Analysis of Loss Costs and Risk Reserve due to Risk Events for Aircraft Runway Construction (활주로 건설공사의 위험사건에 따른 손실비용 및 위험예비비 분석)

  • Kang, Hyun Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.3
    • /
    • pp.25-35
    • /
    • 2022
  • The purpose of this study is to derive risk events that occurred during aircraft runway construction and analyze loss costs for project participants. For this purpose, design change data, contracted statement and completed statement were investigated. The results of this study are as follows: There were 12 risk events in the process of construction, 5 design errors and 7 construction errors. The increased construction costs due to such risk events were calculated as KRW 726 million. Of the KRW 726 million that was increased due to risk events, about 52.57% was spent by the ordering agency, and about 47.43% contractors. The increased construction costs due to such risk events are about 4.86% of the direct construction costs of KRW 14.9 billion. Based on the results derived from these case studies, a method for estimating reserve costs and construction costs considering risk events is presented.

An Analysis of Differences between Contract Costs Estimated by the Actual-Cost-Data-based Method and the Quantity-based Method (실적공사비적산제도 도입에 따른 도급금액 변동 분석)

  • Park Chang-Bae;Kim Dong-Young;Kim Ju-Hyung
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.510-514
    • /
    • 2004
  • This research is a preliminary one to investigate transitional problems of actual-cost-date-based contract cost estimation method and suggestions for counteracting them. As parts of it, in this paper, the brief background and methods of the new method and contract costs estimated by introducing it are presented. The results of five projects' contract costs are compared to those estimated by the conventional quantity-based method. Comparison of the both is conducted in terms of total contract costs and contract costs according to type of sub-contracts. Finally, the propositional differences of the later to the former are analysed.

  • PDF

국가계약법 회계예규 개정

  • Korea Mechanical Construction Contractors Association
    • 월간 기계설비
    • /
    • no.11 s.208
    • /
    • pp.29-40
    • /
    • 2007
  • 국가계약법 시행령이 개정됨에 따라 재정경제부는 공사계약 일반조건, 입찰조건, 입찰유의서 등 회계예규를 개정하고 지난 10월 12일부터 시행에 들어갔다. 개정된 시행규칙은 공사계약일반조건에서 설계서와 물량내역서 등의 범위에 대한 정의규정 보완/손해보험 관련 손해공제 포함/설계변경 관련 조문정리/설계변경 계약금액조정 제한대상 추가 및 입찰금액조정 규정 마련/특정규격의 자재별 가격변동에 따른 계약금액조정 관련 등이 개정되었고, 공사입찰유의서에는 입찰에 관한 서류의 열람 및 교부/입찰무효사유 보완/낙찰자가 부적격자로 판명된 경우 낙찰자 결정 방법 개선/조문정리 등이 개선되었다.

  • PDF

법령과 고시 (2): 지방계약법 고시금액 변경

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • s.247
    • /
    • pp.29-31
    • /
    • 2011
  • `국가 및 지방자치단체를 당사자로 하는 계약에 관한 법률'의 고시금액이 변경됨에 따라 지역제한 대상공사와 지역의무공동도급공사의 적용범위가 변경되었다. 자세한 내용은 다음과 같다.

  • PDF

A Research on the Reduction Plan of Falling Accidents in Small Construction Sites (건설현장의 떨어짐 재해 감소방안에 대한 연구)

