• Title/Summary/Keyword: 공사수행방안

Search Result 508, Processing Time 0.028 seconds

A Study on Project Information Integrated Management Measures Using Life Cycle Information in Road Construction Projects (도로건설사업의 생애주기별 정보를 이용한 건설사업정보 통합관리방안 연구)

  • Kim, Seong-Jin;Kim, Bum-Soo;Kim, Tae-Hak;Kim, Nam-Gon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.20 no.11
    • /
    • pp.208-216
    • /
    • 2019
  • Construction projects generate a massive amount of diverse information. It takes at least five years to more than 10 years to complete, so it is important to manage the information on a project's history, including processes and costs. Furthermore, it is necessary to determine if construction projects have been carried out according to the planned goals, and to convert a construction information management system (CALS) into a virtuous cycle. It is easy to ensure integrated information management in private construction projects because constructors can take care of the whole process (from planning to completion), whereas it is difficult for public construction projects because various agencies are involved in the projects. A CALS manages the project information of public road construction, but that information is managed according to CALS subsystems, resulting in disconnected information among the subsystems, and making it impossible to monitor integrated information. Thus, this study proposes integrated information management measures to ensure comprehensive management of the information generated during the construction life cycle. To that end, a CALS is improved by standardizing and integrating the system database, integrating the individually managed user information, and connecting the system with the Dbrain tool, which collectively builds artificial intelligence, to ensure information management based on the project budget.

A Analysis and Improvement of Manpower Management For Finish Work in High-Rise Housing Projects (초고층 주상복합 건물 마감공사 출역인력관리 현황분석 및 개선방안)

  • Won, Kyeong-Suk;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.600-603
    • /
    • 2004
  • Recently, Housing projects in the center of the Metropolis are getting higher, larger, more complex gradually, the resources are increasing greatly. Especially, the right manpower in the right place could quite important factor because the construction cites are wide and many subcontractors and labors throw into finish works in High-rise Housing projects. Differing from apartment building projects. it is only four or five years that high rise building projects are started so, there is little data for manpower information. Furthermore it is difficult that the data gathering and managing because manpower management is usually used to execute by subcontractors from supply to demand. Consequently, this study, proposed develop management for accurate manpower plan and efficient collection and practical use of manpower information through analysis of present condition in construction sites

  • PDF

Analysis of Delay Causation by Characteristics of Construction Projects (건설사업 특성에 따른 공기연장사유 분석)

  • Kim, Jong-Han;Kim, Kyung-Rai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.1 s.35
    • /
    • pp.78-86
    • /
    • 2007
  • Top priority to manage construction projects is given to the planning and scheduling in order to keep the project duration, which is one of the most important factors in construction management. However, recently most of public construction projects especially for civil projects are delays and preventive research, many efforts were made concerning construction delays and preventive management methods. But analysis of delay causation, which is a main key to solve the problems is not done, yet. Therefore, in this research causation delays are analyzed by characteristics of construction projects, which are type of projects, type of contracts, project participants, and general condition. As a result of the analysis, delay causation are proved to be different by characteristics of the projects. The research results will be used for prevention of time extension and dispute resolution.

Efficient Application of Multi-Trade Contract Method to Public Construction Project (공공건설사업 직할시공제 적용의 문제점 및 효율적 적용 방안)

  • Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.2
    • /
    • pp.35-44
    • /
    • 2013
  • Multi-trade Contract Method was introduced as a means of cutting down construction cost of public housing for low income people. Before a specific project delivery method is applied to large public construction project, it is necessary to discuss all the issues raised up from all the parties in construction industry and all the issues which can impact project performance. Thus the interviews were conducted with industrial professionals from diverse organizations and previous studies were investigated to figure out how this newly introduced project delivery method may impact owner's role and responsibility and project performance in terms of cost, schedule, quality and risk. Under the Multi-trade Contract Method, project owner's management tasks will be highly increased, so it should be checked out if the owner can do its role and responsibility. Public owner's organization also needs to be changed and proper project management procedure and system need to be established. In addition, for efficient application of Multi-trade Contract Method, public owner should consider diverse management approach to deliver the project, and how to select and maintain qualified specialty trades.

A Study on the Improvement of Construction Progress Measurement Based on Earned Value Concept (EV기반 RC 공사 진도율산정 개선방안)

  • Choi Tae-Young;Jung Hye-Won;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.307-310
    • /
    • 2003
  • Construction projects include risks due to uncertain factors, so it's important to repeatedly evaluate the performance of on-going work in all aspects of the projects. But construction projects are usually managed focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. Recently many researches about cost and schedule integration methods are in progress according to the increasing of interest and EVMS (Earned Value Management System). Though researchers comment and propose many methods, it's hard to find example to apply it to the real project. So, the purpose of this study is to improve a method of construction Progress measurement Based on Earned value Concept by integration of cost and schedule management. It investigates the previous studies, interviews and performs a case study.

