• Title/Summary/Keyword: 공사수행방안

Search Result 508, Processing Time 0.031 seconds

An Enhanced Operating Scheme of Evaluation System for Construction Works -Focused on the KNHC System (시공평가제도의 효과적 운영방안 -대한주택공사 제도를 중심으로)

  • Choi Jin-Woo;Jung Sang-Bong;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-284
    • /
    • 2001
  • The owner's evaluation system about the contractor's work performance is used to give the contractor some advantages or disadvantages. According to the result of evaluation of the contractor's performance in the given construction project, the owner identify the good contractors and give them some merits in the future project bidding. However, the system used in the Korean construction industry has caused many problems and has been operated improperly. As a case study, this paper investigates the current problems existed in the KNHC (Korean National Housing Corporation) evaluation system and suggests some directions for its efficient operation. In doing so, the study performed interviews with the KNHC officers and the related contractors, using a structured questionnaire

  • PDF

A Study of performance in water supply and low leakage (상수도관의 자재 성능 및 누수율 저감에 관한 연구)

  • Jung, Seung-Kwon;Lee, Jung-Min;Kim, Young-Jin;Kim, Man-Sik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2008.05a
    • /
    • pp.847-849
    • /
    • 2008
  • 상수도시설은 준공후 관련지자체에 이관 관리하는 시설로서 사용관종이 현재 다양하게 생산 보급되고 있어 관종 선정시 다각적인 측면에서 검토하여 채택하여야 한다. 최근 한국토지공사에서 사용하고 있는 상수도 관종은 대부분 택지개발계획 등 인허가 당시부터 관리주체인 지자체 등과의 협의과정을 거쳐 선정되는 경우가 많아 자재선택에 한계성이 있다. 이를 극복하기 위해서는 자재 성능에 대한 공사내 명확한 기준이 제시되어야 한다. 따라서 본 연구에서는 공사가 시공하여 준공한 사업지구내 매설된 상수도 자재에 대한 샘플링조사를 통하여 적정한 관의 선정과 년도별, 관종별, 용도별 사용 현황을 파악하여 향후 대응방안을 마련하고, 기존 상수도관의 선정시 비교검토된 관의 제원(관의 재질 및 개요, 생산규격, 특성, 관접합 및 수밀성, 시공성, 경제성, 공사비, 관종선정(안) 결정)별 비교검토서를 보완 작성하고, 국내에서 생산되고 있는 각종 상수도관에 대한 정량적 분석을 수행하였다. 이를 통하여 상수도 관종 설계 및 시공에 대한 적용방안을 마련하였다.

  • PDF

Plans for Reducing Risk through a Case Study of Risk Factors at a Construction Site -Focused on Earth work, Foundation Work, Reinforced Concrete Construction- (건설현장의 위험요소 사례연구를 통한 위험저감 방안의 고찰 -토공사, 기초공사, 철근콘크리트공사를 대상으로-)

  • Kim, Jin-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.83-93
    • /
    • 2010
  • With construction projects continuously becoming more massive and complex, risk factors have been consistently increasing. To achieve a successful project, it is very important to identify and cope with such risk factors. Therefore, the purpose of this study is to suggest plans of reducing risk, not only for describing the drafting process for construction planning but also for systematically organizing constraints and risk factors in earth work, foundation work and reinforced concrete construction. To achieve these objectives, this study 1) analyzes previous theories about risk classification structure, 2) performs a case study of an actual project to embody the problems of safety management by analyzing the results of an interview with a construction engineer. In conclusion, the following factors were systematically organized: 1) characteristics of construction site (purpose, structure, floor, etc.); 2) the actual application conditions of the main construction methods; 3) the relationship between constraints and risk factors.

