• Title/Summary/Keyword: 공사변경

Search Result 324, Processing Time 0.027 seconds

The Effect of Aggressive Order Intake on Defect of Construction Companies - Empirical Analysis Using Financial Approach - (공격적인 수주행위가 건설기업의 하자발생에 미치는 영향 - 재무적 접근을 이용한 실증분석 -)

  • Park, Hong-Jo;An, Sung-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.21 no.2
    • /
    • pp.149-156
    • /
    • 2021
  • This study empirically verified whether aggressive order intake affect occurrence of defects of Korean construction companies. In order to compensate for the shortage of construction costs due to aggressive low-cost orders of contractors, self-response measures such as design changes are followed, and construction defects may be induced in this process. It aims to verify relevance between aggressive order intake and defect in construction empirically using financial accounting data. As a result, it was confirmed that an abnormal increase in order volume and a deterioration in profitability such as operating margin due to aggressive order taking behavior leads to a decrease in construction quality and occurrence of defects. In addition, it was also confirmed that low construction ability and intentional changes in construction design or contract conditions after construction commences were a direct causes of defects. The results of this study can serve as an opportunity to come up with measures to prevent defects by confirming the relationship between defects in construction and deterioration of profitability due to aggressive low-cost order takings.

Risk Index Computation of Work Type for Bridge Construction using Accident Cases and the AHP Method (재해사례와 AHP를 이용한 교량공사 위험지수 산정)

  • Seo, Su-Eun;Gang, Gyeong-Sik
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2009.11a
    • /
    • pp.441-459
    • /
    • 2009
  • 교량공사는 지상작업과 고소작업이 혼재하고 작업공종이 복잡하여 위험성이 높은 공사로 추락, 협착, 붕괴, 낙하 비래 재해의 발생빈도가 높다. 또한, 중량 부재의 운반, 조립, 양중 등의 작업과정에서 유해 위험 기계기구와 건설장비 사용에 따른 유해 위험 요인이 산재하여, 유해 위험의 정도와 재해 발생빈도 및 재해의 강도에 차이가 있어 위험성평가를 통한 정량화된 위험지수의 제시가 필요하다. 위험성 평가는 교량공사의 특성을 고려하여 교량 건설현장의 공종별 유해 위험요인을 세부공종별 요소작업에 따라 분류하고, 재해 발생정도와 피해정도에 따른 위험도가 평가되어야 한다. 이러한 교량 건설공사의 재해를 줄이는데 기여할 수 있도록 정량화된 교량공사 위험지수를 제시함으로써 체계적이고 효율적인 재해예방 활동에 필요한 기초자료를 제공할 것이다. 특히 교량공사 시공 상의 제반 위험요인을 사전에 점검하여 변경 보완 제거할 수 있는 재해 예방대책을 수립하여 재해를 최소화하는 연구가 필요하게 되었다. 건설현장에서 위험지수의 고저에 따라 자원을 적정하게 배분한다면 안전관리의 효율성이 제고되고, 궁극적으로 건설재해 감소에 기여하게 될 것으로 기대된다.

  • PDF

Development of Integrated Traffic Control of Dynamic Merge and Lane Change at Freeway Work Zones in a Connected and Automated Vehicle Environment (자율협력주행차 환경의 고속도로 공사구간 동적합류 및 차로변경 통합제어전략 개발)

  • Kim, Yongju;Ka, Dongju;Kim, Sunho;Lee, Chungwon
    • The Journal of The Korea Institute of Intelligent Transport Systems
    • /
    • v.19 no.3
    • /
    • pp.38-51
    • /
    • 2020
  • A bottleneck and congestion occur when a freeway is closed due to maintenance and construction activities on the freeway. Although various traffic managements have been developed to improve the traffic efficiency at freeway work zones, such as merge control, there is a limit to those controls with human drivers. On the other hand, the wireless communication of connected and automated vehicles (CAVs) enables the operation of advanced traffic management. This study developed a traffic control strategy that integrates Dynamic Merge Control (DMC) and Lane Change Control (LCC) in a CAV environment. DMC operates as an either early or late merge based on the occupancy rate of upstream of the work zone. The LCC algorithm determines the number of vehicles that need to change their lane to balance the traffic volume on open lanes. The simulation results showed that integrated control improves the cumulative vehicle count, average speed upstream, and average network travel time.

