A Study on the Current Status and Improvement of BIM in the Government Owner Perspective - Focus on the KEPCO Na-Ju Head Office Project - (공공시설 발주자 관점에서의 BIM 적용 현황 및 개선방안 연구 - 한국전력공사 나주 신사옥 건립공사 사례를 중심으로 -)

  • Sim, Gu-Sik;Kim, Sung-Man;Ahn, Jae-Hong
    • Journal of KIBIM
    • /
    • v.3 no.2
    • /
    • pp.19-27
    • /
    • 2013
  • The application of the BIM for the KEPCO' new headquarters in Naju involved alternative approaches and accompanied many trials-and-errors as the project adopted new targets and purposes that were not used in Korea before. In particular, for a large BIM-based project, clearly defining the BIM-including the objective, scope and the outcome-is critical for a project owner. For a successful implementation, project owners should improve the utilization of the BIM. Against this background, this research examines the case of the BIM application for the KEPCO' new headquarters in Naju, identifies its effects and problems, and proposes how to improve application of the BIM for public projects. The improvement in the BIM application can be divided into several stages: project order, design development, construction, and post-construction maintenance. In the initial stage, it is important to fully discuss the project planning among participants, and clarify the goal, scope, expected outcomes and role of the BIM. In the design stage, the level of detail (LOD) for the 3D model should be defined in consideration of information use in the stages of estimation and construction. In the construction stage, the scope of project that is managed based on the processing and use of the BIM data should be clearly given and understood. After construction is complete, measures should be sought to use the BIM for maintenance, and corresponding requirements and outcomes should be provided. The analysis is expected to provide basic data for successful implementation of BIM-based public projects, by assisting project owners and involved parties in enhancing work in different stages of a project.

CM Market Revitalization Strategies in Domestic Public Construction Projects based on Questionaries and Delphi Techniques (델파이기법을 이용한 국내 공공공사 용역형 CM 시장의 활성화 전략)

  • Oh, Se-Wook;Han, Seung-Woo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.3
    • /
    • pp.131-142
    • /
    • 2012
  • Since CM for Fee has been introduced in domestic market of construction industry, Construction Management(CM) has been familiar with one of the established delivery systems in Korea. However, CM(CM for Fee) construction market has been stagnant consistently due to recent economic recessions. The fundamental causes of the current depression of CM construction market are highly related to the social/environmental factors(such as owner's negative perception about CM services, exclusive formation of the CM markets, unfeasible fee and limitations on technology developments in CM services) and the shortage of institutions associated with CM. Accordingly, fundamental improvements on the CM environment are required. This study suggests the feasible methods for improvement on CM system based on fundamental analysis of problems related to the environmental factors by conducting a delphi technique with professional personnels on various positions in CM markets.

A Study on Improvement through a Survey on the Condition of Construction Waste Treatment of Public Institutions (공공발주기관의 건설폐기물처리 실태조사를 통한 개선에 관한 연구)

  • Park, Jeong-Gwon;Lee, Myeong-Eun;Kim, Chang-Hak
    • Land and Housing Review
    • /
    • v.13 no.2
    • /
    • pp.141-150
    • /
    • 2022
  • The government introduced a waste disposal share system to reduce the annual increase in construction waste and to increase the recycling rate. As a result, the cost of waste treatment by public institutions is growing inevitably, causing disagreements and disputes between the public owner and the construction waste treatment company. They are also arguing for an increase in construction waste disposal costs. Therefore, in this study, an on-site survey was conducted to identify the current construction waste management problems and to find improvements. The survey was conducted for supervisors of public institutions, construction companies, and those related to waste treatment companies. The survey results were analyzed by dividing the construction waste management, regulations, treatment cost, and treatment method. The results of this study were used as primary data for changes in the construction waste guidelines and waste treatment costs of public institutions.

