current project management heavily depends on the experience and judgment of project managers, according to the work progress. However, relying on the oかy experience and judgment of the project managers might deteriorate the transparency or reliability of the collected labor work information. The purpose of this research is thus to develop a computer-based system for monitoring the work information generated by labors input in activities using PDA and Barcode technologies, and to propose a application method of the productivity data for effective project management.

Cost Estimating System in KT (KT 시설공사비 산정 -실적공사비 방식을 중심으로)

  • Han Kyu-Jeong;Lee Chul-Kun;Mun Byeong-Jig;Lee Woo-Jung
    • 한국정보통신설비학회:학술대회논문집
    • /
    • 2003.08a
    • /
    • pp.373-375
    • /
    • 2003
  • 통신사업자들은 다양한 정보서비스를 제공하기 위한 노력과 통신품질 향상을 위한 시도를 다양하게 진행하고 있으며, 우수한 품질의 서비스를 저렴하게 공급하기 위한 노력도 시도하고 있다. 본 고에서는 KT가 경영 합리화와 내부 원가절감을 위한 여러 가지 노력 중에서 투자시설 공사와 관련하여 공사원가 계산방법의 개선을 위해 새로 도입한 다양한 방법들을 살펴본다. 특히 교환시설분야에서 적용 중인 실적공사비에 의한 예정가격 산정방법을 중심으로 개념과 적용사례 분석을 하기로 한다.

  • PDF