A Study on the Improvement of Amending Process and Depreciation Measurement Method of the Standard Estimating System (건설공사 표준품셈 제.개정 프로세스 개선 및 손율산정방안에 관한 연구)

  • Ahn, Ji-Sung;Lee, Jeong-Ho;Kim, Young-Suk;Han, Seung-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.481-486
    • /
    • 2008
  • Standard Estimating System, which can be used for estimating a construction cost, has been pointed out having some problems such as non-reflecting a variety of construction environments and site conditions, non-adapting new technologies and methods since it was established in 1970. For solving these problems, the Korean Institute of Construction Technology(KICT) has chosen organizations for amending Standard Estimating System. However they have had many mistakes in the process of amending works because of non-establishing amending process and absence of the depreciation measurement method. This research derived the necessity to improve the amending process of the Standard Estimating System, and presented the detailed amending process and the performing method in the each process. Furthermore, this research proposed the depreciation measurement method available for the construction industry by means of analyzing researches that performed in the manufacturing industry and the measurement method for depreciation of general accounts.

  • PDF

A methodology for an effective utilization of construction equipment for highway construction projects (도로공사 공정계획을 위한 공정 로직 및 건설장비 효율화 방안)

  • Song, Hojeong;Choi, Jaehyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.26-34
    • /
    • 2014
  • Highway construction is a combination of linear, repetitive, and highly equipment intensive operations. Various types of construction equipment are deployed to ensure undisrupted performance of construction, and thus productivity improvement and cost-saving can be achieved through well-thought-out planning. The selection of construction equipment is dependent upon construction sequence, site conditions, and construction methods. In the process of planning, management should consider various types of construction methods per each type of construction operation. Also, management should map out proper construction equipment operation plan that takes the construction duration and cost measures into consideration. However, limited availability of historic data from the similar types of operations has been a stumbling block to proper construction planning, making the operations performed based upon experience and intuition guided by rules-of-thumb. As a consequence, the planing phase rarely provided an adequate validity in the implementation phase. The researchers developed a process logic for each construction type that management can utilize from early phase of highway construction planning process. Moreover, derived the construction equipment combination optimized for efficiency by using the process simulation technique. The developed method is expected to be useful for the decision-making process that aims to evaluate efficiency of various process plans and to ensure optimal selection of construction equipment for highway construction projects.

A Study on Analysis of Construction Monitoring Cost and Improvement Measures of Railway Tunnel Construction in Seoul (서울시 철도터널 건설공사의 공사계측비 분석 및 개선방안 연구)

  • Jong-Tae Woo
    • Journal of the Society of Disaster Information
    • /
    • v.19 no.1
    • /
    • pp.18-30
    • /
    • 2023
  • Purpose: This study is to contribute to the development of monitoring technology through the increase of confidence in construction monitoring by deriving the analysis of construction monitoring cost and improvement measures of railway tunnel construction in Seoul. Method: It presents the status on design and contract of construction monitoring cost, status on application construction monitoring cost and its analysis, analysis on safety management cost and quality management cost, expansion of application of the price calculation standard for monitoring management services to improve this, and monitoring for direct order of ordering organization. Results: If the monitoring management service that was meanwhile ordered as included in the construction work is performed by the directly selected company of ordering organization through the preliminary screening for bidding qualification, then the improvement of monitoring quality and the accurate monitoring data can be secured. Conclusion: For the price calculation standard for monitoring management service, the application of actual cost addition method under the Engineering Promotion Act and the calculation standard of monitoring management cost for standard estimation for ground survey should be extended through the direct order of ordering organization, not the method to be included in the net construction cost where it is performed by a subcontractor via contractor.

Development of Optimal TACT Process for Eco-Friendly Demolition Works in Aged Housing Remodeling - Focus on Case Study - (친환경 리모델링 철거공사의 최적 TACT공정 개발 - 사례연구를 중심으로 -)

  • Woo, Joong-Pyung;Kim, Ki-Hyun;Hwang, Young-Gyu;Kim, Kyung-Rai;Cha, Hee-Sung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.1
    • /
    • pp.3-12
    • /
    • 2011
  • Technology based civilization has made a sustained advancement, resulting in economic growth and material prosperity. The outcome was the beginning of environmental destruction. Especially, in regard to construction, it has been recognized as a key culprit for pollution. As such, the construction industry has recently shown interest in the environment, as it has been applying environment friendly method of construction and reducing wastes. As the number of old common housing increases in our country, reconstruction and remodeling are implemented as a means of improvement. However, it can be said that remodeling is the inevitable option because of cost and environmental problems associated with reconstruction. As part of its feature, remodeling work is preceded by removal work. And, removal work inevitably creates construction wastes. Treatment of wastes that takes into consideration environmental aspects is important and for this, removal work that is based on environment friendly remodeling to ensure selective separation must be implemented. Yet, a removal work based on environment friendly remodeling has a lower level of output compared to existing methods. Because remodeling work by its nature has a post construction work which proceeds after it, securing work efficiency is important as the removal work is a critical path activity. Thus, the present study improves the work process of a removal work that is based on environment friendly remodeling so that it becomes a work process that includes work efficiency. For this, as a case study, old common housing has been selected, and a TACT process has been developed which is based on data acquired from environment friendly removal work. And, this study develops an optimal TACT process which is based on environment friendly remodeling by conducting a simulation for a 15 floor apartment.

