Claim Management during Construction based on Key Claim Management Factors (클레임 핵심관리요인을 기반으로 한 건설공사 중의 클레임 관리)

  • Lee, Jun-Hyung;Lee, Hyun-Soo;Park, Moon-Seo;Kim, In-Ho
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.463-468
    • /
    • 2007
  • The disputes in construction projects are very important issue for stakeholders. However, many of presented claims have not received the compensation money required, and frequently turned down. The most cause is that the claims are not managed systemically on construction. Therefore, it is important to identify which management works are conducted on construction and how significantly do they relevant to construction claim. This research derives key claim management factors through analyzing causes for claim success and failure, and then presents management works relevant to them. This research also proposes the method for effective claim management and its expected effect through expert interview.

  • PDF

The Calculation Method for Prolongation cost of Sub-Constract in Domestic Public Construction Project (국내 공공 공사 하도급계약 공기연장 추가간접비 산정방안)

  • Jeong, Kichang;Lee, Jaeseob
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.61-69
    • /
    • 2018
  • Research on additional indirect cost due to construction period extension in general contracts has continuously been active whereas the same for the subcontract operations has not been. In this research, we review previous research on evaluation methods for additional indirect costs which are widely being used on construction sites as well as previously proposed methods altogether, applying them to analyze model-cases for comparison. We acknowledge that this pattern for construction cost fluctuation over the construction period demonstrates an S-curve. This S-curve shaped indirect cost occurrence is then used to generate model-cases that are used throughout the research which models we applied previous evaluation methods on. Finally in pursuit of finding out some problems of evaluation methods, we came to derive a conclusion that the "Average Actual Cost Evaluation Method on Extended Duration," which, in turn, were proved to be valid for application on general contracts, was also valid for general application on subcontractor operations.

Alternative Policy on Attrition Propensities of Travel Voucher (여행바우처 이탈에 관한 정책적 대안 연구)

  • Han, Suk Young;Park, Sang Gon;Jun, Minji
    • The Journal of the Korea Contents Association
    • /
    • v.17 no.9
    • /
    • pp.486-497
    • /
    • 2017
  • Travel voucher for low-income or social disadvantaged groups forms a part of social policies in Korea. The policy can not only provide an opportunity of travel experiences for the socially weak, but also enhance their family capital and social capital. Thus, the travel voucher policy can be beneficial for the participants and their society. However, little research evidence of its evaluation and challenges/benefits exists. In practice, one of the biggest problems is an attrition of travel voucher winners which is to decrease a cost-effect of the travel voucher policy and to increase unnecessary waste of both the federal and human resources. Thus more research is needed to answer the questions why some of winners abandon to go to travel by the voucher, and who is the seceder? In this context, the study empirically examines the attrition propensity for the winners of 2011 Seoul travel voucher from 1,632 respondents and second data from Korea Tourism Organization. This research found that total education years of travel voucher winners have a significant effect on using their voucher. Implications and alternative policies for government policy makers and administrators are discussed by the analyzed results.

A study on the Proposal of Interior Design Education Program Using BIM (BIM을 적용한 인테리어디자인 설계 교육프로그램 제안에 관한 연구)

  • Ha Seung-Beom
    • The Journal of the Convergence on Culture Technology
    • /
    • v.10 no.1
    • /
    • pp.427-433
    • /
    • 2024
  • BIM was activated by applying it necessarily to the government ordered construction of more than a certain amount of money in architecture and construction field of Korea before and after 2010. An architectural education using BIM at college in Korea has been doing in accordance with this trend but is not too different from the existing interior design studio. Also, a new design curriculum based on BIM that provides a digital design concept and a digital working environment is increasingly being demanded in modern society. A digital-based design process is required not only in the field of architecture but also in the field of interior. Therefore, this study suggests the prototype of the interior design studio based on the field practice can apply BIM design, not the unfamiliar interior design studio pursued in the field practice to understand easily the environment of interior design process BIM is essentially seeking.

Definition of Environmental Cost and Eco-VE Model for Eco-VE of Construction Facility (건설시설물 친환경 VE를 위한 환경비용 및 친환경가치모델 정립)

  • Kim, Myung-Jin;Kim, Joon-Soo;Kim, Byung-Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.5
    • /
    • pp.903-913
    • /
    • 2016
  • Paris Agreement of Climate Change seem affect to Korea eco-policy. Meanwhile the eco-design for reduce carbon emission have been applied in design phase of construction. However eco-design have applied passively except the project of eco-building system. For reflect eco-component in design, design VE that be appling to basic design and executing design phase of all construction project of over 10 billion should be use. But present applying VE Job Plan is reflecting partly eco-component, so the effect is small. Therefor new eco-VE development that reflect eco-elements to exist VE need. As the result of this study, the concept of environmental cost is defined to accounting. The calculation of the cost was using methods that apply $CO_2$ emission trading price, WTP, carbon productivity concept and carbon tax based on $CO_2$ emission. However, in order to apply eco-friendly VE at design phase, the model of new concept included carbon productivity concept is necessary. The eco-friendly VE model of new concept is model using $CO_2$ emission and potential environmental pollution index (PEPI). This study tried define eco-value model and environmental cost definition that become the major axle of eco-VE.