해외건설공사 수행절차(9) - Converted Lump Sum Turnkey 계약방식

  • 해외건설협회
    • 월간 기계설비
    • /
    • s.223
    • /
    • pp.75-78
    • /
    • 2009
  • 전통적으로 주요 EPC(설계, 구매, 시공) 공사는 최초의 엔지니어링 작업(FEED : Front End Engineering Design)을 한 후, 경쟁입찰을 하여 총액계약(Lamp Sum)으로 공사를 수행했다. 최근에 EPC시공자의 위험부담을 줄이는 한편, 발주자는 경쟁적인 시공자를 확보할 수 있는 기회를 확대하면서 협상기간을 단축하교 조기착공을 위해, Lump Sum 가격을 늦게 결정하는 방법을 고려한다. CLST(Converted Lump Sum Turnkey)계약방식은 최초의 엔지니어링 작업을 한 후 경쟁입찰을 통해 1차 계약을 맺고(설계 및 특별 자재 공급에 대한) 공사를 수행하다 설계가 충분히 진행되고 핵심자재에 대한 견적이 입수되어 발주 가능한 시점 및 하도급사를 선정할 준비가 된 시점에서 1차 계약을 변경해 2차 계약을 맺는다. 2차 계약 시 1차 시 맺은 계약조건(직접공사비, 일반관리비 및 이윤, 최대한도 금액이 포함됨)을 기준으로 하되, 발주자가 Open Book 형식으로 공사비를 평가하고 재협상하여 Lump Sum 금액으로 전환해 합의한다. 이후 Lump Sum Tumkey 계약과 동일한 형식으로 공사를 수행한다.

  • PDF

Improvement of Contract Change Order System for the Fairness of Subcontracting in Public Construction Projects (공공건설공사의 하도급 거래 공정화를 위한 계약변경 제도개선 방향)

  • Cho, Youngjun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.5
    • /
    • pp.3-10
    • /
    • 2020
  • Subcontracting of construction is essential to carry out public construction projects. Subcontractor of the construction work shall enter into a contract with the original contractor without directly entering into a contract with the owner. Subcontracts are therefore greatly affected by the original contract with the owner. To protect subcontractors, the Fair Trade Act is enacted and the construction company's standard subcontracting contract is in operation. However, subcontracts are not properly reflected in the Government contract system, which deals with the relationships between the owner and the original contractor. In particular, the subcontractor may complain of difficulties at the public construction site as such procedures are not properly reflected in the construction work standard subcontract, although various procedures shall be carried out depending on the amount when change order occurs in subcontracts. Thus, the direction of improvement of subcontracting systems was proposed in the case of change order at public construction project sites as follows: First, the rights of subcontractors should be strengthened. Second, in order to resolve the information non-identity, subcontractors should have access to information related to subcontracts. Third, the status of subcontractor shall be guaranteed by reflecting the characteristics of the subcontract when the original contract for public works is concluded. Fourth, the dispute settlement method should be prioritized over litigation in order to fair subcontracting.

법령과 고시 - 표준시장단가(실적공사비) 제도 관련 계약예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.297
    • /
    • pp.110-116
    • /
    • 2015
  • 국가 발주 공사는 3월 1일, 지방자치단체 발주 공사는 3월 9일 예정가격을 작성하는 사업부터 표준시장단가 제도가 적용된다. 대한설비건설협회(회장 이상일)를 비롯한 건설관련 유관단체에서는 실적공사비의 불합리한 공사비 산정 기준 및 운영관행에 대해 폐지 건의를 지속적으로 해왔다. 정부는 이같은 건의를 받아들여 지난해 12월 17일 실적공사비 제도개선을 위한 공청회를 개최하고 개선안을 발표했으며, 이번 계약예규 개정을 통해 개선됐다. 이에 따라 실적공사비 제도를 대체하는 새로운 공공공사비 산정 방식인 표준시장단가 제도가 지난 3월 1일부터 시행에 들어감에 따라 기획재정부는 국가계약예규를, 행정자치부는 지방계약예규를 개정해 각각 지난 3월 1일과 3월 5일 공포하고 시행에 들어갔다. 각 개정 계약예규는 실적공사비의 명칭이 표준시장단가로 변경됨에 따라 용어를 수정했고, 실적공사비 제도 적용배제 범위를 신설했다. 또한 적용배제 공사범위는 300억원 미만 공사 중 100억원 미만 공사는 실적공사비(표준시장단가) 적용을 폐지하고, 100억원 이상부터 300억원 미만 공사는 2016년 12월 31일까지 한시적으로 적용하지 않는다. 정부는 100억원~300억원 공사에 대한 '실적공사비 적용 배제제도' 연장 여부를 2016년 하반기에 실적공사비 현실화 수준 등을 평가하여 재검토할 예정이다. 한편, 표준시장단가 제도는 공사비를 산정할 때 현행 계약단가 외에도 시공단가와 입찰단가 등 다양한 시장 거래가격을 반영하는 제도로, 지난 1월 22일 국가정책조정회의를 거쳐 확정된 '공공건설 공사비 적정성 제고방안' 후속조치의 일환으로 공공공사비 예정가격 산출방식의 하나인 실적공사비제도를 개선한 것이다.