Quantitative Estimaton of Amount of Sediment Loss around Round Revetment for Various Inflow Velocities (접근유속에 따른 호안 주변 매립토 유실량의 정량적 평가 방안)

  • Kim, Dong Hyun;Cho, Jae Nam;Kim, Gyu-Seon;Lee, Seung Oh
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.106-106
    • /
    • 2016
  • 매립공사시 매립토의 유실로 인한 공사기간의 지연, 공사비 증액 등이 발생할 수 있다. 이에 대한 정량적인 예측은 매우 중요하나, 그에 대한 연구는 상대적으로 미비하다. 본 연구에서는 매립토의 유실은 유입된 유사와 호안 표면의 유사가 흐름에 의해 공사구간을 빠져나간 양이라 정하였다. 매립공사에서 유실량의 산정은 매립물량 산정과 직결되며 이는 경제성 부분에서 매우 중요하다. 그러나 국내에서는 경험에 의존한 유실율을 기준으로 매립물량을 결정하고 있는 실정이고, 현장계측으로도 유실량을 정량적으로 판단하기 쉽지않다. 따라서 본 연구에서는 호안 주변의 흐름 특성을 고려한 매립토의 유실량을 정량적으로 평가하기 위한 방안으로 실험적 연구를 수행하였다. 수리실험은 길이 13.0 m, 폭 5.0 m의 직사각형 단면의 광폭 수로에서 수행하였으며 일정한 양의 유사를 유입하기 위해 자체 제작한 유사공급장치를 사용하였다. 매립토의 특성을 고려하기 위하여 일반모래($d_{50}=0.621mm$, SG=2.72)와 안트라사이트($d_{50}=1.547mm$, SG=1.61) 두 가지 유사를 사용하였고, 매립토 유실요인 중 흐름특성에 의해 외부로 유실되는 양을 보다 명확히 규명하기 위해 유사를 유입하기 전과 후의 양을 각각 직접 채취하는 원시적인 방법과 3D 스캔을 통한 방법을 이용하여 평가한 유실율과 비교 검토해 보았다. 두 가지 방법에 대한 상대오차는 최대 3.12%로 나타났다. 흐름조건에 따른 매립토의 유실율은 살펴보면 두 가지 유사 모두 한계유속(Vc)을 넘어서는 순간, 급격히 유실율이 증가하였고, 일반모래는 약 10 % 안트라사이트는 약 30%로 각각 나타났다. 향후 매립토의 특성인자의 영향을 명확하게 구분하기 위해 다양한 매립토를 활용하여 보다 많은 조건하에서 실험을 수행한다면 매립토의 유실량 산정의 정확성을 높일 수 있을 것이라 기대된다.

  • PDF

Best Practice in CM Application: Muju Waterways Flood Recovery CM Case (CM 적용 모범선행사례: 무주군 지방하천 1,2급 수해복구 공사)

  • Yu Jae-Hee;Choi Jae-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.27-31
    • /
    • 2003
  • 최근 해외시장에서는 Single Point Responsibility 개념의 선호와 프로세스사업관리능력의 중요성으로 건설사업관리 (Construction Management: 이하 CM)방식이 프로젝트 조달의 중요한 방안으로 사용되며 국내에서도 최근 CM 발주량의 획기적인 증가추세로 사업수행능력 향상을 위한 도구 개발이 절실하다. 가장 유용한 도구로는 국내${\cdot}$외 CM 수행사례 분석을 통해 이에 저해되는 요인과 모범사례 등을 파악하여 산업계로 하여금 체계적 점검과 벤치마킹을 통해 수행능력을 제고할 수 있는 핵심성공요인과 Best Practice의 보급 발간이다. 따라서 본 논문은 최근 감사원에 의해 모범선행사례로 선정된 무주 하천 1,2급 수해복구 건설사업관리 용역에 대한 CM성과를 분석하여 핵심성공요인과 Best Practice를 제공하는 것을 주요 목표로 한다. 본 CM용역에서는 무엇보다도 무주군내 수해복구공사에 CM 사업방식을 도입한 것은 현명하고 진취적이며 시기 적절한 일이라고 판단되며 이러한 선도적 기자체의 의욕적인 시도가 지방에서 수행되는 공공공사의 수준을 한 차원 높이는 계기가 됨은 물론 항구적인 복구공사기법의 하나로 정착하기를 기대한다. 또한 산업계는 CM관련 중심기관을 통하여 이러한 모범사례의 연속적인 분석과 보급을 통해 산업계 전반적인 CM수준을, 제고하여 국내외 CM확대 적용의 기반을 조속히 조성할 수 있기를 바란다.