  • Choi, Seung-Yong
    • Proceedings of the Korean Society of Disaster Information Conference
    • /
    • 2022.10a
    • /
    • pp.235-236
    • /
    • 2022
  • 본 논문에서는 업무상 사고 재해자와 사망자가 가장 많은 공사금액 20억 원 미만 소규모 건설현장에서 떨어짐 재해를 줄이는 방안을 제시하여 전체 건설현장의 재해 감소에 기여하고자 하였다. 연구에 기반이 되는 이론(하인리히 법칙, 버드의 도미노 이론과 하베이 3E이론)을 검증하기 위하여 자료를 분석하고 국내·외 사례를 통해 선행연구를 실시하였다. 그 결과 떨어짐 재해발생원인을 다음과 같이 도출하였다. 첫째, 근로자의 안전·보건의식이 부족하다. 둘째, 떨어짐 방지 안전시설이 미비한 현장이대다수이다. 셋째, 위험성평가 제도의 현장 적용이 난이하다. 또한, 사례연구 분석을 통해 2015년~2016년 OO지역의 떨어짐 재해가 발생한 공사금액 20억원 미만 약 15개소 소규모 건설 현장을 방문하여 현장 소장을 대상으로 인터뷰를 실시하였다. 본 연구에서는 공사금액 20억 원 미만 소규모 건설현장의 떨어짐 재해를 줄이기 위한 개선방안으로 자발적으로 체험할 수 있는 근로자 교육, 떨어짐 방지 안전시설을 지원해주는 정부지원 그리고 위험성평가 간소화를 제안하였다.

  • PDF

Analysis of Road Construction Projects' Escalation under Historical Data-Based Estimate System in Jeju (실적공사비가 적용된 제주도 도로공사의 물가변동률 영향 분석)

  • Hong, Jeong-Ho;Lee, Dong Wook
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.34 no.2
    • /
    • pp.667-676
    • /
    • 2014
  • This study has conducted case studies in order to suggest alternatives to the historical data-based estimate system. Price fluctuation calculation methods based on historial cost indexes, standard estimate and construction cost indexes were applied to 9 road construction sites in Jeju for an analysis. As a result, in 5 construction sites (about 56% of 9 sites), the index control rate calculated based upon historical data-based estimate system was higher than that calculated based upon standard estimate and construction cost indexes. Thus the establishment of the requirements for the adjustment of contract price due to price fluctuation delays, which leads to a significant difference in price fluctuation amount. And, in an analysis of construction cost indexes, the indexes for road construction were used for calculating index control rate which ranges from 2.0 to 9.4 percent, indicating the time of construction amount and price fluctuation application has a significant influence on index control rate.

Improvement of contract sum adjustment method caused by price fluctuation using construction cost index (건설공사비지수를 활용한 물가변동에 의한 계약금액 조정방안 개선)

  • Cho Hun-Hee;Doe Geun-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.162-168
    • /
    • 2005
  • Index adjusted ratio method has been widely utilized in public construction sector for contract sum adjustment by price fluctuation. In this method, the Production Price Index are used for the base ratio, but the PPI can't reflect the character of construction project in respect of the selected items and weight. In this research we prove the problem of using the index adjusted ration method in contact sum adjustment by price fluctuation, and improve it by using the construction cost index, which has the property of construction project. And we figure out the efficiency of the proposed method by case study.

테마감리가 미청구공사의 보수적 회계처리에 미치는 영향에 관한 연구

  • Park, Yeon-Ho;Kim, Do-Hui;Eom, Jae-Yeon;Jeon, Seong-Il
    • 한국벤처창업학회:학술대회논문집
    • /
    • 2020.11a
    • /
    • pp.103-108
    • /
    • 2020
  • 본 연구는 미청구공사의 테마감리 지정으로 인해 해당 기업의 보수주의 성향이 증가하였는지 검증한다. 미청구공사에 대한 테마감리 대상지정 배경은 공사 진행률 과대산정 및 평가의 적정성 문제로 회계적 의혹의 적정성에서부터 출발하였다. 미청구공사 금액 계산 시 밀접하게 연관되는 공사진행률은 경영자의 재량적 판단이 반영될 수 있다. 만약 경영자가 이익을 상향할 목적으로 진행률을 부풀린다면 미청구공사가 과다하게 인식되는 문제가 발생한다. 이러한 문제점은 2013년 일부 건설업계의 어닝쇼크를 비롯하여 수주산업에서의 회계부실 문제가 사회적으로 큰 이슈가 되었다. 특히 조선업과 건설업의 잇달은 부실과 함께 미청구공사와 관련된 회계 불투명성이 크게 드러나는 등 회계자료에 대한 불신이 증가되었다. 이로 인해 미청구공사 과대계상 이슈는 금융감독원의 테마감리 대상으로 지정되었다. 본 연구의 실증분석 방법은 2012년부터 2017년까지 Basu(1997)의 보수주의 측정 모형을 이용하여 미청구공사 금액을 반영하기 전과 후를 비교하여 동 기업의 보수주의 회계처리에 미치는 영향을 분석하였다. 중요분석 결과로는 테마감리 지정 이후에 미청구공사에 대한 보수적 회계처리가 유의하게 증가되었다. 이를 통해 테마감리 지정 목적인 미청구공사금액의 과대계상 금지와 공시 강화라는 측면에서 그 실효성을 확인하였다.

