Korean Journal of Construction Engineering and Management
/
v.23
no.3
/
pp.25-35
/
2022
The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.510-514
/
2004
This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.
Korea Mechanical Construction Contractors Association
월간 기계설비
/
no.11
s.208
/
pp.29-40
/
2007
국가계약법 시행령이 개정됨에 따라 재정경제부는 공사계약 일반조건, 입찰조건, 입찰유의서 등 회계예규를 개정하고 지난 10월 12일부터 시행에 들어갔다. 개정된 시행규칙은 공사계약일반조건에서 설계서와 물량내역서 등의 범위에 대한 정의규정 보완/손해보험 관련 손해공제 포함/설계변경 관련 조문정리/설계변경 계약금액조정 제한대상 추가 및 입찰금액조정 규정 마련/특정규격의 자재별 가격변동에 따른 계약금액조정 관련 등이 개정되었고, 공사입찰유의서에는 입찰에 관한 서류의 열람 및 교부/입찰무효사유 보완/낙찰자가 부적격자로 판명된 경우 낙찰자 결정 방법 개선/조문정리 등이 개선되었다.
Proceedings of the Korean Society of Disaster Information Conference
/
2022.10a
/
pp.235-236
/
2022
본 논문에서는 업무상 사고 재해자와 사망자가 가장 많은 공사금액 20억 원 미만 소규모 건설현장에서 떨어짐 재해를 줄이는 방안을 제시하여 전체 건설현장의 재해 감소에 기여하고자 하였다. 연구에 기반이 되는 이론(하인리히 법칙, 버드의 도미노 이론과 하베이 3E이론)을 검증하기 위하여 자료를 분석하고 국내·외 사례를 통해 선행연구를 실시하였다. 그 결과 떨어짐 재해발생원인을 다음과 같이 도출하였다. 첫째, 근로자의 안전·보건의식이 부족하다. 둘째, 떨어짐 방지 안전시설이 미비한 현장이대다수이다. 셋째, 위험성평가 제도의 현장 적용이 난이하다. 또한, 사례연구 분석을 통해 2015년~2016년 OO지역의 떨어짐 재해가 발생한 공사금액 20억원 미만 약 15개소 소규모 건설 현장을 방문하여 현장 소장을 대상으로 인터뷰를 실시하였다. 본 연구에서는 공사금액 20억 원 미만 소규모 건설현장의 떨어짐 재해를 줄이기 위한 개선방안으로 자발적으로 체험할 수 있는 근로자 교육, 떨어짐 방지 안전시설을 지원해주는 정부지원 그리고 위험성평가 간소화를 제안하였다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.34
no.2
/
pp.667-676
/
2014
This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.
Korean Journal of Construction Engineering and Management
/
v.6
no.1
s.23
/
pp.162-168
/
2005
Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.
Park, Yeon-Ho;Kim, Do-Hui;Eom, Jae-Yeon;Jeon, Seong-Il
한국벤처창업학회:학술대회논문집
/
2020.11a
/
pp.103-108
/
2020
본 연구는 미청구공사의 테마감리 지정으로 인해 해당 기업의 보수주의 성향이 증가하였는지 검증한다. 미청구공사에 대한 테마감리 대상지정 배경은 공사 진행률 과대산정 및 평가의 적정성 문제로 회계적 의혹의 적정성에서부터 출발하였다. 미청구공사 금액 계산 시 밀접하게 연관되는 공사진행률은 경영자의 재량적 판단이 반영될 수 있다. 만약 경영자가 이익을 상향할 목적으로 진행률을 부풀린다면 미청구공사가 과다하게 인식되는 문제가 발생한다. 이러한 문제점은 2013년 일부 건설업계의 어닝쇼크를 비롯하여 수주산업에서의 회계부실 문제가 사회적으로 큰 이슈가 되었다. 특히 조선업과 건설업의 잇달은 부실과 함께 미청구공사와 관련된 회계 불투명성이 크게 드러나는 등 회계자료에 대한 불신이 증가되었다. 이로 인해 미청구공사 과대계상 이슈는 금융감독원의 테마감리 대상으로 지정되었다. 본 연구의 실증분석 방법은 2012년부터 2017년까지 Basu(1997)의 보수주의 측정 모형을 이용하여 미청구공사 금액을 반영하기 전과 후를 비교하여 동 기업의 보수주의 회계처리에 미치는 영향을 분석하였다. 중요분석 결과로는 테마감리 지정 이후에 미청구공사에 대한 보수적 회계처리가 유의하게 증가되었다. 이를 통해 테마감리 지정 목적인 미청구공사금액의 과대계상 금지와 공시 강화라는 측면에서 그 실효성을 확인하였다.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.1D
/
pp.105-113
/
2006
Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust the contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for modulation of construction contract cost due to fluctuation of prices. However the method for making cost index had some problems in calculating cost index of each expenditure item that could not properly reflect the change of construction cost. To supplement these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes the method for making cost index that utilizes representative items of labor, material, equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent studies. By using this method, it is expected to solve the problems which were not reflected in preceeding studies.
기획재정부는 최근 중소건설업계의 경영환경 악화에 따른 경영애로를 완화하고 불합리한 제도를 개선하기 위해 국가 계약관련 회계예규를 개정하고 지난 11월 1일부터 시행에 들어갔다. 개정된 회계예규는 원자재 가격급등시 계약금액의 10% 범위 내에서 선금을 추가지급하게 해 이 돈을 자재확보 용도로 우선 사용할 수 있게 했다. 또한 원자재 가격급등으로 인한 계약금액의 조정을 원활하게 하기 위한 기준도 신설했다. 물가변동이 5% 이상물품구매는 10% 이상 상승하는 등 원자재 가격급등시에는 계약일로부터 90일 이내라도 계약금액을 조정할 수 있도록 했다. 현행 원자재 가격급등으로 인한 계약금액 조정은 일반적으로 계약일로부터 90일이 경과하고 물가변동이 3% 증감한 경우 기능하게 돼 있다. 대한설비건설협회는 자재가 급등으로 설비건설업계기 어려움에 처하자 자재가격 급등에 따른 계약금액을 변동시켜 줄 수 있도록 관련법 개정을 요청한 바 있다. 이에 따라 기획재정부기 회계예규 개정에 대한설비건설협회의 의견을 수용, 반영한 것이다. 개정된 회계예규는 또 종합건설업과 전문건설업간 겸업제한 폐지 및 실적인정에 따른 영업기간 인성 규정을 마련, 새로 등록한 업종으로 공공공사 입찰에 참여할 수 있게 해 종합 전문건설업간 상호 진출에 기여토록 했다. 지역중소업체 입찰참여가 쉽도록 1천억원 이상 대형공사(턴키 등) 에서 공동수급체 구성원수를 10 인 이내로 확대하기로 했다. 또한 300억원 미만의 적격심사낙찰제 대상공사 입찰시에 기업의 경영상태 평가는 원칙적으로 1년 이내 기업신용평가등급으로 평가하기로 했다. 이밖에 공동수급체 대표자 또는 수급인이 선금을 수령하고도 정당한 이유없이 공동수급체 구성원 또는 하수급인에게 배분하지 않는 사례를 막기 위해 계약담당공무원이 선금 배분여부를 확인하도록 하고 선금 사용 용도도 명시적으로 규정했다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.