KSCE Journal of Civil and Environmental Engineering Research
/
v.37
no.2
/
pp.409-417
/
2017
The study is concerned with doing research on the plan to prevent the dispute occurring between contract parties regarding the additional cost generated when the construction period is shortened during construction work. After the review of the claim cases and the judgment cases of the court regarding the additional cost caused by the shortened construction period, the representative problem is the incomplete regulations on calculating the additional cost. In the 1st stage of the results of the research on the problem, the procedure handling the additional cost is presented, and the process of planning and approving the shortening of the construction period is gone through in the stage of the procedure to prevent the dispute on the additional cost between contract parties. In the 2nd stage, the plan on enacting and revising the regulations on removing the incomplete problems of the current regulations relating to the calculation of the additional cost. The basis for the advanced contract management is provided by resolving the incomplete problems of the current regulations relating to the shortening of the construction period with the prevention of a dispute and the resultant loss.
많은 난관을 극복하고 조기착공에 성공한 후에, 우선적으로 고려할 사항은 주공정(Crtical Path) 을 관리하는 것이다. 주공정(critical Path)의 초기 작업에 필요한 자재, 장비, 인원의 준비를 재점검하고 하도급추진을 하는 한편, 계약서상의 요구조건, 승인사항에 미흡한 점이 없는지를 검토하고 보완한다. 계약서상의 요구사항을 미비하거나 무시했을 경우, 반드시 그에 상응하는 경제적 대가를 치루어야 한다는 것을 명심해야 한다. 시공을 하기 위해서는 자재승인 후 작업도면(Working Drawing/ Construction Drawing/ Shop Drawing)의 승인을 받고, 작업방법(Method Statement)을 제출하고, 설명화 Presentation) 및 시험시공(Demonstration 또는 Mockup)을 거쳐 감리자의 시공허락을 받아야 하며 각종 Test를 통해 품질관리를 실행해야 한다. 시공지는 시방서에서 요구하는 품질이 보장되는 범위 내에서, 최대한 공기를 단축할 수 있도록 공사초기부터 노력을 해야 하며, 공사의 모든 과정에서 항상 claim 여부, 공기내 준공, 하자 Zero, 최단 시일 내에 최대의 기성취하에 역점을 두고, 이에 장애요인을 해결하는 것으로 공사를 진행해야 한다.
Korean Journal of Construction Engineering and Management
/
v.10
no.2
/
pp.75-83
/
2009
PPC stands for the percentage of weekly assignments completed. It makes it possible to improve the performance of production planning and control systems. Recently, the cases of PPC application have been increasing because PPC is easy to apply to construction site. However, to evaluate the average of PPC or analyze PPC as time passes has some problem ; if PPC is the same, the average it is evaluated equally although there are variabilities in production system. Therefore, In order to evaluate the character of PPC in process of production this paper suggests the method of the evaluating PPC by using coefficient of variability besides PPC measurement.
Journal of the Korean Institute of Landscape Architecture
/
v.42
no.6
/
pp.101-110
/
2014
This study analyzes the validity of the type classification of the type and design changes of apartment landscaping planting construction design changes that were completed in the private sector, efficiently manages the design changes that are displayed over landscaping planting work in general in the future, and performs research by placing the object underlying the presentation. The results are as follows. First, the percentage that occurred in the planting construction of design changes that have occurred in the apartment landscaping construction was carried out in the private sector and accounted for 61.8%. This indicates that part of the planting is a major design change. Second, as the cause of such a design change to be those associated with the field conditions such as lack of main construction period. In particular, due to a change in oral, appeared 7-48 times design changes of one review design change approval is complex, design changes of planting construction had shown a feature that occurs in multiple simultaneous. Third, the 7 types of Design Changes in planting design were delineated as 'design changes for consideration of the user', 'design changes for image improvement', 'design changes for ease of maintenance', 'design changes due to the mismatch of design statement', 'design changes due to the relationship with the engineering species of other', 'design changes due to lack of field study', and 'design changes due to the consideration of feasibility.' Fourth, 'design changes for consideration of the user' and 'design changes for image improvement' were found in more than half of the frequency of the overall changes. This differed from the results shown in public corporations. Fifth, if planting construction design change process, private companies, it was found that is showing the approval of the practice after the previous construction of the construction cost savings due to construction time. However, in the case of a public corporation, these exhibited a different aspect from the private sector and show a design change procedure that reflects the changes after the design change events in the field have occurred. The above results, the type of landscaping works in planting design change of public enterprises, regardless of the private sector, is the same in the seven types, the main reason of and procedures for design changes, indicating that there are other respects. In design change, it may be desirable to apply becomes liquidity rationality and efficiency of the dimension, depending on the nature of the landscape construction.
