OLAP and Decision Tree Analysis of Productivity Affected by Construction Duration Impact Factors (공사기간 영향요인에 따른 생산성의 OLAP 분석과 의사결정트리 분석)

  • Ryu, Han-Guk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.2
    • /
    • pp.100-107
    • /
    • 2011
  • As construction duration significantly influences the performance and the success of construction projects, it is necessary to appropriately manage the impact factors affecting construction duration. Recently, interest in the construction industry has been rising due to the recent change in the construction legal system, and the competition among the construction companies on construction time. However, the impact factors are extremely diverse. The existing productivity data on impact factors is not sufficient to properly identify the impact factor and measure the productivity from various perspectives, such as subcontractor, time, crew, work and so on. In this respect, a multidimensional analysis by a data warehouse is very helpful in order to view the manner in which productivity is affected by impact factors from various perspectives. Therefore, this research proposes a method that effectively takes the diverse productivity data of impact factors, and generates a multidimensional analysis. Decision tree analysis, a data mining technique, is also applied in this research in order to supply construction managers with appropriate productivity data on impact factors during the construction management process.

Development of Estimation Model of Construction Activity Duration Using Neural Network Theory (건설공사 공정별 작업기간 산정을 위한 신경망 기반 모형 구축)

  • Cho, Bit-Na;Kim, Hyeon-Seung;Kang, Leen-Seok
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.5
    • /
    • pp.3477-3483
    • /
    • 2015
  • A reasonable process for the activity duration estimation is required for the successful construction management because it directly affects the entire construction duration and budget. However, the activity duration is being generally estimated by the experience of the construction manager. This study suggests an estimation model of construction activity duration using neural network theory. This model estimates the activity duration by considering both the quantitative and qualitative elements, and the model is verified by a case study. Because the suggested model estimates the activity duration by a reasonable schedule plan, it is expected to reduce the error between planning duration and actual duration in a construction project.

A Study on the Influence of the Characteristics of Planning on the Cost of Apartment (공동주택의 계획특성이 분양원가에 미치는 영향에 대한 분석)

  • Kim, Gwang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.7 no.1 s.29
    • /
    • pp.89-99
    • /
    • 2006
  • Usually feasibility analysis in a narrow sense is a economic analysis of project. Feasibility analysis focused in this study is confined to the matter of finance. Many studies have been executed in qualitative element which include decision-making process or prediction of housing market. But it is difficult to find economic analysis related to characteristics of planning. In this study, floor area ratio, selling area ratio and term of works are adopted as the Characteristics of Planning. So, the purpose of this study is to analyze the Influence of the characteristics of planning on the cost of apartment by means of multiple regression analysis and what-if method.

The Estimation of Construction Duration for High School Buildings Based on the Actual Data (실적자료에 의한 고등학교 시설 공기산정)

  • Kwon Dong-Chan;Lee Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.6 s.22
    • /
    • pp.138-145
    • /
    • 2004
  • The construction duration for any building or facilities such as high school building influence the quality of the building as well as the total cost for them. Since there are no guidelines to estimate construction duration correctly, an employer(or owner) estimate it by their own experience or intuition. Therefore some conflicts related to construction duration happen between contract parties during construction. The purpose of this study is to suggest a predictive model which helps decision makers calculate exact net working days for high school building construction at the early stage of the construction project. To measure net working days for high school construction, 15 data were collected from actual spot in Incheon region. Multiple linear regression analysis was conducted to obtain the model which calculate construction duration for the substructure, the superstructure and the finishing works. total construction duration could be obtained by adding net working days to non working days which would be based on the meteorological statistics for Incheon region since 1974 to 2003.

Analysis of Actual Duration by Effecting Elements to Duration Estimate - Focused on Standard Duration of the Office Building Construction - (공기산정 영향요인별 실적공기 비교분석 - 사무소 건축공사 공기산정기준을 중심으로 -)

  • Hwang Hyo-Sang;Kim Kyung-Rai;Suh Sang-Wook;Kim Chang-Duk;Shin Dong-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.84-93
    • /
    • 2002
  • It is important to reduce construction duration in private sales and lease business for management of cash now in the owner's aspect. However, because the concept of standard duration hasn't been established in the domestic construction industry, it is difficult to present the standard of duration estimate. To solve this problem, this paper (1) grasped the effecting elements considered in the duration estimate through referring the existing literature related to the schedule management, (2) accomplished a comprehensive research on actual duration based on office buildings through the questionnaire survey and the expert interview, (3) presented the collected research data analyzed by effecting elements as standard duration, (4) compared standard duration with actual duration of countries advanced in construction projects as well as analyzed them, and then (5) raised the necessity of duration reduction in the domestic construction industry.

