Analysis of Structural Work Scheduling of Green Frame - Focusing on Apartment buildings - (Green Frame의 골조공사 공기 분석 연구 - 공동주택을 중심으로 -)

  • Lee, Sung-Ho;Kim, Shin-Eun;Kim, Gwang-Hee;Joo, Jin-Kyu;Kim, Sun-Kuk
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.301-309
    • /
    • 2011
  • Apartment housings that adopt a bearing wall structure design, which account for a majority of the housing units available in Korea, are not free from structural constraints that limit the extension of their service life. The resulting need for reconstruction from the ground up requires a massive consumption of resources and energy, and triggers environmental pollution resulting from construction wastes. As a solution to such issues, the government enforces incentive schemes to promote a remodeling-friendly rahmen structure design. Green Frame, which is a novel concept of composite precast concrete structure to support rahmen structure apartment housing buildings, can address the constraints of bearing wall structure and conventional rahmen structure designs that limit the potential for remodeling projects, while reducing the term of construction. Therefore, this study aims to analyze the characteristics of Green Frame and its absolute term of construction, and compare the terms of frame work construction in apartment housing projects adopting different structural design approaches to illuminate their differences. In the end, Green Frame is found to be capable of reducing the term of construction in apartment housing projects. As the term of construction is a very critical element of a construction project, Green Frame will ultimately prove to be one of the key enablers to ensure the success of apartment housing construction projects.

An Integrated Environment and Economic Evaluation Model for Building Reconstruction and Remodeling Projects (재건축과 리모델링 사업의 환경성${\cdot}$경제성 통합평가모델)

  • Lee Ju-Heon;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.327-330
    • /
    • 2002
  • Recently, the environmental sustainability has showed up one of the important considerations in the construction industry. However, the effective evaluation method for the decision-making on either reconstruction or remodeling of a project has not been developed so far. This paper presents an integrated evaluation model considering both environment and economic factors of a building project for which the decision making on either remodeling or reconstruction is needed. In order to develop the model, the characteristics of both types of projects were investigated and analyzed through the related literature review, and then appropriate evaluation criteria and analysis methodology to be used in the model were developed.

  • PDF

A study on the Need for Introducing the Information and Communication Facilities Maintenance Mandatory System: In view of Apartment House Environment) (정보통신설비의 유지관리 의무화제도 도입 필요성에 관한 연구(공동주택환경을 중심으로))

  • Lim, Sang-Chool;Kim, Sun-Hyung
    • Journal of The Institute of Information and Telecommunication Facilities Engineering
    • /
    • v.6 no.3
    • /
    • pp.15-24
    • /
    • 2007
  • According to an apartment house environment and the service provide method of major telecom operators, is providing optic-LAN service with installing the equipments of optical office center and optic distribution at MDF(Main Distribution Frame) and under-ground of apartment. therefore the distribute is deepening between service providers because of space securement to install equipments and spare pipe securement to reinstall UTP cable. These were reasons that operators leaned to subscriber collection and neglected to maintenance, in addition, insist the facilities invested by each operators is his own assets for all that in-plant of apartment house is private land. So, would not being touched by others. Accordingly, this study will search it through the field current condition examine that service's types and methods which various telecom operators and broadcast operators are providing, the current conditions of being maintained, the problems of being happened. etc. and would like to improve that the users could use the services safely by making the information & communication facilities maintenance mandatory under the regular size of apartment house circumstances through the analysis of various laws relations which are managed information & communication construction work law, telecommunication basis law, home network. etc. technical standards by the Ministry of Information and Communication and are managed housing law, construction law, the regulation related to house construct standards. etc. by the Ministry of Construction and Transportation.