  • PDF

A Study on the Improvement Plan for Records Management in Local Public Corporations (지방공사·공단 기록관리 개선방안에 관한 연구)

  • Choi, Eunjeong;Kim, Jihyun
    • Journal of Korean Society of Archives and Records Management
    • /
    • v.20 no.4
    • /
    • pp.59-80
    • /
    • 2020
  • Local public corporations are closely related to the welfare promotion of local residents because they are responsible for the management of public facilities and are entrusted with some of the duties of local governments. Besides these responsibilities, they also have to conduct systematic and professional record management to ensure the legitimacy and fairness of organizational activities as the importance of ethical management and knowledge management emerges in organization. With regard to this task, this study proposes an improvement plan for the records management of local public corporations by analyzing the current status of records management and the awareness level for the possibility of developments in record management work. For this endeavor, the study conducted a literature review, gathered 50 survey responses from archivists from local public corporations nationwide, and performed 18 interviews with the survey respondents. Based on the analysis of these data, the study proposes that the National Archives of Korea should strengthen the role of supporting local public corporations. Moreover, local public corporations are suggested to improve records management at the local level and form a cooperative union among similar corporations.

Analysis of hydraulic characteristics for spillway using numerical simulation (수치해석에 의한 여수로 수리특성분석)

  • Lee, Byeong Wook;Jang, Eun Cheul;Baek, Donghae;Yoon, Jae-Seon;Song, Hyun-Gu
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2022.05a
    • /
    • pp.246-246
    • /
    • 2022
  • 여수로는 수리시설의 계획저수위보다 높아진 수위를 낮추기 위하여 물을 안전하고 신속하게 방류하는 시설로 조절형식과 비조절 형식으로 구분한다. 조절형식은 인위적으로 조절수문을 이용하여 수위를 조절하는 형식으로 수문식과 밸브식으로 분류하며, 이상홍수대비 비상방수문에 많이 사용되고 있다. 비조절형식은 자연적으로 수위를 조절하는 형식으로 개수로와 관수로로 분류한다. 개수로에는 측수로식, 슈트식, 자유낙하식, 월류식이 있으며, 관수로에는 터널식, 선굴식, 암거식, 사이펀식이 있다. 한국농어촌공사가 관리하는 저수지는 3400개소로 측수로식 2091개소, 월류식 1269개소, 사이펀식 5개소, 선굴식 3개소, 기타 56개소로 비조절형식 여수로가 약 98%를 차지하고 있다. 2003년도에 재해대비 수리시설 설계기준이 개정되어 유역면적 2,500ha, 총저수량 500만m3이상이고 하류지역의 재산 및 인명피해가 클 것으로 예상되는 저수지는 PMF를 설계홍수량으로 적용할 것을 규정하고 있다. 이러한 설계기준의 홍수빈도를 적용하기 위해 기존 저수지의 치수능력증대 사업이 추진되고 있다. 치수능력증대방안으로는 제당높이 증고, 보조여수로 설치, 기존여수로의 확장 등 다양한 방안들이 있으며, 구조물 안정성, 경제성, 현장 여건을 고려한 시공성 등을 종합적으로 고려하여 채택하고 있다. 그 중 가장 대표적인 방안이 기존의 설계빈도를 초과하는 PMF 홍수량에 대하여 추가로 보조여수로를 설치하여 방류하는 방안이다. 본 연구에서는 기존 사이펀 여수로가 설치되어 있는 저수지에 측수로식 여수로와 사이폰식 여수로를 신설하여 FLOW-3D로 수치해석을 수행하였다. PMF 유입에 대한 저수지의 안정성을 확보하고, 이상강우에 의한 재해를 사전에 예방하기 위하여 신설 여수로의 방류능력, 접근 유속, 허용최대유속 등 각종 수리특성을 분석하여 홍수량 배제 능력을 검토하였다.