Korean Journal of Construction Engineering and Management
/
v.20
no.4
/
pp.56-68
/
2019
An optimal selection of form-work is very important in the construction project in terms of construction cost and duration management. Also, it substantially affects the quality of the structure and the finishing work. However, in South Korea, the decision making on the selection of form-work has been based on the experience and intuition of construction practitioners not on the objective data or rational decision-making system. In order to solve the problem, several types of research on the selection of form-work has been processed. However, they did not consider the construction site condition, which is one of the most important factors for the selection of form-work. Thus, the objective of this study is developing the objective decision supporting system considering the site condition. This study provides the quantitative decision support model for optimal form-work based on construction site type. It is expected that the decision support model will help the practitioners decide optimal form-work based on the objective data. It will ameliorate the existing decision making process using experience and intuition. In addition, because the model considers site-conditions, it will provide more accurate and appropriate decision on the selection of an optimal form-work.
Proceedings of the Korean Vacuum Society Conference
/
2011.08a
/
pp.341-341
/
2011
최근 AMOLED 구동이 가능한 소자에 대한 연구가 활발히 진행중이다. AMOLED구동 가능소자는 LTPS TFT, a-Si TFT, OTFT, Oxide TFT가 있으며 그 중에서 현재 대부분 LTPS TFT를 사용하고 있다. LTPS TFT는 높은 전자 이동도와 안정성을 가지고 있기 때문에 현재 각광 받는 AMOLED에 잘 맞는다. 하지만 LTPS TFT는 고비용, 250$^{\circ}C$ 이상의 공정온도, Substrate가 Glass, Metal로 제한 된다는 문제점이 있으며, 균일성이 낮고 현재 대면적 기술이 부족한 상태이다. 해결방안으로 AMOLED를 타겟으로 하는 Oxide TFT 기술이 떠오르고 있다. Oxide TFT는 이동도가 높고 저온공정이 가능하며 Substrate로 Plastic 기판을 사용할 수가 있어 차후에 Flexible 소자로서의 적용이 가능하다. 또한 기존의 진공장비 사용대신 용액공정이 가능하여 장비사용시간 및 절차를 단축시킬 수 있어 비용적인 유리함을 가지고 있다. Oxide TFT는 단결정 산화물과 다결정 복합 산화물 두 가지 범주를 가지고 있다. Oxide TFT의 재료물질은 ZnO, ZTO, IZO, SnO2, Ga2O3, IGO, In2O3, ITO, InGaO3(ZnO)5, a-IGZO이 있다. 본 연구에서는 산화물질 중 하나인 ZTO를 이용하여 TFT 소자를 제작하였다. 산화물 특성상 열처리 온도에 따라 형성되는 결정의 정도가 다르기 때문에 온도 및 시간 변수에 따른 ZTO의 특성변화에 초점을 맞추어 연구함으로서 최적화된 조건을 찾고자 실험을 진행하였다. 실험을 위한 기판으로 n-type wafer을 사용하였다. PE-CVD 장비를 이용하여 SiNx를 120 nm 증착하고, ZTO 용액을 spin-coating을 이용하여 channel layer을 형성하였다. 균일하게 형성된 ZTO의 결정을 위하여 200$^{\circ}C$, 300$^{\circ}C$, 400$^{\circ}C$, 500$^{\circ}C$에서 1시간, 3시간, 6시간, 10시간의 온도 및 시간 변수를 두어 공기 중에서 열처리 하였다. ZTO는 약 30 nm 두께로 형성되었다. Thermal evaporator를 이용하여 Source, Drain의 알루미늄 전극을 형성하고, wafer 뒷면에는 Silver paste를 이용하여 Gate전극을 만들었다. 제작된 소자를 dark room temperature에서 측정하였다.