  • PDF

A Dynamic Approach for Evaluating the Validity of Boosting Pocliies for Green Standard for Energy and Environmental Design Certification (시스템 다이내믹스를 이용한 녹색건축인증제도 활성화 정책의 실효성 평가)

  • Kim, Jung-Hwa;Lee, Hyun-Soo;Park, Moonseo;Lee, Seulbi
    • Korean Journal of Construction Engineering and Management
    • /
    • v.17 no.1
    • /
    • pp.28-39
    • /
    • 2016
  • Since 2002, Korea Government has introduced Green Standard for Energy and Environmental Design Certification for reducing GHG emission in building area. However, total number of G-SEED Certification is only around 1% of total number of approved apartment buildings despite the various boosting policies. In this situation, most boosting policies and policy improvement researches are leaning toward the supplier's aspect. However, comprehensive relation and dynamics between consumer and supplier has to be considered because housing market is operated by market participants' mutual interaction. Therefore, this research presents system dynamics models based on decision making analysis of consumer and supplier in G-SEED Certification apartment building market. Then, this research evaluate the validity of boosting policies using the model. The proposed analysis can assist government to make next G-SEED Certification boosting policy.

A Study on Normal Project Period for Parking Lot of Aged Apartment Housing (노후 공동주택 주차장 리모델링 공사 표준공기 설정에 관한 연구)

  • Bang, Seongbae;Jang, JunYoung;Koo, Choongwan;Kim, Taewan;Lee, Chansik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.107-119
    • /
    • 2021
  • Recently, interest in remodeling apartment houses has been increasing due to problems such as a lack of parking spaces for old apartment houses. However, no method was suggested to predict the construction period of the apartment remodeling project. Unlike general apartment new construction, apartment remodeling construction involves demolition or reinforcement work, so a realistic remodeling construction period calculation plan differentiated from the existing construction period should be proposed. Therefore, this study intends to present a model for deriving the construction period of the underground parking lot of the apartment remodeling construction. Each construction period was calculated based on 19 activities of underground parking lot remodeling work through review of previous studies and expert advice. Activity's workload data and productivity data were derived to calculate the construction period, and the number of inputs and equipment inputs by Activity were determined to correct the productivity data. The construction period of Activity was calculated using the derived data, and the criteria for calculating the overlapping period for each Activity were presented to enable realistic construction period and scheduled schedule. As a result of predicting the accuracy of the construction period through the verification of the case complex, it is expected that it will be possible to predict the approximate construction period of the underground parking lot of the apartment remodeling construction in the future.

Analysis the Appropriate Schedule for the Installment Payment Amount and Establishment of the Post sale System and Policy in the Apartment Construction (공동주택 건설사업에서 후분양의 제도 및 정책 수립을 위한 분담금 납부 적정시기 분석)

  • Yoon, Inhwan;Bae, Byungyun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.4
    • /
    • pp.59-65
    • /
    • 2021
  • Since the 2016 "Housing Act Partial Amendment" and the "2018 Housing Comprehensive Amendment Plan", interest in the pre sale system and post sale system of apartment houses has been on the rise. In order to compare the advantages and disadvantages of the pre sale system and the post sale system of apartment houses, and to establish the basis for the institutional policy of the post sale system, a questionnaire survey method was used for tenants of the apartment house from the public side, and issues of time and cost. The time series analysis method is intended to suggest an appropriate time for payment of contributions. Accordingly, through a review of existing theories and literature, the post sale system of public and private institutions was organized, and through a questionnaire survey, the path to securing pre sale money, product information of the model house, and the degree of awareness of the effect of the post sale system were investigated. For the post sale fund support and payment method, it is necessary to increase the commercial line for existing financiers from the user's point of view, and it is necessary to operate in consideration of the economic power of the pre sale market by region. Both 60% post sale and 80% post sale have a price range of up to KRW 10 million, and the total interest rate is 5.0%, and the annual interest rate is about 2.8% for 60% post sale, and about 2.1% for 80% post sale, which is lower than the current 3.1%. I need an interest rate. The research is a perception survey targeting a total of 5,213 households in a sample of after sale apartments in public institutions. As the actual values are analyzed using a time series on the effects of market supply and demand and market prices, there is a limit to applying them to prospective residents of private apartments. In addition, to respond to first time tenants, a questionnaire survey was conducted on five complexes that have moved in within the last five years.