The Concept of Schedule and Cost Progress Integrated Management on the BDM Network (BDM 네트워크 공정 및 비용 진도율 통합관리 개념)

  • Kim, Seon-Gyoo;Lee, Yong-Hyun;Noh, Seong-Beom;Ko, Dae-Gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.54-64
    • /
    • 2011
  • Almost 40 years have been passed since the CPM was introduced to the construction industry in Korea. However most of construction projects in Korea do not prepare the CPM schedule neither operate it after established manually, as well as still depend on the Bar-chart schedule only. One of these reasons is because the CPM schedule does not reflect the site works realistically, it makes so difficult to recognize the actual progress clearly in visual format, and it is impossible to integrate and manage the time and cost oriented work progresses effectively. This paper proposes new concept of progress management that is able to integrate and manage the time oriented schedule progress and earned value oriented cost progress while maintaining the merits of CPM although the CPM schedule summarized automatically within a schedule hierarchy by the BDM that is a new CPM technique. We expect that this concept could make the applications of CPM technique to the domestic construction industry popular and help the advancement of the construction management in Korea as well.

Suggestion of Safety Level in Fish Farming by Impulsive Sound (충격소음으로 인한 양식어류 피해기준 제안)

  • Choi, Tae Hong;Kim, Jung Han;Song, Ha Lim;Ko, Chin Surk
    • Tunnel and Underground Space
    • /
    • v.25 no.2
    • /
    • pp.125-132
    • /
    • 2015
  • As for noise and vibration occurring due to construction near fish farms, engineering and the technical opinions of experts in different areas were excluded in calculating any damage. The victims tend to present only biological consulting-based opinions while construction companies tend to present information on general construction noise and vibration as they have little biological knowledge on fish. So, the National Environmental Dispute Medication Commission presented specific damage standard in 2009 through studies on standard in calculating compensation and damage assessment of farm-raised fish that were affected by noise and vibration. Currently, 140 dB re $1{\mu}Pa$ is accepted as damage standard of underwater noise in the country. This standard is the RMS value of continuous sounds for more than a second, not the impulsive sounds. To look up the data on existing studies, fish showed different reactions to underwater sounds according to the different kinds of fish such as ostariophysan or non-ostariophysan, and pinnipeds or non-pinnipeds. So, this study will present damage standards for impulsive sounds in consideration of the differences in the characteristics of the impulsive and continuous sounds.

Technology Valuation Evaluation Model of Decision Making System using Income Approach for Commercialization in LNG Plant Construction (수익접근법을 활용한 LNG 플랜트공사의 의사결정지원시스템 기술가치 평가)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.4
    • /
    • pp.58-67
    • /
    • 2014
  • The proportion of investment in national R&D projects in construction and transportation has been increasing continuously; in terms of the size of R&D projects, there are many medium- to large-sized projects of over KRW 10 billion. However, in spite of such continuous increase in R&D investments, there are many technologies developed but not commercialized, i.e., the quiescence of technology. Accordingly, it is necessary to link the R&D results to commercialization by expanding the scope of R&D projects. In this context, this study presented objective reference prices to be used in contracting/transacting technology and implementing commercialization strategy by conducting technology valuations against on-going research projects with earnings approach, and by estimating value of patented technology. Sum of free cash flow (business value) that can be generated during the life of the technology was estimated as KRW 512 million by reflecting a discount rate of 16.34% to convert it into the present value. In addition, the technology value was computed as KRW 227million by applying a technology factor of 44.39% to the above value. Based on the technology value estimated in this way, it is necessary to establish industrialization and commercialization strategy of the technology.

Development of the Purlin Hanging System Form for the Girder Bridge Slab and Economic Analysis (거더교 상판 콘크리트 타설용 거푸집 개발 및 경제성 분석)

  • Lim, Jeeyoung;Kim, Sunkuk;Son, Kiyoung
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.3
    • /
    • pp.271-278
    • /
    • 2016
  • In the case of South Korea, steel girder bridge (steel box or H-steel) and PSC (Pre-Stressed Concrete) girder bridge are the representative upper structures of railroad and road bridges. These structures account for 75% of the total bridge constructions and 80% of the total construction cost. Since the form work for concreting bridge slab is difficult, various construction methods developed and applied. However, several problems in those methods did not solve partially, including cost increase by material loss and rise of labor costs, quality deterioration by unskilled workers, increased construction time by complicated method, reduced productivity, safety accident by high place work, difficult transportation by big member, and rise of maintenance cost by material characteristic. Alternative method is needed to solve problems of as-is methods. Therefore, the purpose of this study is development of the purlin hanging system form for the girder bridge slab and its economic analysis. Through the findings of this study, it was verified that the purlin hanging system form is possible 60% reduction in cost and 80% reduction in time as comparison with conventional method.

A Study on the Minimization of Problems of the Direct Payment for Subcontractor's Work in Public Construction Project (공공건설사업(公共建設事業) 하도급대가(下都給代價) 직접지급(直接支給)의 효과분석(效果分析)을 통한 문제점(問題點) 저감방향(低減方向)에 대한 연구(硏究))

  • Cho, Young-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.5
    • /
    • pp.101-108
    • /
    • 2007
  • To execute a construction project, many construction participants are engaged in the project. Especially many subcontactors role is very important, but their contract statute seems weaker rather than prime contractor. So to protect the subcontractor and to activate fair subcontract, Fair Transactions in Subcontracting Act was enacted. Direct payment to subcontractor clause of the act can protect subcontractor from the fear of insolvency of prime contractor, on the other hand can cause dispute about the interpretation of defect liability. Therefore the positive act and regulation were examined, and the effects of direct payment to subcontractor were analyzed. And the treatment direction of direct payment were suggested in this paper. Summary is as follows; (1) Statute of subcontractor for the ordering subject must be considered (2) Contract relationship must be reflected in the performance bond, subcontract bond, and subcontract construction conditions (3) To clarify the defect liability for the direct payment, retainage to guarantee the repair during contract period may be reflect on the subcontract construction conditions.