An Analysis of the Importance of the Risk Factors Influencing the Calculation of the Subcontract Construction Bidding Cost (건설공사 하도급 입찰단가 산정에 영향을 미치는 리스크 요인의 중요도 분석)

  • Lee, Sung-Goo;Park, Tae-Keun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.2
    • /
    • pp.109-117
    • /
    • 2007
  • The construction environment has the trend of oversizing and professionalizing, the increase of the construction period, and the risk factors and the uncertain factors which are important in the construction bid. The misunderstanding and the lack of knowledge of the subcontractor result in the decrease of the profit or the deficit. In conclusion, these are supposed to give the financial burden to the subcontractor. So, it is very important to predict the construction preparation cost calculation by the risk factors in the bidding stage and to calculate the bid unit cost considering the target profit of the subcontractor in the process of the mutual agreement and performance of the contract. In these points of view, this study analyzes how the importance of the risks influencing the bidding cost calculation affect the construction cost, and this analysis can be used as the basic data to establish the suitable bid strategy of the subcontractor.

A Study on the Sensitive Factors Influencing Acha Accident Using Bayesian Network (Bayesian Network를이용한 아차사고에 영향을 주는 민감요인에 관한연구)

  • Kim, Sang-Hyun;Shin, Yeon-Cheol;Moon, You-Mi
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.162-163
    • /
    • 2022
  • 기술발전에 따라 건설현장은 스마트 안전관리기술을 활용한 안전관리의 변화가 예고되고 있다. 중대재해처벌법 시행(22.1.27)이후 50인 이상 사망사고는87건(96명)으로 전년 동기109건(111명)대비22건(20.2%), 15명(13.5%)감소한 것으로 나타났다(국토교통부,2022). 반면에 단순비교지만 일본0.14%, 미국0.37%, 영국0.03%에 비해 한국의 재해율이 높으므로 다양한 안전관리활동의 과제가 남아 있다. 이에 아차사고 유형이 건설현장 특성간의 민감도모델 제시를 기반으로 근본적인 재해관리가 연구의 목적이다. 이를 이루기 위해 국토교통부의 아차사고 발굴데이터를 분석하여 유형을 분류하고, 공사기간, 공사규모, 신체부위 등의 요인간의 아차사고 민감성요인에 대하여 Bayesian Network를 이용하여 아차사고에 영향을 주는 모델링을 제시하고자 한다.

  • PDF

A Study on the Estimate Criteria and Influence Factors of Construction Duration of Domestic Firms -Focused on the Apartment Building Firms- (국내 건설 업체 공기산정 기준 및 영향요인 연구 -공동주택 중심으로-)

  • Kim Sun-Yeop;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.447-450
    • /
    • 2004
  • The domestic construction industry have focus on duration than construction cost. But recently it have interesting to The domestic construction industry, social requirement is changing. At the moderate speed duration has other angle of reducing cost and management of efficiency. specially Apartment building construction process is similar to other construction industry so it Is obtain a strong Point. This study on, A Target of construction industry is short duration than other it, general construction duration in summary schedule of level is studied, is based and construction duration for the point it is indicated reduction duration

  • PDF

Study on introduction of 'Pre-Agreement system for Additional Incidental Cost' related to construction time extension (공사기간 연장에 따른 추가간접비 사전합의 제도 도입 방안 연구)

  • Jeong, Ki-Chang;Lee, Jae-Seob;Park, Yang-Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.33-44
    • /
    • 2012
  • This study is as to payment improvement method of additional incidental cost to be occurred upon extension of public construction time. According to the result of analysis about the cause of non-payment of additional incidental cost of construction time extension through site examples, it was found that difficulties exist in disputes & proofing over the scope of actual cost recognition, and in this regard the result of experts opinion indicated that a construction extension pre-agreement system can be executed which agrees the scope of recognition of additional incidental cost of construction time extension once the statistical standard is clear and accurate. Accordingly, in this study, by totalling multiple sites data, calculations were implemented in terms of type of construction projects, amount of constructions, period of constructions. According to the result of calculation, the element of type of construction project and construction period appears to have none direct effect to the occurrence of additional cost of construction time extension, but direct relationship was indicated related to the contract amount element. In view of above, in this study a standard additional incidental cost of construction time extension was proposed, and presented a system improvement plan to implement the construction extension pre-agreement system.

Deduction of affecting factors for selecting the way of going into the main building of an apartment complex when constructing an underground parking lot. (지하주차장 공사시 주동진입방법 선정 영향요인 도출)

  • Song, Nak-Hyun;Whang, Kyoung-Jin;Lee, Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.995-998
    • /
    • 2007
  • The number of households old over as much as 20 years is expected to get increased rapidly more than 1,000,000(1 million). As a measure to this fact remodeling is being revitalized over the country. parking lots expansion actually takes up a great deal of weight among the requirement for remodeling. When constructing a parking lot for enlargement, the way of going into the main building determines such construction features as selection of Retaining Wall Method, installation of an elevator, parking measure of capacity, etc. This study derived the affecting factors for selecting the way of going into the main building when constructing an underground parking lot. In a research way, we examined the features on each method of going into the main building in an apartment complex through an in-depth interview with some experts after investigating the method of enlarging an underground parking lot and going into the main building. After that, we derived the affecting factors for selecting the way of going into the main building. The affecting factors include constructability, convenience, economic efficiency as a high level as well as existence and nonexistence of basement and removal, safety of current building, parking measure of capacity, amenity, inhabitant traffic line, construction expenses and construction duration as a low one. This study will be applied as a reference for selecting the way of going into the main building when constructing an underground parking lot especially targetted on an old apartment house.