Current and future parallel computing model has been suggested for running and solving large-scale application problems such as climate, bio, cryptology, and astronomy, etc. Parallel computing is a form of computation in which many calculations are carried out simultaneously. And we are able to shorten the execution time of the program, as well as can extend the scale of the problem that can be solved. In this paper, we perform the actual cryptographic algorithms through parallel processing and evaluate its efficiency. Length of the key, which is stable criterion of cryptographic algorithm, judged according to the amount of complete enumeration computation. So we present a detailed procedure of DES key search cryptographic algorithms for executing of enumeration computation in parallel processing environment. And then, we did the simulation through applying to clustering system. As a result, we can measure the safety and solidity of cryptographic algorithm.
Journal of the Korea Institute of Building Construction
/
v.16
no.5
/
pp.429-436
/
2016
Because of the shortage of construction workers due to The rising labor costs and an aging labor force, construction time has been extended. As a solution, The construction time of high-rise buildings can be reduced by adopting precast concrete construction methods. Most relevant studies have focused on the development and structural analysis of such methods and not on their construction management. Therefore, this study focused on the construction management of the hollow precast concrete column (HPC) method. The objective of this study was to evaluate the performance of HPC formulations through the analytic hierarchy process and benefit-cost analysis. After a gap analysis of the available literature and expert interviews, the evaluation criteria were selected. A questionnaire survey was administered to professionals with ample experience in precast concrete construction for the pair-wise evaluation of the benefit and costs of the HPC method. The results show that the benefits of the HPC method outweighed its costs. Therefore, the HPC method is a suitable substitute for the half-slab method.
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.185-193
/
2007
In order to improve the performance of succeeding superstore construction projects, it is essential to find out an effective way for applying the opportunities of improvement on their repetitive construction process based upon the analysis of various success or failure cases occurred on previous similar projects. This research study suggests a way to improve their construction process through the applications of six sigma techniques on superstore construction projects. A literature review was implemented on the basic concept of six sigma and its general performance steps, and the step by step applications of six sigma techniques were accomplished regarding to the speciality of superstore construction projects. The opportunities of improvement for superstore projects were figured out, and the result of their applications on other superstore projects was analyzed. As a result, it was found that the adoption rate of identical success or failure cases was increased. Also, there were several improvement effects on the projects such as $10{\sim}20$ days of time savings by projects, decrease of reworks by preventing failure cases, quality and safety improvement. These results indicate that the six sigma techniques are applicable and valuable for improving the repetitive process of superstore construction projects.
Korean Journal of Construction Engineering and Management
/
v.14
no.3
/
pp.146-156
/
2013
Recently, to reflect the various needs of customers in the apartment field, the customized apartment has emerged. From the point of the customer, customized apartments have the definite advantage of being able to guarantee more customer options. On the other hand, from the point of the project manager, there are significant risk factors, with increase of management factors, construction delays, etc. The reasons for this are, to date, the insufficient systematic analysis of the project, and the lack of experience of similar projects. This study provides the waste factors of each phase in a customized apartment project. A survey and interview are conducted to achieve the waste factors using MUDA methodology; a process of the project was analyzed; and a factor of each process was identified. Also, AHP(Analytic Hierarchy Process) are used, to evaluate the waste factors in project stages. The AHP results show that "Design change" and "Inappropriate intervention in construction process" ranked highly in the waste factors. The results of our research will provide a countermeasure that addresses waste factors in similar projects, and contributes to reducing the extra cost and time in new projects.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.