The Role of Housing Cooperatives in the Process of Neighborhood Regeneration (도시 빈민 주거지 재생에서 주택협동조합의 역할에 관한 연구)

  • Kim, Ran-Soo
    • The Journal of the Korea Contents Association
    • /
    • v.14 no.6
    • /
    • pp.417-427
    • /
    • 2014
  • This study was investigated on the basis of the role of housing cooperatives in sustainable regional business networks(SLEN) in regeneration of residential aged area where the urban poor live. For the analysis, input elements of human capital, social capital, financial capital and ecological capital were examine. For the process, the organization's structure, sustainable business and social networks, and for the result, the stability and community characteristics of the living and the payment possibility of housing construction cost were examined. Through this study, what kinds of issues can be from the housing coop's project in terms of sustainability, and what is the most important factor in order to overcome former mentioned issues were intended to find. For analysis literatures were reviewed and the in-depth interviews and survey were conducted with site visits. The result of this study finds that housing coop have community characteristics through active participation of residents during the regeneration process but the land, as financial and ecological capitals, and housing construction funds were poor. This was investigated that it makes groundless the sustainability of the project and the possibility of the payment. In order to overcome, land concession, inexpensive lental and active funning for housing construction to housing coop is required because housing coop is aiming to supply of social housing for low-income and vulnerable groups.

An Analysis of the On-site Improvement Area of Residential Environment Improvement Project in Daegu (대구시 주거환경개선사업 현지개량지구의 실태에 관한 연구)

  • Km, Han-Su;Kim, Cheol-Su
    • Journal of the Korean housing association
    • /
    • v.22 no.2
    • /
    • pp.43-51
    • /
    • 2011
  • This study aims to analyze the on-site improvement area of residential environment improvement project based on research results derived from the on-site and questionnaire survey in case of Daegu. The main findings are as follows. First, residents complain about delay of project completion because a long time has been passed after on-site improvement area was designated. Experts and government officials agree that a new method of development is required. Second, future development should discriminate on-site improvement area according to its level of project completion. The area should be classified into project completion areas and on-going area, and new methods, such as redevelopment, apartment-housing construction method, should be allowed. Third, for better management of on-site improvement area, laws and regulations must be ready and government's will for improvement is crucial.

An Assessment of Field Application of Elementary Technology for Reducing Construction Duration in the Apartment Housing Construction (공동주택 골조공기단축을 위한 요소기술의 현장 적용성 평가)

  • Kim, Kyu-Hoi;Park, Moon-Seo;Lee, Hyun-Soo;Park, Song-Woo;Joo, Sun-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.368-372
    • /
    • 2007
  • Recently, construction companies prefer to use large scale system forms to prepare for lacking of skilled workers, aging and the chances of application of pre-build&post-sale policy. In result of the effort and interest, the duration for framework of domestic high rise buildings has been accomplished to 3-4days per floor but for the apartment housing which form over 90% of the domestic construction industry, and especially the middle story RC apartments which is the main part, the duration for framework is only about 6-8days per level. This is only about 50% of the duration per level of RC residential buildings in North America. In previous researches elementary technology, which has potential of duration reduction, was proposed and this research suggest the applicability in construction sites and ways to improve it using elementary technology applied Mock-up Test. Furthermore, we analyze the productivity and T/C usage rate of the 6day-Cycle and suggest an improved model.

  • PDF

Analysis of Defect Risk by Work Types based on Warranty Liability Period in Apartments (공동주택 하자보수보증기간에 기초한 공종별 하자위험 분석)

  • Kim, Sang-Hyeon;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.4
    • /
    • pp.34-42
    • /
    • 2018
  • Apartment is a typical type of housing preferred by the majority of people. However, and defect disputes occur because various defects such as cracks, subsidence, breakage, water leakage, dew condensation and dropout are confirmed with numerous structures and finishing materials. From this point of view, this paper analyzes defect frequency and costs of each warranty period by work types, and estimates defect risks by using defect dispute cases. It examined about 5,337 defect items for 32 apartment over ten years old. In this paper, there are 10 types of work types and the warranty liability period is divided into 6 categories. Based on these categories, defect frequency and costs are investigated, and finally defect risk of the warranty liability period by work types confirmed. As a result of this analysis, it was found that defect risk in RC and finishing work is very high. Especially the RC work revealed that there is a high risk of trying from the third year onwards and it was found that the defect risk up to the second year is high in the finishing work. Due to aging of RC structure, the defect risk gradually increases, and finishing work initially cause defect disputes because of the housing environment.