Cost Prediction Models in the Early Stage of the Roadway Planning and Designbased on Limited Available Information (가용정보를 활용한 기획 및 설계초기 단계의 도로 공사비 예측모델)

  • Kwak, Soo-Nam;Kim, Du-Yon;Kim, Byoung-Il;Choi, Seok-Jin;Han, Seung-Heon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.87-100
    • /
    • 2009
  • The quality of early cost estimates is critical to the feasibility analysis and budget allocation decisions for public capital projects. Various researches have been attempted to develop cost prediction models in the early stage of a construction project. However, existing studies are limited on its applicability to actual projects because they focus primarily on a specific phase as well as utilize restricted information while the amount of information collectable differs from one another along with the project stages. This research aims to develop two-staged cost estimation model for the schematic planning and preliminary design process of a construction projects, considering the available information of each phase. In the schematic planning stage where outlined information of a project is only available, the Case-Based Reasoning model is used for easy and rapid elicitation of a project cost based on the extensive database of more than 90 actual highway construction projects. Then, the representing quantity-based model is proposed for the preliminary design stage where more information on the quantities and unit costs are collectable based on the alternative routes and cross-sections of a highway project. Real case studies are used to demonstrate and validate the benefits of the proposed approach. Through the two-stage cost estimation system, users are able to hold a timely prospect to presume the final cost within the budge such that feasibility study as well as budget allocation decisions are made on effectively and competitively.

An Integrated Cost and Schedule Control Process Model Using Earned Value Management System (EVMS를 활용한 공정-공사비 통합관리 프로세스모델)

  • Baek Seung-ho;Kim kyung-rai;Lee Yu-Seb;Lee yong-gyu
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.2 s.2
    • /
    • pp.89-97
    • /
    • 2000
  • This research has been Initiated to provide an effective management tool for budget control of the public projects using EVMS. Barriers to implementing the tool for the domestic public projects are identified : no PMB (Performance Measurement Baseline) for budget control, management by BOQ(bill of quantity), no systematic planning and control. To eliminate these barriers, an integrated cost and schedule management process model using EVMS is proposed. This model is composed of six sub processes : organizing, scheduling, budget allocating, establishing PMB, managerial analysis, change incorporation.

  • PDF

Maturity model considering the interrelation between software project management areas (소프트웨어 프로젝트 관리영역의 상호영향을 고려한성숙도 모델)

  • Jeon, Soon-Cheon
    • Journal of Advanced Navigation Technology
    • /
    • v.15 no.5
    • /
    • pp.823-832
    • /
    • 2011
  • Recently, as the project becomes larger and the number of project increases by the information system integration in the public and financial sectors, it is necessary to have a proper plan to manage the information system project. There have been many researches about the project management, success elements and failure elements, but the research on the interrelation between project management areas leaves much to be desired. This research deduces the scope, schedule, quality, work force and risk as the project management areas from the preceding research and the questionnaire and interview with PM developers, information system builders and data processing experts. And, it analyzes the interrelation and the relative importance between management areas, classifies the progress of the management areas under plan, implementation and completion stage and presents the frame to evaluate the accomplishment of each progress.

Strategy Planning for the Development of the Facility-Based Lifecycle Integrated Project Information Portal (시설물 기반 생애주기 통합 건설정보 체계 구축 전략 연구)

  • Kim, Sung-Il;Cho, Jung-Hee;Chang, Chul-Ki
    • The Journal of the Korea Contents Association
    • /
    • v.19 no.9
    • /
    • pp.26-36
    • /
    • 2019
  • Since more than 30 different information systems are collecting and providing construction related information, it is difficult for information users to figure out where and how to acquire the required information. Even if the user find the information, it is hard to meet users demand. Because the current systems accumulate the data just as administrative data and can do not connect the information from the different phases of the lifecycle for the specific facility. The information collected and managed in different information systems should be integrated in terms of lifecycle of the facility to improve money for value of public investment, the quality of life by improving quality of the facility and to provide the foundation for big data utilization in the construction industry. This paper suggested strategic planning for the development of the (assumed name) "The Lifecycle Integrated Construction Information Portal" as a foundation to use the data in construction industry, by investigating prerequisites and suggesting conceptual framework of the system.

