To improve the cost performance of construction sites, various systems and standards are constantly being developed and implemented. Although legal requirements for these system and standard improvements have been increasing, the cost efficiency performance of construction sites remains stagnant. We have digitized documents generated through construction supervision work at 39 building construction sites and proposed a model that can support decision-making in cost efficiency evaluation. This model selects key keywords that are considered to be highly related to cost efficiency by identifying the patterns and relationships of keywords through associated rule analysis and social network analysis using keywords derived from documents. In addition, it is expected to be used as a decision-making aid to determine the cost efficiency of a specific building construction site by establishing a logistic regression model using core keywords. As a systematic database of construction supervision documents and an integrated system of massive data generated by digital technology are established in the future, the accuracy and reliability of the cost efficiency evaluation model are expected to be reinforced.
많은 난관을 극복하고 조기착공에 성공한 후에, 우선적으로 고려할 사항은 주공정(Crtical Path) 을 관리하는 것이다. 주공정(critical Path)의 초기 작업에 필요한 자재, 장비, 인원의 준비를 재점검하고 하도급추진을 하는 한편, 계약서상의 요구조건, 승인사항에 미흡한 점이 없는지를 검토하고 보완한다. 계약서상의 요구사항을 미비하거나 무시했을 경우, 반드시 그에 상응하는 경제적 대가를 치루어야 한다는 것을 명심해야 한다. 시공을 하기 위해서는 자재승인 후 작업도면(Working Drawing/ Construction Drawing/ Shop Drawing)의 승인을 받고, 작업방법(Method Statement)을 제출하고, 설명화 Presentation) 및 시험시공(Demonstration 또는 Mockup)을 거쳐 감리자의 시공허락을 받아야 하며 각종 Test를 통해 품질관리를 실행해야 한다. 시공지는 시방서에서 요구하는 품질이 보장되는 범위 내에서, 최대한 공기를 단축할 수 있도록 공사초기부터 노력을 해야 하며, 공사의 모든 과정에서 항상 claim 여부, 공기내 준공, 하자 Zero, 최단 시일 내에 최대의 기성취하에 역점을 두고, 이에 장애요인을 해결하는 것으로 공사를 진행해야 한다.
지난 1998년 우원 콘서시엄(우원, 성아건업, 삼우공조)에게는 잊을 수 없는 행운의 해였다. IMF 이후 침체 일로를 걷고 있던 설비건설업계에 260억원이라는 사상 유례없는 최대금액으로 독립발주된 새국립박물관 기계설비공상 입찰에 국내의 기계설비 제작∙시공업체 21개 콘서시엄이 참여하여 경쟁하였기 때문에 누가 이 공사를 맡게 될 것인가가 초미의 관심사였다. 그런데 우원 컨소시엄이 적격심사 대상으로 선정되었다는소식을 듣게 되었다. 최초인 만큼 주변에서는‘과연 설비 전문건설업체가 무사히 공사를 마칠 수 있겠는가?’하는 우려의 눈초리도 있었다. 따라서 (주)우원을 비롯한 시공업체들은 이러한 우려를 없애기 위해 더욱 열심히 계획하고 실행하고 검토하고자 노력하였다. 공사 초기에는 각각 독립발주된 건축, 전기, 정보통신 분야의 시공자간 대화가 단절되어 어려움도 많았으나 발주처 담당자와 책임감리자들의 중재 노력에 힘입어 시간이 지나면서 공동목표를 인식하고 서로를 이해하면서 성공적으로 공사를 마칠 수 있었다.
성과측정은 체계적인 관리와 개선을 위한 중요한 활동이다. 건설산업에서도 성과측정을 위한 지표 개발 등의 다양한 연구가 꾸준히 진행되어왔다. 하지만 성과측정을 위한 데이터 수집에 큰 노력이 필요하여 실제로 성과측정이 수행되는 경우는 적었다. 특히 제도를 통해 건설 프로젝트 데이터를 수집해 온 우리나라 공공부문과 달리 민간부문에서는 프로젝트의 성과를 파악할 수 있는 데이터가 전무한 실정이다. 한편, 우리나라는 건설공사 감리를 통해 건축현장 시공단계에서의 품질, 안전 등을 총체적으로 확인하는 제도를 갖추고 있다. 감리 과정에서 건축현장의 성과를 파악할 수 있는 중요 데이터가 생성되고 감리보고서는 「건축법」에 따라 제출이 의무화되어 있다. 본 연구는 민간 건축현장의 성과측정을 위해 감리보고서의 데이터를 활용하고자 한다. 선행연구와 감리보고서를 분석하여 예비성과지표를 선별하고 전문가 인터뷰를 통해 건축현장의 6가지 성과영역과 15개 성과지표를 도출하였다. 다음으로 전문가 설문조사를 실시하여 성과지표의 데이터 수집 가능성을 검증하였고, 성과영역 및 성과지표의 중요도를 도출하였다. 감리보고서 데이터를 기반으로 도출된 본 연구의 성과지표는 앞으로 민간 건축부문의 성과측정의 실효성을 높일 것으로 기대된다.