A Study of the List for CM Product Measure Check-List through 4 Way View;Focusing on Owner, CMr, Designer, Constructor (4자관점을 통한 CM의 성과측정 체크리스트 항목에 관한 연구)

  • Ahn, Eun-Jin;Kim, Ju-Hyung;Lee, Yoon-Sun;Kim, Jae-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.509-512
    • /
    • 2007
  • In Domestic, the beginning of CM system was at December 1996 by 'Construction Industry fundamental law'. Today the needs of CM is more and more during 10 years. Although the time of CM's induction and high-quality human resources are insufficiency, various studies and developments's level through theoritical base and academic level is good which are compared by developed countries's. But still now the effort of CM product measure part, especially public sector is not enough. Besides, the existing check-list is for project owner so it needs to make up for balanced view as organized 4way-view of owner, CMr, designer, constructor. On this study, produce the list of check-list and then weight of each list by view of owner, CMr, designer, constructor. The completec check-list will be useful for CM product measure objectively .

  • PDF

Satisfaction Level and Performance Evaluation for CM Service in Korea (국내 건설사업관리 업무만족도 및 성과평가)

  • Kim, Won-Tae;Chang, Chul-Ki
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.4
    • /
    • pp.108-117
    • /
    • 2013
  • The domestic CM business market has continued to grow, but its size is relatively small yet in comparison with the total size of the domestic construction industry. Evaluation of CM projects was conducted through questionnaire surveys. Both clients and CM firms showed positive satisfaction levels. Nevertheless, the clients' satisfaction levels were relatively low in safety management, cost management, and document and information management. Superior areas of CM tasks were time management and recovery scheduling, quality control and technical instruction, and design value engineering. On the other hand, inferior areas of CM tasks were claim analysis and dispute resolution, cost estimation, and life cycle costing. Both entities have agreed with the positive effects of CM involvement in terms of cost saving, time reduction, quality improvement, and safety incidents prevention to at least 0~5% extent.

The Trend of CM at Risk in the U.S Construction Market (미국 CM at Risk 시장 동향 및 시사점)

  • Chang, Chul-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.67-73
    • /
    • 2006
  • Alternative project delivery methods including design-build and CM at Risk have evolved as a means of meeting owner's diverse needs and implementing project efficiently with limited budget and time in more competitive construction environment. It is time to consider adopting alternative project delivery methods, especially CM at Risk, for domestic construction industry to enhance competitiveness and to provide various options for owners so that they can select more appropriate project delivery methods for the facility being planned. This research report derives suggestions from investigating how CM at Risk has been evolved in the US construction market. Besides the analysis of CM at Risk market in the US construction industry, the characteristics of companies whose market share are in Top 100, the type of facility usually built by this method were investigated. Based on the analysis of CM at Risk in the US, the prepositions in adopting CM at Risk to domestic construction industry and the possibility of adopting this method have been identified.

  • PDF

A Study on the Suggestion of Construction Contract Practice in the Public Project through the analysis of Construction Claims (건설클레임 사례분석을 통한 입찰 및 계약제도 개선에 대한 연구)

  • Cho Young-Jun;Hyun Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.1 s.5
    • /
    • pp.78-87
    • /
    • 2001
  • Recently many construction claims related to the ommission and discrepancy of design document are alleged since 1998 and various dispute resolution methods are appeared. But many contractors alleged claims are not satisfied with the result because of not sufficiently reflecting construction practice. The purpose of this study is to analyze the liability of contract privity from the view point of the contract related law and to analyze the claims and claim factor, and to suggest construction contract practice in the public project. The construction claims related to the design document may be minimized, through (1) the accumulation and retrieval of standard forms by owners' type, (2) the usage of specified specification considering project characteristics, (3) the materialization of detail subsurface design and various contract method in heavy engineering construction.