  • PDF

A study on the Improvement of the Construction Post-evaluation System in Public Construction Projects (건설공사 사후평가시스템의 개선방안에 관한 연구)

  • Ok, Hyun;Kim, Jin-Uk;Yang, Sung-Hoon
    • Proceedings of the Korean Society of Computer Information Conference
    • /
    • 2015.07a
    • /
    • pp.305-308
    • /
    • 2015
  • 건설공사 사후평가는 공공건설사업 수행성과를 평가하고 차후 유사사업 추진 시 이를 활용하여 공공건설사업 효율화에 기여하기 위한 제도이다. 국토교통부에서는 발주청별로 실시하고 있는 건설공사 사후평가의 결과정보를 체계적으로 통합 관리하고, 이를 활용할 수 있도록 건설공사 사후평가 시행지침을 기초로 한 건설공사 사후평가시스템을 구축하여 운영 중에 있다. 하지만 사후평가 시행지침의 개정에 따라 입력양식 및 관리항목이 변경되고, 축적된 사후평가 결과정보의 분석기능 등의 부족으로 유사 건설사업 수행시 활용 체계가 미흡한 실정이다. 본 연구에서는 건설공사 사후평가 시행지침의 개정과 분석 및 통계기능 강화를 위해 따라 건설공사 사후평가시스템의 개선방안을 제시하고자 한다. 이를 통해 사후평가시스템의 활용도를 제고하고 유사 공공건설사업 수행시 시행의 효율성을 도모할 수 있으리라 예상된다.

  • PDF

Preliminary Study on the Factors Analysis of Change Order-Claim in Design-Build Project (설계시공일괄입찰공사의 설계변경 클레임요인 분석에 관한 기초 연구)

  • Ryu, Hyeok-Jun;Park, Byung-Ju;Yoo, Seung-Kyu;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.129-130
    • /
    • 2012
  • Although the order of Design-Build is being expanded by increasing construction scale and demanding hybrid function, the suitable regulation of the contracts is not settled. Design-Build is way by government because there are big construction of much government leading in contract relation high position occupy. So, case that prebendary's claim institution develops by litigation is very rare. But, recently Design-Build is magnified. So, these dispute factors is becoming visualization gradually. The contract system is needed to be consistent by international standard to deal with the problem. This study suggests the useful solutions in detail concerned with the main factor of change order claim by each Design-Build phases through practical sorting and analysis of the causes of Change Order-Claim.

  • PDF

Orders Status Analysis on the Successful Bidder Decision Method of Civil Turnkey.Alternative Tendering Construction (개선된 낙찰자 결정방식에 의한 토목 턴키.대안입찰공사 수주현황 분석)

  • Park, Hong Taea;Lee, Yang Kyu
    • Journal of the Society of Disaster Information
    • /
    • v.9 no.2
    • /
    • pp.164-177
    • /
    • 2013
  • From 2010 years to 2013, the selection method of successful bidder has been changed design suitable lowest method, comprehensive evaluation method(bid price adjustment, design score adjustments, weight standards), fixed amount best design method. Therefore this study was presented by analyzing the impact on the domestic construction industry according the way to determine the successful bidder, the evaluation order method and the operational issues through the analysis of order status, order number, results of acceptance an order, success rate range, results of acceptance an order according to weight success rate, results of acceptance an order by work type and order institution of a turnkey alternative tendering construction performed in domestic civil part.

2D Numerical Simulation of Flow at Downstream River of Dam due to Changing Position of Spillway (여수로 위치변경에 따른 댐 하류하천 흐름변화 2차원 수치모의)

  • Jung, Dae Jin;Kim, Won hee;Jang, Chang-Lae;Jung, Kwan Sue
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.342-342
    • /
    • 2016
  • 국내 저수지 17,477개소 중 30~40 여년전에 축조된 곳은 16,646개소로 95.2%가 노후화로 인한 지속적인 유지보수가 필요하며, 기후변화에 따른 대응능력이 현저하게 낮다. 하구둑, 방조제, 대형 농업용저수지 같은 대규모 농업기반시설들은 축조 당시보다 설계홍수량이 2~3배 이상 증가함에 따라 기후변화에 대비하기 위해 조속한 치수능력 증대가 필요하다. 하지만 대형 농업용저수지의 치수능력 증대를 위해서는 지형적 입지조건, 시공 가능성, 경제성 등을 고려하여 여수로의 위치, 규모, 형식 변경 등이 수반된다. 따라서 본 연구에서는 무한천 상류 예당저수지의 여수로 위치변경에 따른 저수지 하류 하천 흐름변화에 대하여 2차원 수치모의 연구를 수행하였다. 본 연구에서는 TELEMAC-2D 모형을 적용하여 저수지 하류 하천의 흐름을 모의하였고, RMA-2 모의결과와 비교검토 하였다. TELEMAC-2D 모형은 상류(subcritical flow)와 사류(supercritical flow) 흐름 모의가 가능하며, 홍수범람 뿐만아니라 동일 격자망으로 유한요소법과 유한체적법 모두 수치모의가 가능한 특징이 있다. 본 연구에서는 시간과 공간에 대하여 2차 정확도를 가지는 WAF(Weighted Average Flux) 유한체적기법과 $k-{\varepsilon}$ 난류모형을 적용하였다. 수치모의시 유역종합치수계획의 30년, 50년, 100년 빈도 계획홍수량에 대하여 여수로 위치변경 전(CASE-1)과 위치변경 후(CASE-2) 저수지 하류하천 흐름변화에 대해 모의하였다. 본 연구는 국내 하천 특성을 반영한 기설 저수지의 하류하천의 흐름에 대한 수치모의의 기초자료로 활용되어, 저수지 방류 흐름이 하류하천에 미치는 영향 분석 등에 기여할 것으로 기대된다.

  • PDF