A Study for Safety Management on Ground Excavation by Analysis of Accident Events (사고사례 분석을 통한 흙막이 굴착공사 안전관리 개선방안 연구)

  • Seong, Joo Hyun;Jung, Soo Hyung;Shin, Ju Yeol
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.15 no.6
    • /
    • pp.175-183
    • /
    • 2011
  • With recent growth of population and industry, urban development grows into grand scheme of excavation and construction in urban area. As the development progress advanced, the developments get large and deepen. With a progress of technology development in geotechnical engineering in Korea, most our grand scheme of projects follows great progress. On the other hand, some excavation in construction site caused direct or indirect event that affects the adjacent or surrounding structures by excavation from time to time. This event usually happens around residential and commercial area where underground tunnel, subway station, commercial building, and high-rises excavation site is, could lead great damage on economy as well as personal injury or human casualties. In order to prevent this event, the study has to be done with analysis on various events of excavation and its cause. In this paper, the research has collected the various excavation events and their causes to analyze on each site and event to define emphasis on surrounding environment.

Risk-based Decision Model to Estimate the Contingency for Large Construction Projects (리스크 분석에 기초한 대형건설공사의 예비비 산정에 관한 연구)

  • Kim Du-Yon;Han Goo-Soo;Han Seung-Hun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.485-490
    • /
    • 2003
  • Nowadays the rapid change in construction environment getting more globalized and complicated has caused lots of unexpected risks from inside and out of the country, so more sophisticated construction management strategies are being strongly needed. This paper suggests a risk management model with which we can estimate the appropriate contingency by quantifying the amount of probable risks immanent in large construction projects, which have a high degree of uncertainty in the anticipation of the total construction cost. To develop the model, the risk factors that make cost variations are elicited based on the real data of the contingencies assigned to the past projects. Furthermore, the influential relationship of risk factors is structured by applying the CRM(Cost Risk Model) which is the synthetic model of Monte Carlo Simulation, Influence Diagram and Decision Tree. The ultimate outcome of this research can by validated by tile case study with a large construction project performed.

  • PDF

Construction Cost-Down of Building Substructure by VE Techniques (VE 기법에 의한 건물 지하구조의 공사원가 절감방안)

  • Kim Sun-Kuk;Heo Seong-Soo;Choi Yoon-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.125-132
    • /
    • 2005
  • Domestic construction firms make every effort to save cost and, contrarily, enhance quality for competitive advantage in the market. Structural work of building construction takes chaise of the total cost and schedule, thus elaborate planning and management of the work help to lead the project into a successful way. Therefore, the idea to save time and cost and enhance constructability securing quality and safety of the work should be developed after analyzing the designed documents and site conditions comprehensively in the initial construction planning phase. Value Engineering (VE) technique is introduced in the substructural work in this paper to save cost creatively and systematically in the design and construction phase. A practical VE model that is applied to the underground building work systematically is proposed to save cost and it applies to the actual project to confirm the effectiveness of the model.

An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects (현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안)

  • Park, Yang-Ho;Kown, Beom-Jun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.435-439
    • /
    • 2006
  • The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

  • PDF

A Research on how to turn Object oriented Database of civil materials to practical use (객체지향 Data Base를 이용한 토목자재 정보의 이용방안 연구)

  • Kwon, Oh-Yong;Han, Chung-Han;Kim, Do-Keun;Jo, Chan-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.708-711
    • /
    • 2008
  • This study is intended to build research for ways to utilize material information in the design and working business for public works. The contents and results of this study can be classified into object-oriented DB application to bridge construction and object-oriented DB utilization of civil material information. First, application of object-oriented DB to bridge construction 1) constructs the work unit of classified work table as an object(Each object constructs material information on the statement of quantity calculation as data), 2) constructs object-oriented DB for superstructure and substructure of PSC Beam bridge, 3) leads to the research for ways to utilize materials by developing 3D bridge prototype with REVIT structure. Secondly, ways to utilize object-oriented DB for civil material information identified the possibility for utilizing it in making 2D drawings for design work, preparing materials list, analyzing structure for working businesses, selecting and purchasing materials, managing process and maintaining. It is suggested that the results of this study should be applied to all bridge constructions through test-bed and additional studies so as to secure the credibility of the results of this study.

  • PDF

Verification Method for Quantity Takeoff Results of Concrete Works using Design Drawing Information (도면정보 기반 건축공사 콘크리트 물량산출 성과물 검증방안 개발)

  • Lim, Haejin;Choi, Chang-Hoon;Han, Choong-Hee;Lee, Junbok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.20-28
    • /
    • 2020
  • In construction project, an error in quantity information immediately leads to an error in the quotation, highly reliable quantity calculation is required for successful performance of a project. But there is a difficulty in the current situation for the person in charge to review all calculation sheets for quantity review as the quotation work has to be performed in a short period of time. Accordingly, it is thought that a review plan is required to secure reliability on calculated results and the review plan should be able to be carried out within insufficient quotation periods. In the present paper, it is intended to present a plan that enables quantity to be reviewed with the minimum number of persons within the shortest period of time through an algorithm of calculating a verification quantity. The suggested algorithm allows the result of quantity calculation work carried out earlier based on 2-dimensional drawing to be compared, not with an accurate quantity, but within an error range.