Advanced Construction Management through an Integrated Information Control Environment (통합 건설관리 환경과 일관된 정보처리 체계의 구현)

  • Moon Sung-Woo;Kim Yong-Beom;Kim Young-Do
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.137-142
    • /
    • 2003
  • Construction CALS has been introduced with an aim to improve the effectiveness of construction management in the public sector. The objective of this paper is to provide an approach to implementing an integrated construction management environment. The environment described in this paper provides a methods for the owner and the contractor as well as designers and engineers to interact in a sing control scheme. This interaction represents the collaboration between the contractual parties for sharing construction information. XML technology has been applied as a basic technology for delivering data in the system. The XML-based forms are loaded on the system, whose data are stored in the central database right after review and approval. In future the integrated construction management environment can be further developed to the extend that the contractor's information system is directly interface with the owner's.

  • PDF

Growth Model for Korean CM Firms based on 2012 Statistics (CM기업의 단계별 발전 전략 모델: 2012년 실적자료 기반 분석)

  • Jung, Youngsoo;Shin, Dongwoo;Kang, Seunghee;Kim, Namjoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.6
    • /
    • pp.92-104
    • /
    • 2014
  • CM services have been increasingly practiced over the two decades in the Korean construction industry, and recent efforts focus on further development in advanced CM capabilities and expansion to overseas market. However, there has been lack of holistic research to investigate current status and future direction of CM industry in Korea. In this context, the purposes of this study are 1) to analyze current status of Korean CM industry in terms of owners, market, CM firms, contracts, and work scopes, 2) to define different types of CM practices, and 3) to propose growth models for Korean CM firms based on the defined CM project types. An extensive literature review and statistical analysis of 2012 CM contracts were performed in order to analyze the CM status. Based on the analyses, ten different CM types are defined, and growth paths of CM firms are illustrated. Implications and lessons learned during the statistical analysis and workshops are briefly introduced as well.

Development of an Unit Cost Modification Model for Proper Actual Cost Data in Small Building Construction Projects (소규모 건축공사의 적정 실적공사비 단가보정 모델 개발)

  • Kim, Kang-Shik;Hyun, Chang-Taek;Hong, Tae-Hoon;Jo, Seong-Min;Mun, Hyun-Seok
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.81-89
    • /
    • 2010
  • Since 2004, the government has changedthe cost estimate system to one of an actual cost basis in order to calculate the optimum construction cost by reflecting changes in circumstance on the construction site in a timely manner. Currently, this is being applied to public construction work forover a billion won of actual cost data in estimation by contract unit cost. However, directly reflecting actual cost, which for large-sized construction work was originally an average unit cost, to a small building, entails the application of a low discount rate for the cost of materials, labor, etc. and therefore can frequently give rise to cases in which the actual cost of work performed exceeds the contract sum, which in turn causes problems such as decreased revenues, bad effectson business operation, productivity, etc. Therefore, to apply actual cost to small-sized construction work (less than a billion won), there should be a plan to modify unit cost in a manner that can reflect project scale, etc. in order to resolve the problem of unit cost application of actual cost to small-building construction projects. The unit cost modification model for proper actual construction cost in small-scale construction projects developed by this study will help to increase the relevant productivity and proper gain, preventing the aggravation of business operations. Organizations placing orders are also expected to be able to secure a more realistic construction cost in arranging the budget.

An analysis of operation status depending on the characteristics of R&D projects in Sciences and Engineering universities (이공계 대학 연구과제 특성 별 운영 형태 현황)

  • Lee, Sang-Soog;Yoo, Inhyeok;Kim, Jinhee
    • Journal of Digital Convergence
    • /
    • v.20 no.4
    • /
    • pp.93-100
    • /
    • 2022
  • This study aimed to understand the current status of science and engineering university(SEU) R&D operations depending on the research project characteristics(e.g., stages and characteristics), then provide implications for future university R&D support systems and related policies. Hence, an online survey targeting SEU R&D recipients was conducted between October 4th to November 5th, 2021. Analyzing 445 valid data using the Apriori algorithm, 16 association rules for R&D operation according to the research project characteristics show that regardless of research characteristics, SEU's R&D projects, particularly in applied research, were funded or operated under the leadership of government or public institutions. For basic research, individual researchers had a higher level of autonomy in determining research topics; yet, they had a short duration (3 years) and a unit of evaluation period of more than 3 years. These findings can be empirical evidence for revealing the relationship among various variables in operating SEUs' R&D.