  • PDF

Stakeholder's Valuation of Public PMO System Using Laddering (래더링 기법을 이용한 전자정부사업관리 위탁(공공 PMO)제도의 이해관계자 별 가치체계)

  • Back, Hyung-Chung;Park, Chan-Hyuk;Jang, Seong-Yong;Kim, Ja-Hee
    • Journal of the Korea Society for Simulation
    • /
    • v.24 no.4
    • /
    • pp.127-136
    • /
    • 2015
  • The e-government project management consignment system to allow the public PMO has been introduced to resolve the quality management issue and the business risk, pointed out by the reorganized Software Industry Promotion Act. The additional regulation improvements are demanded because the public PMO system cannot settle down due to the different opinions among related parties: owner, operator and PMO. Therefore, to make balanced regulation improvements, the in-depth studies are necessary to analyze the fundamental causes of the disagreement between the related parties. This study analyses the each related party's cognitive structure to perform public PMO successfully and the fundamental reasons that cause the different opinions by applying the cognitive psychological Means-end chain theory, the laddering technique and the HVM, Hierarchical Value Map. In addition, this study analyses the regulations required for the related parties to obtain the expected benefits.

Effects of the Methods for Generating and Selecting Multiple Preliminary Prices on Budget Prices in Bidding Processes (복수예비가격 생성 및 추첨방법이 예정가격에 미치는 영향)

  • Kang, Minseok;Riew, Moon Charn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.1
    • /
    • pp.89-97
    • /
    • 2015
  • In bidding processes conducted by government agencies, local governments or public agencies, budget prices are critical to both ordering bodies and bidders since budget prices are bases for selecting a successful bidder. Since a high budget price goes against ordering bodies and a low one goes against bidders, most ordering bodies adopt a system using multiple preliminary prices for determining a budget price to ensure fair and transparent manners. Discussed are how budget prices change depending on the methods of sampling 15 preliminary prices and the methods of sampling 4 out of 15 prices. Computer simulation is conducted to analyze budget prices for various methods to determine multiple preliminary prices. It is more likely for budget prices to be close to base prices when splitting a range of generating preliminary prices into 15 intervals and taking 4 preliminary prices from 15 intervals than when taking 4 preliminary prices from a whole range. In cases when splitting a range of generating preliminary prices, if we take 2 preliminary prices out of intervals above 100% and take 2 out of intervals below 100%, the expected budget prices are equal to a base price and the standard deviations are about half in comparison with those when taking 4 out of 15 intervals.

법령과 고시 ② - 최저가낙찰제가 종합심사낙찰제로 개정

  • 대한기계설비건설협회
    • 월간 기계설비
    • /
    • s.306
    • /
    • pp.94-98
    • /
    • 2016
  • 300억원 이상의 국가 및 공공기관 발주공사에 대해 최저가낙찰제를 대신하여 종합심사낙찰제 전면 실시 등의 내용을 담은 국가계약법 시행령이 개정되어 2016년 1월 1일부터 시행에 들어갔다. 종합심사낙찰제는 가격 뿐만 아니라 공사수행능력, 사회적책임을 종합 평가하여 낙찰자를 선정하는 제도로 기존의 최저가낙찰제에서 발생한 덤핑낙찰 및 이로 인한 잦은 계약변경, 부실시공, 저가하도급, 임금체불, 산업재해 증가 등의 문제점을 해소하기 위해 도입된 제도이다. 종합심사낙찰제 도입에 따라 공사 품질이 제고됨으로써 생애주기(lifecycle, 유지보수비용 등을 포함) 측면에서의 재정효율성 제고를 비롯하여 불공정 하도급 관행 개선 등 건설산업의 생태계 개선과 함께 시공결과에 책임짐으로써 기술경쟁 촉진 등 건설산업의 경쟁력 강화 효과도 기대된다. 또한 국가계약예규도 개정되어 주계약자관리방식에 의한 공동계약(주계약자 공동도급)이 최저가낙찰제에서 종합심사낙찰제로 전환됐다.

  • PDF