  • PDF

A Vibration Evaluation and Improvement Scheme for Open Test Blasting (노천시험발파의 진동평가와 개선방안)

  • Kim, Eung-Rok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.1
    • /
    • pp.310-315
    • /
    • 2017
  • Although studies evaluating the effects of the blasting vibration on the adjacent structures from various angles have continued, cases of securing the safety of the adjacent buildings and researching the proper blasting method for the field condition by analyzing the vibration waveform of the measuring field while performing the open pit blasting are poor. Therefore, it is necessary to present a remedy for blasting pattern selection through test blasting that is appropriate for field conditions, and is economical and efficient. In this study, open pit blasting work was conducted based on the separation distance applied according to the standard blasting method by test blasting and the vibration regulation standard in the road expansion construction site to measure the blasting vibration value, and the vibration prediction equation by blasting methods was examined using a regression analysis computer program to calculate K, N, and R of the confidence level 95%. By setting the blasting allowed vibration standard of the test blasting target area to 0.3cm/sec, and the charring weight and blasting method by the separation distances according to the blasting vibration estimation equation of the open pit blasting guideline and the blasting vibration estimation equation of the test blasting were compared/analyzed, it was possible to identify the factors that increased the working expenses. In addition, the measurement and analysis of the adjacent structures during open pit blasting and the blasting vibration were performed after selecting the most adjacent structure to the open pit blasting spot to analyze the problems on the test blasting procedure and analysis method in the open pit blasting design/construction guidelines, which appeared in the process of completing open pit blasting construction, and a remedy is presented.

Improving Construction Operations Through Applications of 6 Sigma Management Techniques for Superstore Projects (6시그마 기법의 적용을 통한 대형 할인점 공사의 시공성과 향상)

  • Lee, Seung-Hyun;Lee, Hang-Bok;Park, Chan-Sik;Hong, Sung-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.185-193
    • /
    • 2007
  • In order to improve the performance of succeeding superstore construction projects, it is essential to find out an effective way for applying the opportunities of improvement on their repetitive construction process based upon the analysis of various success or failure cases occurred on previous similar projects. This research study suggests a way to improve their construction process through the applications of six sigma techniques on superstore construction projects. A literature review was implemented on the basic concept of six sigma and its general performance steps, and the step by step applications of six sigma techniques were accomplished regarding to the speciality of superstore construction projects. The opportunities of improvement for superstore projects were figured out, and the result of their applications on other superstore projects was analyzed. As a result, it was found that the adoption rate of identical success or failure cases was increased. Also, there were several improvement effects on the projects such as $10{\sim}20$ days of time savings by projects, decrease of reworks by preventing failure cases, quality and safety improvement. These results indicate that the six sigma techniques are applicable and valuable for improving the repetitive process of superstore construction projects.

우리나라의 광응용 보안장비 산업동향

  • Korea Optical Industry Association
    • The Optical Journal
    • /
    • s.101
    • /
    • pp.39-42
    • /
    • 2006
  • 본 고는 산업자원부와 대한투자무역진흥공사가 추진하는 산업별·품목별 수출유관시장 발굴 및 이를 통한 전략적 해외시장진출 확대방안 수립사업의 일환으로서, 한국광학기기협회가 관련 업계 및 전문가와 함께 수행한『대 브라질 광응용 보안장비 및 레이저 시장진출 확대전략』에 대한 보고서중 일부 내용을 발췌한 것임을 밝힌다.

  • PDF

브라질의 광응용 보안장비 및 레이저 산업 동향

  • Korea Optical Industry Association
    • The Optical Journal
    • /
    • s.102
    • /
    • pp.56-59
    • /
    • 2006
  • 본 고는 산업자원부와 대한투자무역진흥공사가 추진하는 산업별·품목별 수출유관시장 발굴 및 이를 통한 전략적 해외시장진출 확대방안 수립사업의 일환으로서, 한국광학기기협회가 관련 업계 및 전문가와 함께 수행한『대 브라질 광응용 보안장비 및 레이저 시장진출 확대전략』에 대한 보고서중 일부 내용을 발췌한 것임을 밝힌다.

  • PDF

터널 환기시설 단계건설 연구와 터널 방재설비의 설계경향

  • 윤철욱;이상표;김남석
    • The Magazine of the Society of Air-Conditioning and Refrigerating Engineers of Korea
    • /
    • v.30 no.7
    • /
    • pp.19-23
    • /
    • 2001
  • 장대터널내 환기설비의 단계적인 건설방안에 관하여 한국도로공사와 한국건설기술연구원이 함께 수행한 연구내용을 소개하고, 또한 현재 적용되고 있는 방재설비의 설계흐름과 컴퓨터 시뮬레이션을 이용한 제연설비의 설계경향에 대하여 간단히 소개하고자 한다.

  • PDF