  • PDF

Constructability Analysis in Aged-Housing Remodeling Demolition Work for Maximizing Waste Recycling (폐기물 재활용성 향상을 위한 리모델링 철거공사의 시공성 평가 및 사례적용)

  • Chae, Seong-Hyun;Kim, Ki-Hyun;Cha, Hee-Sung;Kim, Kyung-Rai;Han, Ju-Yeoun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.3
    • /
    • pp.13-22
    • /
    • 2010
  • From now on, the aged apartment or house is expected to increase rapidly. So, we have to build a process of remodeling and develop the new technique. Demolition work is needed for systematic plan and management. However, contractors of the remodeling project established a rough plan and did not consider recycling wastes, safety of workers and structural stability of building. Therefore, we need a step to develop a assessment system, verify and make specified. This paper evaluated how much improve on construction speed, work efficiency, intensity of work and influence with another process comparing the existing method with the new demolition method. The qualitative and quantitative assessment system are developed with these output. The case study was carried out experimental group and control group, based on developed assessment system, which have the same condition. The existing method was made up of 3 steps- 1)Demolish windows, doors and iron goods, 2)Demolish indoor and outdoor walls, 3)Drop the waste. The new demolition method was made up of 5 steps- 1)Demolish windows, doors and iron goods, 2)Demolish the ceiling and wall's finishing materials, 3)Demolish the floor's finishing materials, 4)Demolish indoor and outdoor walls, 5)Drop the waste. Work time, idle time, the character of a work unit are analyzed by mock-up test. This study's output is expected to establish a systematic process of new demolition method and based on the maximizing waste recycling work in our construction industry.

연구원_연구과제 ③ - 기계설비공사 시공상세도 작성비 산정의 문제점 및 개선방안

  • O, Chi-Don;Lee, Yeong-Jun
    • 월간 기계설비
    • /
    • s.308
    • /
    • pp.44-45
    • /
    • 2016
  • 대한기계설비산업연구원(원장 이언구)은 지난해 4월 연구심의위원회에서 선정된 ${\triangle}$기계설비건설업 동향분석 ${\triangle}$기계설비건설업체의 부도예측 모형 연구 ${\triangle}$기계설비건설공사 시공상세도면 작성비 산정기준 연구 ${\triangle}$플랜트 건설 현장 외국인력 고용 개선방안 ${\triangle}$녹색기술 기준에 근거한 연구과제 도출을 위한 기초연구 ${\triangle}$대용량 지열설비 이용을 위한 지중열교환기 용량 설계 툴 개발 ${\triangle}$기계설비배관 및 장비 단열 기준 연구 등의 기본과제와 외부기관과 공동으로 수행한 ${\triangle}$플랜트 건설현장 외국인력 고용 개선방안 ${\triangle}$기계설비건설업 관련법류 개선방안 연구를 추진했다. 본지는 지난 2월호부터 연구결과 요약 보고서를 연재하고 있다.

  • PDF

A Study on Productivity Improvement Scheme Through Site Case Study In PSM (현장 사례를 통한 PSM 공법의 생산성 향상 방안에 관한 연구)

  • Lee Tai Sik;Lee Won Yong;Kim Gil Hong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.541-544
    • /
    • 2001
  • PC Box Girder was constructed by PSM(Precast Span Method) to solve the shortage of the construction period. The site case study was used in the PSM to find the construction productivity improvement. In this case study, main reasons of low productivity were founded unskilled technical engineers and insufficient equipment management winter season concrete curing condition. Productivity improvements are presented by assigning production personnel appropriately, motivation which increased by providing incentives for technical engineers, strictly cooperation of each participant, organizational teamwork, and Promoting productive work condition. Additional method of productivity improvements are continuous improvement of the work methods by considering the feedback on previous work, and continuous training to best handle the site conditions. This study of productivity improvement will help to use the most advantage of the PSM method and desire to successfully plan the future construction performance.

  • PDF