  • PDF

The Research on Development of Road Cost Index Using Each Representative Item of Expenditure (비목별 주요 항목을 활용한 도로 공사비지수 산정에 관한 연구)

  • Chun, Jin Yong;Woo, Sungkwon
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.26 no.1D
    • /
    • pp.105-113
    • /
    • 2006
  • Construction cost index is generally used to estimate the new project cost based on past construction data and to adjust the contract cost when the price change of various articles and items of expenditure composing the contract occurs. In Korea, it is mostly used for modulation of construction contract cost due to fluctuation of prices. However the method for making cost index had some problems in calculating cost index of each expenditure item that could not properly reflect the change of construction cost. To supplement these problems, the research of developing construction cost index has been executed. Through the precedent research, these problems were partially resolved but still remain. Therefore this research proposes the method for making cost index that utilizes representative items of labor, material, equipment by analyzing bill of quantity of road construction, through analysis and comparison of precedent studies. By using this method, it is expected to solve the problems which were not reflected in preceeding studies.

국가계약관련 회계예규 개정

  • 대한설비건설협회
    • 월간 기계설비
    • /
    • no.12 s.221
    • /
    • pp.39-43
    • /
    • 2008
  • 기획재정부는 최근 중소건설업계의 경영환경 악화에 따른 경영애로를 완화하고 불합리한 제도를 개선하기 위해 국가 계약관련 회계예규를 개정하고 지난 11월 1일부터 시행에 들어갔다. 개정된 회계예규는 원자재 가격급등시 계약금액의 10% 범위 내에서 선금을 추가지급하게 해 이 돈을 자재확보 용도로 우선 사용할 수 있게 했다. 또한 원자재 가격급등으로 인한 계약금액의 조정을 원활하게 하기 위한 기준도 신설했다. 물가변동이 5% 이상물품구매는 10% 이상 상승하는 등 원자재 가격급등시에는 계약일로부터 90일 이내라도 계약금액을 조정할 수 있도록 했다. 현행 원자재 가격급등으로 인한 계약금액 조정은 일반적으로 계약일로부터 90일이 경과하고 물가변동이 3% 증감한 경우 기능하게 돼 있다. 대한설비건설협회는 자재가 급등으로 설비건설업계기 어려움에 처하자 자재가격 급등에 따른 계약금액을 변동시켜 줄 수 있도록 관련법 개정을 요청한 바 있다. 이에 따라 기획재정부기 회계예규 개정에 대한설비건설협회의 의견을 수용, 반영한 것이다. 개정된 회계예규는 또 종합건설업과 전문건설업간 겸업제한 폐지 및 실적인정에 따른 영업기간 인성 규정을 마련, 새로 등록한 업종으로 공공공사 입찰에 참여할 수 있게 해 종합 전문건설업간 상호 진출에 기여토록 했다. 지역중소업체 입찰참여가 쉽도록 1천억원 이상 대형공사(턴키 등) 에서 공동수급체 구성원수를 10 인 이내로 확대하기로 했다. 또한 300억원 미만의 적격심사낙찰제 대상공사 입찰시에 기업의 경영상태 평가는 원칙적으로 1년 이내 기업신용평가등급으로 평가하기로 했다. 이밖에 공동수급체 대표자 또는 수급인이 선금을 수령하고도 정당한 이유없이 공동수급체 구성원 또는 하수급인에게 배분하지 않는 사례를 막기 위해 계약담당공무원이 선금 배분여부를 확인하도록 하고 선금 사용 용도도 명시적으로 규정했다.