소규모 공사는 건축에 있어 가장 기초적이며 근본이 되는 의미를 가진다. 현재 $\ulcorner$건축법$\lrcorner$ 제8조(건축허가)에는 도시계획구역 이외의 지역에 대하여 연면적 $200m^{2}$ 이상이거나 3층 이상인 건축물에는 공사현장에 감리원을 배치하도록 명시하고 있으며 이러한 기준 이하의 건축물에 관해서는 건축신고로 이루어지고 있다. 하지만, 법의 범위를 벗어난 공사현장에서 많은 문제점이 발생하고 있다. 건물의 설계는 전문가인 건축사가 하지 않으며 별도의 감리자도 없이 지역담당 공무원의 현장 방문으로만 관리하고 있는 실정이다. 현장의 기술력은 1980년대의 그것과 크게 다르지 않고, 노동자들의 안전은 더욱 문제가 되고 있으며, 또한 자재선택이 적절치 못해 건축물의 전체적인 품질저하를 초래하기도 한다. 따라서 본 연구에서는 소규모 프로젝트에 대한 현행 법규를 검토하고 소규모 공사현장 책임자와의 설문 및 인터뷰조사를 통하여 현장관리실태를 파악하고 문제점을 분석한다. 그리고 문제점에 대해 많은 현장을 경험한 고령의 기술자를 적극 활용하기 위해 Data Base를 구축하고 온라인 및 오프라인을 통해 공사를 조언 및 관리하는 방안을 제시하는 것을 목적으로 한다.
국가에서는 수해예방 및 주민들의 삶의 질 향상을 위해 다양한 하천사업을 수행한다. 국토교통부의 경우 매년 막대한 예산을 투입하여 하천정비 및 재해복구사업 등을 추진 중에 있으나, 체계적인 공사관리와 산출물의 전산화를 위한 시스템은 부재한 실정이다. 현재 건설사업정보시스템(건설CALS)을 통해 하천공사에 관한 정보를 확인할 수 있으나 총 공사비, 참여업체 등 기본적인 정보만을 제공하고 있으며, 공정관리 및 예산정보에 관한 상세한 내역을 확인 및 관리할 수 있는 기능은 부재하다. 이러한 문제를 해결하고자 본 연구에서는 하천사업(공사)관리시스템의 필요성을 제시함과 동시에 우선적으로 하천사업 공종 표준화를 수행하고자 한다. 현재 건설공사표준품셈을 통해 건설공사의 공종을 확인할 수 있으나 '제2장 하천공사' 내에는 사석, 돌망태, 하천호안공에 관한 정보만을 담고 있다. 하천공사 공종 표준화를 진행하게 될 경우 공종별 공사 세부정보에 대한 관리가 가능해지며, 현재 하천을 관리 중인 국토교통부, 지방국토관리청 및 지자체 등 하천사업을 수행 중인 기관의 시스템 활용도를 제고할 수 있다. 하천사업 공종표준화를 위해 우선적으로 현재 건설공사표준품셈, 도로대장 전산화 입력지침 등기 수립된 지침 및 기준을 통해 건설토목공사 시의 공종을 조사·분석한 후, 하천공사 준공보고서 및 감리보고서 등 공사 관련 자료를 활용하여 하천공사에 주로 수행되는 공사들에 관한 종류를 도출하였다. 이후 건설토목공사 공종과의 비교·분석을 통해 하천공사에서 주로 수행되는 공종을 도출·표준화하는 작업을 진행하였다. 본 연구에서 제시한 하천사업 공종의 경우 향후 하천사업(공사)관리시스템 개발에 활용이 가능하며, 하천공사 관리의 효율성을 극대화할 수 있다.
정부에서(건설부)제안한 건축법 중 개정 법률안이 지난번 임시국회 때, 국회건설위원회에서 일부수정 채택하고, 국회법사위에 회부했는데 오는 정기 국회에서 통과될 것이 거의 확실시 되는 바, 동 건설법 개정안에서 제53조(면적, 높이 및 층수의 산정 등)의 2항 신설로 협회 총회에서까지 수차 논란되었던 정화조 설계는 오물 청소법 제14조의 규정을 적용 받지 않도록 규정함으로서 부당한 규제가 없어지게 된 점과 제6조(건축물의 설계 및 감리 등)에 제7항을 신설하여 공사감리자에게 불이익을 줄 수 없도록 규정한 것과, 대체적으로 회원업무에 불리한 방향으로 개정되지 않은 것을 다행으로 여기며, 본 협회에서는 건설위원회에서 채택한 동 건축법 개정 법률안과 본 협회에서 정부에 건의한 동법 개정안의 내용을 동시에 게재하여 봅니다.
The type and proportion of construction work varies depending on the stage of progress, and the frequency of inspection and defect occurrences are different. If it is determined to be defective after the inspection, a delay may occur, and additional manpower and resources are required. Therefore, it is necessary to prevent these risks by classifying, deriving, and managing key management woks according to the progress. This study aims to contribute to the efficiency of the supervisor's inspection work by identifying the types of construction that should be managed intensively for each construction progress and deriving the time when defects occur frequently in each construction type.
우리나라 공공건설공사에서 불필요한 행정업무·제도·환경 등을 개선하기 위해 발주기관은 건설현장 담당자를 통해 관련 개선사항들을 보고·취합하고 있다. 그러나, 현재 업무개선 노력들은 발주기관에서 건설현장으로 지시하는 수직구조로 되어 있어 업무개선결과에 대한 정보 공유와 활용이 이루어지지 않고 있는 실정이다. 따라서, 본 연구에서는 건설현장 감리원들의 업무개선 아이디어를 온라인으로 평가하고 이를 전체 건설현장에 공유할 수 있는 창구를 마련하고자 한다. 이를 위하여 국토해양부 지방국토관리청 및 관할 건설현장에서 사용중인 건설사업관리시스템에 개선 아이디어 평가·공유 기능을 구축하고자 한다.
The introduction of digital technology for supervision work can be explained as an important key to improving construction productivity. In this study, effective digital technologies at construction supervision work is analyzed in terms of productivity improvement. And through questionnaires, effective technology introduction strategies is devised.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.